Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Mineral Processing:Environment, Economics,and Energy are CriticalBy R. Addison, P. V. Avotins, D. W. Kestner, M. F. Dibble, L. A. Haas, M. D. Flavel, D. Halbe, D. J. Barratt, G. V. Jergenaen
Mineral processing in 1980 can be described by several key words, familiar to the industry throughout the past decade: complex, low grade, environmental, energy, high tonnage, and economics. Flowsh
Jan 5, 1981
-
Heat Generation and Climatic Control in the Operation of Tunnel Boring MachinesBy S. J. Bluhm
INTRODUCTION Lesotho is a mountainous area of southern Africa from which water is to be exported in an extensive tunnel system, to industrial regions inland. The related tunnelling project has inv
Jan 1, 1997
-
The Technology of Underground Construction Present and FutureBy Ralph B. Peck
Exploration The technology of underground construction and particularly of tunneling, both now and in the future, starts with knowledge of the properties of the medium surrounding the tunnel. Alth
Jan 1, 1974
-
Increased Recovery From Preg-robbing Gold Ore At Penjom Gold MineBy Gordon Lewis
The Penjom Gold Mine is one of the world's worst preg-robbing gold ores, yielding very low recoveries from traditional CIL methods. Gold recovery from the cyclone underflow was targeted to recover as
Jan 1, 1999
-
Heap Leach Or Mill Economic Considerations In A Period Of Stable Gold PricesBy Daniel W. Kappes
Until recently, the general expectation among mining companies and financial analysts has been that the price of gold would remain on a generally upward slope. The recent drop in the price of gold ha
Jan 1, 1998
-
Developments in Australia’s Surface Coal MinesBy John Brett
BHP Australia Coal Pty. Ltd. (BHPAC) manages and, through its parent company BHP, partly owns seven large opencut mines in the Bowen Basin of Central Queensland, Australia. In terms of developments in
Jan 1, 1995
-
Fast Tunneling With Drill & Blast Tunnel and Shaft Construction at the Sixth Water AqueductBy Bruce McKinstry
INTRODUCTION In June of 1992, the Bureau of Reclamation, United States Department of the Interior, awarded the contract for construction of the Sixth Water Aqueduct to the Fedrick-Redpath Joint Ventu
Jan 1, 1995
-
Environmental Behavior Of Two Molybdenum Porphyry SystemsBy M. L. W. Tuttle, B. R. Berger
Our study focuses on the geology, hydrology, and geochemistry of a variety of molybdenum (Mo) porphyry systems. The systems are either high fluorine, granite, Climax-type, systems (e.g. Mount Emmons/
Jan 1, 2004
-
The Production Of Ferronickel By The Rotary Kiln-Electric Furnace ProcessBy Hans Skretting, Abraham A. Dor
This paper briefly reviews the historical development of the Rotary Kiln-Electric Furnace Process, which was first applied commercially to the treatment of qarnieritic ores in New Caledonia in the mid
Jan 1, 1979
-
The Use of Cloud-Based Geotechnical Software During the Final Design of the New Haven Downtown Storm Sewer Infrastructure Improvement Project - NAT2022By Michael Schultz, Gregory Sanders
The City of New Haven is planning to construct the Downtown Storm Sewer Infrastructure Improvement project to mitigate on-going stormwater flooding in the Long Wharf District. The proposed project inc
Dec 1, 2022
-
The Evaluation Of A South African Gold Mineral Rights Portfolio With The Aid Of A MicrocomputerBy Peter McKenna
A mineral rights holding can ultimately only be turned to account by the profitable mining of ore on that property. The evaluation of South African gold mineral rights properties must therefore be car
Jan 1, 1989
-
Reinforcement Learning Applied to Fleet Allocation and Informed Short-Term Production Planning of Industrial Mining ComplexesBy J. P. De Carvalho, R. Dimitrakopoulos
An actor-critic reinforcement learning approach is presented to improve the production of an industrial mining complex by defining shovel allocation and adapting the short-term plan given grade-contro
Jun 25, 2023
-
The Development of Fracture Networks by Shear: Experimental Results.By ev, Ze&apos Reches
The growth of networks of shear fractures is explored in a series of experiments with samples of wet clay. The samples are subjected to plane strain deformation in a rigid apparatus. The individual fr
Jan 1, 1986
-
Simulating Crushing Operations In An Aggregates QuarryBy P. Ritsopoulos, A. J. Dentsoras
The objective of this paper is the development of a reliable simulation model for the operation and production capacity of an aggregates quarry. Based on this model, a computer program is introduced t
Jan 1, 1998
-
Fundamentals of Sulfide Mineral FlotationBy S. Chander
The fundamentals of flotation are reviewed with an objective to understand the limitations in predicting the performance of a sulfide mineral flotation system and in its scale-up from laboratory studi
Jan 1, 1999
-
Radio Frequency Identification (RFID) Applications In MiningBy D. Puckett
The feasibility of maintaining equipment location, personnel location and vital statistics in surface and underground mining operations has increased with advances in radio frequency identification (R
Jan 1, 1996
-
30th Forum On The Geology Of Industrial Minerals: Nova Scotia/New Brunswick, CanadaBy John H. Fowler
The 30th Forum on the Geology of Industrial Minerals will be held in the historical seaside city of Halifax, Nova Scotia, from May 22 to May 27, 1994. The Forum will be co-hosted by the Provinces of N
Jan 1, 1995
-
Remotely Controlled Direct Pipe Jacking Experiences In Oakwood Beach Interceptor, Staten Island, NYBy Dipak D. Shah, Sajjan K. Jain
An interceptor sewer, 2103 linear meters (6900 Ft), 1.52 meter (5 ft) in nominal diameter, is installed by a direct pipe jacking system utilizing a remotely controlled fully automatic slurry shield ma
Jan 1, 1991
-
Development of Fully Autogenous Grinding Within Boliden MineralBy Ulf Marklund, Stig Markstrom
Pioneering work with pilot scale autogenous grinding started in Boliden 1956. From 1961 to 1991 eleven fully autogenous grinding (AG) circuits have been installed at various concentrators within the B
Jan 1, 1998
-
Construction of the Inter-Island Tunnel Boston Harbor ProjectBy A. J. Stewart, R. L. Shufflebotham, D. W. Ferguson, T. L. Page
The Inter-Island Tunnel is a 7.7 kilometer (25,160 foot) long by 3.5 meter (11.5 feet) diameter concrete lined tunnel through the Cambridge formation below Boston Harbor. Constructed as part of the Bo
Jan 1, 1997