Simulation Of Sub-Sea Gravel Removal Using The Coupled Computational Fluid Dynamics - Discrete Element MethodBy D. Ackerman, S. Cole, G. Langefeld, I. Parker
The removal of gravel from the seabed using a hydraulic mining tool is a complex multi-phase problem that cannot be analysed using traditional continuum based simulation techniques. One potential appr
Jan 1, 2007
-
Manganese Removal From Cobalt Solutions With Dilute Sulphur Dioxide Gas MixturesBy J van Rooyen, S. Archer, M. Fox
The use of dilute sulphur dioxide (SO2) gas mixtures for the oxidation/precipitation of manganese has been explored widely in recent years. The technical merit of the concept is well proven and implem
Jan 1, 2007
-
Modelling Of Separation Circuits Using Numerical AnalysisIt is desirable to have a model, or method, for major project development, which will enable flexible modelling of separation circuits. This ability improves the understanding of circuits and how they
Jan 1, 2007
-
The Role Of Simulation Modelling In Project Evaluation (a4b73ae2-ef8e-4c24-a304-40977e83102c)By R. Hoare
TSG Consulting works with many of the major global mining companies using simulation modelling as an integral component in their development team's processes to determine which combination of inf
Jan 1, 2007
-
The evaluation of various oxidants used in acid leaching of uraniumBy R. Venter
Uranium in the tetravalent state has very low solubility in acid and alkaline solutions and needs to be oxidized to the hexavalent state to become soluble. In acid leaching of uranium the uranium is o
Jan 1, 2009
-
The impact of forward sales on the price of goldBy H. L. Monro
The individual supplies of and demands for gold that make up the total supply/demand structure in any year, together with their individual price elasticities, are used to determine the effect of forwa
Jan 1, 1992
-
Project management on a reimbursable, plus- fee contractBy F. van Heerden
The paper sketches the. management of the various phases in a cost-reimbursable, plus-fee contract. which is claimed to be the most flexible of all contracts. In this type of contract, the contractor
Jan 1, 1982
-
The dissolution of gold from roasted pyrite concentratesBy A. O. Filmer
A study of the dissolution of gold from a pyrite concentrate and from various calcines is reported. The percentage extraction of gold was found to decrease with increasing sulphur content in the mater
Jan 1, 1982
-
The Pumping Characteristics And Rheology Of Paste FillsBy C. G. Verkerk
The paper discusses the transport and rheological characteristics of high concentration slurries or pastes for backfill purposes. The influence of pipe size, particle size distribution, additives, coa
Jan 1, 1988
-
Research into the ferrous metallurgy of Rhodesian Iron Age societiesBy M. D. Prendergast
Research into the ferrous metallurgy of Rhodesian Iron Age societies M. D. PRENDERGAST (Visitor) Iron-working was a widespread economic activity in Iron Age Rhodesia, and merits historical and metallu
Jan 1, 1974
-
Petroscopic observations of rock fracturing ahead of stope faces in deep-level gold minesBy A. J. Jager, G. R. Adams
The pattern of mining-induced fractures ahead of stope faces in deep-level gold mines, as revealed by petroscopic observations, is described. It is shown that there are zones of fractured and unfractu
Jan 1, 1980
-
Internal power losses occurring at the wavefront of traveling transverse disturbances on mine hoisting cableBy R. R. Mankowski
The work described here is an extension of current theory applied to obtaining the power dissipated at the wavefront of a transverse disturbance traveling along a mine hoisting cable. A previously der
Jan 1, 1990
-
Problems encountered during the commissioning of the carbon-in-pulp plant at Beisa MineBy A. P. W. Briggs
Difficulties with the screening of large volumes of pulp to remove plus 600 /km material before the adsorption circuit and to retain plus 20-mesh carbon in the adsorption contactors have largely been
Jan 1, 1983
-
Phase equilibria and thermodynamics in the lead-lead sulphide systemBy M. Timucin
High-temperature phase relations in the Pb-PbS system were established by the quenching of samples equilibrated in evacuated and sealed silica capsules. The liquid-miscibility gap seen in some previou
Jan 1, 1988
-
The Effect Of Particle Sharpness On The Wear Of Backfill PipelinesThe relationships between backfill-transportation parameters (solids concentration, velocity, and pipe diameter) and the wear rate of backfill-transportation pipelines is well understood. However, the
Jan 1, 1993
-
Geological Modelling and Mineral Estates Management Using an Integrated Graphics SystemBy L. H. W. Walker
As part of an overall design of a computer based mining managerial system, the geological and mineral estates management disciplines find themselves centrally placed in terms of producing fundamental
Jan 1, 1987
-
Laboratory Simulation Of The Strip Rolling Of Plain Carbon And Niobium-Microalloyed SteelsBy K. M. Banks
Multiple-pass hot-strip-rolling schedules of carbon steels and niobium-microalloyed ferrite-pearlite steels were simulated on a Gleeble 1500 thermomechanical test apparatus. The effects of finishing t
Jan 1, 1993
-
Small Mines / General Interest -The Mintek Small Mine Case Study - Venmag - IntroductionBy R. L. Paul
Although it is often said that South Africa does not have suitable deposits, or the potential to develop mines on a small scale, a recent survey by the Chamber of Mines1 showed that, out of a sample o
Jan 1, 1997
-
A literature review of the ignition of methane-air mixtures by coal-cutting picksPast work on the ignition of methane-air mixtures by coal-cutting picks is reviewed, with special reference to the factors that contribute to ignitions and ways of reducing them. The main conclusions
Jan 1, 1985
-
In-stope leaching with thioureaBy P. A. Laxen, P. J. van Staden
In situ leaching tests with thiourea as the lixiviant were caried out in two worked-out stopes at the No. 6 shaft at Rand Leases Gold Mining Company. Dissolution rates of 0,9 and 0,7 9 of gold per wee
Jan 1, 1989