Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
 - Most Recent
 - Alphabetically
 
Sort by
- Relevance
 - Most Recent
 - Alphabetically
 
- 
                    
                Biological pre-treatment for the recovery of gold from slimes damsBy J. L. Taylor, E. N. Lawson, Hulse. G. A.
It is generally recognized that a large proportion of the gold remaining in the residues from metallurgical plants on the Witwatersrand is occluded in pyrite. The conventional flotation-roasting proce
Jan 1, 1990
 - 
                    
                Annual Report and Accounts for the year ended 30th June, 1979Council and Standing Committees, 1978-1979 President: Dr M. G. Atmore. Vice-Presidents: D. A. Viljoen and Dr P. R. Jochens. Honorary Treasurer: J. K. E. Douglas. Immediate Past President: P. A. vo
Jan 1, 1979
 - 
                    
                Annual Report and Accounts for the year ended 30th June, 1985Council and Standing Committees-1984/85 President: J.D. Austin Vice Presidents: H.E. James and Dr H. Wagner Immediate Past President: Prof. R.P. King Honorary Treasurer: Prof. D.G. Krige Members o
Jan 1, 1985
 - 
                    
                State Of The Art Recovery Plant DesignBy D. M. C. Valbom
The introduction of new diamond sorting technologies as well as additional manufacturers I vendors, has increased the equipment selection and combinations available for recovery flowsheet design. This
Jan 1, 2010
 - 
                    
                O.F.S. Branch (e20f6d44-3414-45dc-9a03-c6cb75ee797b)O.F.S. Branch Minutes of the Committee Meeting held in the Committee Room at the St. Helena Club at 4.45 p.m. on Wednesday, 3rd September, 1975. Book reviews JONES, M. J. (ed.). Minerals and the envir
Jan 12, 1975
 - 
                    
                A Rapid Method of Calculating Temperature Increases along Mine AirwaysBy A. M. Starfield
SYNOPSIS A description is given of a new computer programme that has been developed for the rapid computation of the changes in temperature and humidity of air passing through mine airways. The progr
 - 
                    
                The development of continuous fluidized-bed ion exchange in South Africa, and its use in the recovery of uraniumBy A. K. Haines
The status of the South African research and development programme on continuous ion exchange, which was aimed at the technical and economic assessment of that process for the recovery of uranium, is
Jan 1, 1978
 - 
                    
                Metso Outotec VSF®X Solvent Extraction for Sicomines Phase II ProjectBy H. Laitala, M. Lampi
Metso Outotec has developed a wide range of solvent-extraction technologies over decades and has introduced Metso Outotec VSF®X solvent-extraction plant. Standardized and modularized, Metso Outotec VS
Jan 1, 2023
 - 
                    
                Methane drainage in longwall coal miningBy A. W. de Villiers
This paper explores the behaviour of methane in the goaf during longwall mining, together with some methods for the control of methane emissions into the goaf, the working face, and the ventilation sy
Jan 1, 1989
 - 
                    
                Coal Mine Ventilation Systems in the United States of AmericaBy R. V. Ramani, R. Stefanko
"The favorable mining conditions in the United States of America that resulted in the development of the highly productive room and pillar systems are largely disappearing. Increasing mechanization, p
Jan 1, 2014
 - 
                    
                Author's Reply to DiscussionBy D. G. Krige
D. G. Krige: The stimulating contributions from Messrs Cooke, Curtis, Martus, Johnston, Van Wyk, Van Rensburg and Wroth are appreciated by the author and provide clear evidence of the importance not o
 - 
                    
                A Review of Rock Cutting for Underground Mining: Past, Present, and FutureBy D. Vogt
"Rock has been cut in the process of mining since before the invention of explosives. Today, we seek to return to cutting to reap the benefits of continuous operations for South African underground ha
Jan 1, 2016
 - 
                    
                An integrated approach of apatite-nepheline beneficiation plant revamp for yield increase: case study of beneficiation plants ANOF-2 and ANOF-3, А. Klemyatov, N. Rozhdestvenskiy, А. Kalugin, S. Zbinets, U. Gordeeva, and T. VologdinaBy А. Klemyatov, T. Vologdina, U. Gordeeva, S. Zbinets, А. Kalugin, N. Rozhdestvenskiy
The plants integrated in the PhosAgro group of companies perform processes from scientific research to the project, from ore mining to shipment of fertilisers and feed additives to consumers. An exten
Jan 1, 2020
 - 
                    
                A Quantitative Model for Gravity Separation Unit Operations that rely on StratificationBy R. P. King
A class of gravity separation unit operations in ore-dressing relies for its operation on the production of a stratified bed. Heavier material gravitates downwards, and separation is achieved by split
Jan 1, 1987
 - 
                    
                GEOSTAT1: A Prototype Expert System for the Explicit Knowledge Approach to GeostatisticsBy M. David
This paper addresses the problem of technological transfer in geostatistics. Expert systems have become popular in certain fields because the needs of the industry are not provided for by traditional
Jan 1, 1987
 - 
                    
                SPOTLIGHT on mining in the vicinity of geological and hazardous structuresBy R. W. O. Kersten
The South African Institute of Mining and Metallurgy collaboration with the Chamber of Mines of South Africa, arranged a colloquium to inform mine management of the current state of knowledge on the r
Jan 1, 1986
 - 
                    
                Economy-Wide Impact Of A Mineral Project In A Developing Country: A Graphic IllustrationBy G. D. Schena
The issue of evaluating the economic impact of large mineral projects in developing countries was studied by the use of econometric models. The evaluating system is demonstrated by its application to
Jan 1, 1993
 - 
                    
                Activity-Based Risk Management for the Acquisition of Electronic Mine Safety EquipmentBy A. J. Hofmann, G. P. R. van der Merwe, J. E. W. Holm
"A new approach is proposed to perform relativistic comparisons between alternative operational risk management solutions by taking into account the impact of each operational activity on overall syst
Jan 1, 2017
 - 
                    
                Applied Ergonomics For Operator Compartment Design In An EJC 88 XLP LoaderBy N. D. L. Burger, S. Thorley
In engineering design of operators? compartments, in underground mining equipment, ergonomics principles are often neglected or not given the full recognition they deserve. This paper defines ergonomi
Jan 1, 2004
 - 
                    
                The Effect on the Production of Bantu, Engaged on Tram-Shovelling, of Different Temperature ConditonsBy J. H. Viljoen, J. F. Morrison, C. H. Wyndham
SYNOPSIS Heart rates, oral temperatures, shovels/min and number of 3/4 ton cars/hour trammed over distances of up to 350 ft were measured in samples of 6-10 miners, engaged in tram-shovelling, at 76°