Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Guide to the Preparation of Papers for Publication in the JournalThe following notes have been compiled to assist authors in the preparation of papers for presentation to the Institute and for publication in the Journal. STANDARDS FOR ACCEPTANCE To merit consid
-
New perspectives for mine automation by multi media capable control systemBy C. Mueller
In many automated mines, multi media video and audio funtionality has to be combined with sensor information or steering commands, which is the idea of a new, PC based integrated and multi media capab
Sep 1, 2001
-
Rectangular Furnace Design And Revolutionary DC-Slag Cleaning Technology For The PGM IndustryBy J. Kempken, T. Schreiter, R. Degel, H. Schmieden
After a short summary of the historical milestones of the submerged arc furnace, the paper will highlight different applications and their specific smelting furnace requirements in the non-ferrous are
Jan 1, 2006
-
The Use of Dynamic Programming for Determining Mine-Mill Production SchedulesBy Ronald J. Roman
All mining and milling complexes can, within limits, operate at a variety of production rates. Factors of economic importance that are affected by production rates are costs per unit production, recov
Jan 1, 2014
-
Influence of ground motion model selection on seismic hazard for JohannesburgBy R. J. Durrheim, B. Manzunzu, V. Midzi
Selecting ground motion prediction models (GMPM) is crucial in assessing seismic hazard levels in a specific region. This study investigates the influence of ground motion model (GMM) selection on sei
Jan 12, 2025
-
Effect of magnesium precipitate in thickening flocculation processes: a molecular dynamics study, G.R. Quezada, R.I. Jeldres, and P.G. ToledoBy P. G. Toledo, R. I. Jeldres, G. R. Quezada
Chile is the main producer of copper in the world and lately the mining industry has suffered challenges due to the lack of water in the north of the country, along with the new policies of not using
Jan 1, 2020
-
Methodology for Evaluation of Mud Rush Risk in Block Caving MiningBy K. Basaure, S. Palma, R. L. Castro
"Mud rushes are sudden inflows of fine wet ore within underground mines; they can harm people and equipment as well as cause production delays. Block and panel caving mines are prone to mud rushes in
Jan 1, 2017
-
President?s Page ? The changing scenePapers and Contributions Since the Institute's inception, it had been our practice until some years ago to meet regularly for discussion of new developments, using as a basis a paper read by one
Jan 1, 1991
-
Proceedings of the June, 1969, General MeetingThe June General Meeting of the Institute was held in Kelvin House, Johannesburg, on 18th June, 1969, at 4.30 p.m. Mr J. K. E. Douglas (Vice-President) was in the Chair. There were also present
-
Mine To Metal: A Practical Balance For A Large Platinum ProducerBy H. E. Bartlett
This paper deals with the sampling and mass measurement for ore delivered from a shaft to a processing plant and the contribution of the data from these measurements to the metal balances from shaft d
Jan 1, 2014
-
Scale-Up Procedures For Gold-Adsorption Systems. Part 2: Mixing RequirementsBy K. I. Afewu, L. C. Woollacott
The design of in-pulp adsorption vessels in the gold industry has, for the most part, been seen as a problem involving the suspension of fine particles o ore in a slurry. The need for the vessel to be
Jan 1, 1995
-
Optimization of Circuits for Pressure Leaching of Sulphide Ores and Concentrates"Pressure leaching is an option for copper recovery from chalcopyrite. Leaching takes place at high temperatures and pressures in the presence of an oxidizing agent. This work shows how the performanc
Jan 1, 2016
-
Annual Report and Accounts for the year ended 30th June 1987PREFACE During the past year, considerable effort was devoted to the implementation of the strategic plan that was adopted by the SAIMM in 1986. Good progress was made in a number of areas, while in
Jan 1, 1987
-
Electric Rock Drilling System For In-Stope Mining In Platinum OperationsBy P. J. Petit
The strategic mission of the South African mining industry is to extract the mineral assets in an energy efficient, economical and safe manner. Drilling has received particular attention in the last f
Jan 1, 2006
-
Water requirements for the recovery of diamonds using grease technology - SynopsisBy J. Danoczi
South Africa is running out of fresh water and is looking at ways to improve water usage. This report addresses how a diamond mine in Gauteng has improved the utilization of its water resources. In t
Jan 1, 2008
-
Suggested thermal stress limits for safe physiological strain in underground environmentsBy J. M. Stewart, C. H. Wyndham
Suggested thermal stress limits for safe physiological strain in underground environments by J. M. STEW ART M.Sc. (Eng) (Witwatersrand) (Visitor) and C. H. WYNDHAM M.B., D.Sc. (Witwatersrand), F.R.C.P
Jan 8, 1975
-
An integrated mining and extraction system for use on Witwatersrand minesBy P. J. D. Lloyd
An account is given of the development of a process to concentrate gold and other valuable minerals and to produce a discardable waste. In this process, the ore is coarsely milled, a bulk flotation co
Jan 1, 1979
-
Optimizing Medium - Term Operational Plans for a Group of Copper MinesBy M. Splaine, W. Davidson, D. C. Atkinson
Since 1964, Nchanga Consolidated Copper Mines, Ltd., has been developing and using production scheduling methods for optimizing its metallurgical operations in the short term (up to one year). Medium-
-
The determination of haulage-truck requirements for an open-pit operationBy M. B. Algeo, R. H. A. Plaistowe
A method of forecasting the haulage trucks required for a large open-pit operation is described. Emphasis is placed on the effects of changes in planning and on the complexities of a mining operation
Jan 1, 1979
-
The commissioning of a test facility for the calibration of anemometersBy J. J. Van Rensburg
The commissioning of a test facility for the calibration of anemometers by J. J. VAN RENSBURG (Student Member). After the erection of a commercially produced open-jet wind tunnel for the calibration o
Jan 4, 1975