Execution of Pile Installation in Environmentally Challenging SitesBy Dena Morgan, Emre Biringen
"Abstract This paper discusses the execution of pile installation and design issues at two environmentally challenging industrial sites in North America. Environmental regulations set constraints on t
Jan 1, 2014
-
Design Of Bearing Plates For Anchors In Geo-ApplicationBy Andrew Baxter
This paper focuses on the design of steel bearing plates to transfer load from tiebacks and tiedowns to a concrete mass. It lists and describes the various available procedures for design of bearing p
-
Improved Drainage by Drilled Filter Drains, Dam Safety Upgrade, Case StudyBy Carl-Oscar Nilsson, Åke B. Nilsson
"The embankment dam at Storfinnforsen is 23 m high and was completed in 1954. The dam has an impervious zone with timber sheet piles and a support fill of glacial till. The pore water pressure in the
Jan 1, 2016
-
Assessment, Remediation And Acceptance Of Drilled Shafts Through The Use Of Csl TestsBy Bernardo J. Jiménez Vega, Edy L. T. Montalvan PhD
The experience gained during more than 900 Crosshole Sonic Logging (CSL) tests on drilled shafts shows the importance of establishing proper project acceptance and repair protocols. Drilled shaft eval
Oct 1, 2022
-
130 M Deep Bored Piles – A New SuperlativeBy Vijay Kumar, Serhat Baycan, Karsten Beckhans
For the deep foundation of podium and tower of the Kuala Lumpur City Centre, BAUER (MALAYSIA) SDN. BHD. constructed 225 bored piles with diameter range of 2.0 to 2.5 m. In order to comply with the dep
Nov 1, 2022
-
Performance of Cement Deep Mixing Method in 2011 Tohoku EarthquakeBy Shoji Higashi, Nobuhiro Honda, Takeo Asanuma, Tatsuo Nagatsu, Masaki Kitazume, Sachihiko Tokunaga, Shigeru Kubo, Hidenori Takahashi, Tsuneyasu Onishi, Yoshiyuki Morikawa
"Various kinds of civil engineering structures and facilities were seriously damaged in the earthquake in Tohoku and Kanto regions of Japan on 11 March 2011 due to the greatness of its magnitude. In c
Jan 1, 2015
-
Atoka Pipeline - Canadian River CrossingBy Jewels Stover, Charles A. Luxford
Oklahoma City is undergoing a replacement program for an existing 66in (1.675m) water pipeline that conveys raw water from Atoka Reservoir to the City. This pipeline currently crosses the Canadian Riv
Sep 8, 2021
-
Post-Katrina Emergency Interim Flood ProtectionBy Fred Fuchs
"Most deep foundation work is either unseen by the general public or viewed as an inconvenience in their daily lives. Hurricane Katrina changed that perspective for everyone in New Orleans — and many
Jan 1, 2008
-
Simplifying the Design of Laterally Loaded Piles for Waterfront StructuresBy Amanda R. Parry, Chris R. Pray
Predicting and modeling the soil structure interaction of laterally loaded piles with significant unbraced lengths is one of the challenges faced in designing many waterfront structures. Designers of
Sep 8, 2021
-
Permanent Earth Retention for Deep Excavation Installed Within Minimal Right of Way LimitsBy Thomas D. Humbert, Christopher J. Ramsey
Construction of a new underground parking structure in State College, Pennsylvania, is situated on a site constrained by limited ROW and required excavations ranging in depth from 25 ft to 40 ft. Addi
Jan 1, 2019
-
Installation Of Augered Cast-In-Place PilesBy Michael Moran
Typical ACIP Pile Rig [ ] Hollow Stem Auger ? Continuous flight auger ? 3 inch inside diameter pipe ? Auger diameters: 12, 14, 16, 18, 20, 22, 24, 30, and 36 inches ? Auger section lengths:
Jan 1, 2005
-
Elimination of Environmental Footprint: LVCC Expansion - Foundation InstallationBy Zachary Q. Maassen
Upon approval from the Las Vegas Convention and Visitors Authority (LVCVA), Turner/Martin Harris, A Joint Venture began construction on the estimated $860 million expansion for the Las Vegas Conventio
Jan 1, 2019
-
Micropiles for Seismic RetrofitsBy Rob Jameson
"Although seismic retrofit is recognized as a key micropile application, widely-used reference documents do not clearly address design and testing recommendations for micropiles that are loaded primar
Jan 1, 2009
-
Rehabilitation of an Existing Mechanically Stabilized Earth Wall Using Soil NailsBy Daniel A. Thome, Robert C. Janke
"Installation of permanent soil nails through distressed mechanically stabilized earth retaining walls is a cost effective and aesthetically pleasing solution when using the appropriate equipment and
Jan 1, 2005
-
Guideline for Interpretation of Nondestructive Integrity Testing of Augered Cast-In-Place and Drilled Displacement Piles"1 INTRODUCTIONThe use of nondestructive testing (NDT) methods to evaluate the integrity of Augered Cast-in-Place (ACIP) and Drilled Displacement (DD) piles has been a subject of significant debate am
Jan 1, 2016
-
Impact Of Groundwater Flow On Design Of Open Underground ExcavationBy Heman Manchanda, Sandeep Sharma
Several infrastructure projects are in various stages of construction and planning in India and almost all of them involves open ground excavation extending to varying depths. These structures are gen
Sep 1, 2022
-
Remediation Of Rail Structures Impacted By Landslides Using Sleeved Bored PilesBy Paul Hewitt, Aaron Rastall
The New South Wales South Coast rail corridor is key infrastructure for both freight and passenger transport. Geomorphological and geological evidence suggests that land instability has been widesprea
Nov 1, 2022
-
PPP Contract Delivery System- Contractual Risks and Ethical Issues Regarding Deep Foundation SubcontractorsBy Alexander Filotti, Richard Kalson
"1. INTRODUCTION- WHAT IS P3 OR PPP ?The Public Private Partnership (PPP or 3P) is a project delivery scheme based on the government providing land and/or a concession agreement, and on a private enti
Jan 1, 2017
-
Designed, Load-Tested, And Installed Piles For A High-Rise Building In Southwest Florida - A Case History - SynopsisBy Anupam Saxena
This paper presents a case history of design, prediction, probe and production pile driving monitoring, loading test, and installation of piles for a 22-story condominium tower in southwest Florida, U
Jan 1, 1996
-
Alameda Corridor-East: San Gabriel Trench ProjectBy David Peterson, Terry Tucker, Rafael Serrano
"The Alameda Corridor-East (ACE) Construction Authority awarded a $172.6 million contract to Walsh Construction Company (Walsh) for the construction of a 2.2 mi (3.5 km) long grade separation includin
Jan 1, 2017