    Slope Repairs in a Tight Footprint: Slope Stabilization Using Multiple Technologies

    By Dan Mahrt

    "In June of 2009, a slope failure occurred along River Road in Bismarck, North Dakota. The slope failure affected approximately 300 feet of River Road with vertical displacements up to 3 feet, resulti

    Jan 1, 2016

  • DFI
    DFI Collaborates on Risk-Based Panels

    By Derrick Dasenbrock

    Two DFI committees independently organized two complimentary panel sessions for the recent American Society of Civil Engineers' (ASCE) Geo- Risk 2023 "Advances in Theory and Innovation in Practice" Co

    Sep 1, 2023

  • DFI
    Equipment Installation - Recent Developments: General Report On 'Installation Equipments' ? 1 Introduction

    By A. Paviani

    The subject of this session is "Equipment Installa­tion, Recent Developments". This is a subject which is not usually addressed at conferences of Foundation Engineering. It is rare to find sessions

    Jan 1, 1994

  • DFI
    Piling Adjacent To Rail Tunnels At King’S Cross Central

    By David A. Hart, Barry P. Osborn, Richard J. Totty, Ana T. Carvalho, Max B. Elliott

    This paper addresses the experience designing and installing bored piles for the King’s Cross area. This includes continuous flight auger and rotary bored piles, with a range of diameters between 600

    May 1, 2022

  • DFI
    Alternative Design Approach for Drag Load and Downdrag of Deep Foundations within the LRFD Framework

    By Timothy C. Siegel, Derrick Dasenbrock, Rich Lamb, Paul J. Axtell

    "The axial resistance provided by deep foundations may be divided into two components: side resistance and tip resistance. The direction that the side resistance acts depends on the relative movement

    Jan 1, 2015

  • DFI
    The Emerging Technology Of EHDE As Applied To Deep Foundations

    By Jerold Bishop

    The application of the ?electro-hydrodynamic effect? (EHDE) to civil engineering has been made in the construction of drilled piles. Equipment for the commercial application of this process was devel

    Jan 1, 2007

  • DFI
    Contactless Anchor Measurement with Elastomagnetic Sensors

    By Damir Dedic, Wörle. Patrick

    "Soil properties within a construction project area are analyzed during the planning phase. However, it is only possible to achieve selective soil exploration, even in the case of very extensive inves

    Jan 1, 2017

  • DFI
    Newtown Creek Pile Foundation Work 2009

    By Thomas Trochalides

    Newtown Creek Water Pollution Control Plant in Brooklyn, NY is the largest of 14 Water Pollution Control Plants in New York City. It services over 1 million people with a current processing capacity

    Jan 1, 2010

  • DFI
  • DFI
    Field Tests Of Soft Clay Stabilized By Stone Columns In Coastal Areas In China

    By Han Jie

    The results of full scale plate load tests on stone columns on soft clay in coastal areas are presented in this paper. Four load tests were made, two of which were performed on the ground treated with

    Jan 1, 1991

  • DFI
    Augered Cast-In-Place Piles Quality Control

    By Rudolph P. Frizzi

    The current trend of increasing augered cast-in-place (ACIP) pile diameter, length, and load carrying capacities demonstrates improvements in installation equipment, increased acceptance, and that qua

    Jan 1, 2001

  • DFI
    High Strain Testing Of Augered Cast Piles At Miami Fort Power Station

    By C. Michael Morgano

    Static tests are costly and time consuming, so they are not always the best answer [ ]

    Jan 1, 2005

  • DFI
  • DFI
    Deep Soil Mixing Design and Construction for Surface Fault Rupture Mitigation

    By James R. Gingery, Byron Foster, Bret Lingwall

    While microzonation and setbacks are the typical mitigation for structures exposed to surface fault rupture hazards, lifelines and lifeline facilities are not easily relocated to avoid faulting. In th

    Sep 8, 2021

  • DFI
    Design and Delivery of Micropile Installation Leveraging Augmented and Virtual Reality

    By Guilherme L. M. G. Carvalho, Zachary T. Fleming

    In a world of 2-dimensional design documents, envisioning and understanding 3-dimensional interferences for complex foundation construction scenarios can be challenging. Videos and computer models ser

    Jan 1, 2019

  • DFI
    Building Above And Excavating Below An Iconic Building In Manhattan

    By John S. Civetta, Seth Martin, Marc J. Gallagher, Arthur J. Alzamora, Ronald Peralta

    The Crown Building, built circa 1921, is a 26-story iconic building located at West 57th Street and Fifth Avenue in the heart of Manhattan. The paper highlights collaboration between the geotechnical

  • DFI
    Countermeasures Against Soil Liquefaction At Galataport Project In Istanbul, Turkey

    By Carlandrea Albonico, Salvatore Miranda

    The paper describes an innovative geotechnical engineering solution that has been provided within the scope of the Galataport Project, in Istanbul, Turkey. Among all interesting geotechnical works inc

    Nov 1, 2022

  • DFI
    DYNA Force-An Elasto-Magnetic Sensor For Force Measuring Of Post Tensioning Ground Anchors

    By Lucian Bogdan

    On many occasions during construction and service life of the structure, it is crucial to know the load in post tensioning tendons and anchors. Although there are many methods to measure the tendon fo

    Jan 1, 2009

  • DFI
    Use of a Reinforced Jet Grout Excavation Support System for a Major Sewer Line Repair

    By Richard Brink, Eric M. Klein, Kenneth B. Andromalos

    "A portion of the roof for a 129 x 144-inch, nearly 100-year-old sewer outfall in the City of Baltimore had deteriorated to the point that it resulted in the development of a large sinkhole in a resid

    Jan 1, 2005

  • DFI
    Deep Excavation Support – Shangri-La – Toronto

    By Brian Isherwood, Tara Brown, Paul Kreycir, Jenny Earle

    "The Shangri-La hotel and luxury condominium tower, recently opened on University Avenue in downtown Toronto, required eight levels of underground structure, four extending into the shale bedrock.Ishe

    Jan 1, 2015