Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Recovery of Precious Metals and Platinum Group Metals from Mine Ores and Tailings using Plasma Smelting Technology

    By D. E. Deegan, G. Holcroft, T. P. Johnson

    "The rising cost of extracting metals from existing traditional deposits, increasingly stringent environmental regulations and a greater awareness of corporate social responsibility issues are all fac

    Jan 1, 2016

  • CIM
    Large Ring Gears ? A Topic of Concern

    By Robert M. Vadas

    Special considerations are described as they apply to the design of ring gears for high-power grinding mills. AGMA requirements, the importance of the supporting structure, material selection and rela

    Jan 1, 1978

  • CIM
    Study of the Potential Fault Reactivation Induced by Co2 Injection in a Three-Layer Storage Formation

    By J. Bensabat, B. Figueiredo, A. Niemi, J. Rutqvist, C. F. Tsang

    "A hydro-mechanical model was developed to study the interaction between mechanical deformation and fluid flow in the fault zones during CO2 injection and storage at the Heletz site which was chosen a

    Jan 1, 2015

  • CIM
    Environment and science

    By Janet E. Halliwell

    In keeping with the traditions of the Science Council of Canada - an independent and forward looking agency that applies broad and multidisciplinary analyses to the various issues it examines the auth

    Jan 1, 1991

  • CIM
    Towards Formalizing Qualitative Operations Input into Mine Planning

    By T. G. Joseph, E. Lampard

    ABSTRACT: Surface mining operations must manage variability from within their operations as well as variability imposed upon them by external forces. A framework to manage both internal and external v

    Jan 1, 2011

  • CIM
    Slope Stability Radar for Managing Rock Fall Risks in Open Cut Mines (f7671fea-c20b-4d8f-92db-191a4e6e4965)

    By Neal Harries

    Ground movement is normal in open cut mining operations, mainly caused by excavation response and blasting. Movement of the ground can be acceptable provided it is not unexpected and catastrophic. How

    May 1, 2009

  • CIM
    The Total Mining System (TMS): The basis for open pit automation

    By Jonathan Peck, Jim Gray

    "With the implementation of more advanced monitoring, control and locating systems in surface mines, there is an ever increasing need for their mine-wide integration toward achieving over-all optimiza

    Jan 1, 1995

  • CIM
    Pilot plant investigations into roasting and electric furnace smelting at Falconbridge Limited

    By R. P. Mahant

    "Extensive pilot plant investigations were conducted both on partial roasting an d electric furnace smelting from September 1973 to August 1975.The objectives of the pilot plant investigations were:(I

    Jan 1, 1984

  • CIM
    Synthesis and Sintering of Titanium Aluminide (Ti-48Al) Powder

    By Hung-wei Liu, Kevin Plucknett

    Early attempts to manufacture titanium aluminides using blended elemental powders, through powder metallurgical processes, have been obstructed due to serious swelling during sintering. Although the u

    Jan 1, 2015

  • CIM
    Separation processes by single-stage deep fluidized bed continuous ion exchange

    By S. H. Lucas

    "This paper describes the development and application of single-stage fluidized bed continuous ion exchange to the following processes: removal of base metals from mine water; cyanide removal from gol

    Jan 1, 1980

  • CIM
    Implementation of an Advanced Thickener Underflow Density Control at Loulo Gold Mine, Mali

    By D. Sagara, V. G. Makhado

    "A model based control strategy was implemented at Loulo Gold Mine in Mali, to stabilise the thickener underflow stream density. This stream acts as the feed to the leaching circuit. pH control of the

    Jan 1, 2017

  • CIM
    Recent developments in IGCC technology

    By K. M. Tait, M. M. McDonald

    "An overview of the status of the development and application of Integrated Gasification Combined Cycle (IOCC) power generation is presented. Current projects in North America, Europe and Japan are de

    Jan 1, 1994

  • CIM
    Recycling of Nickel, Copper, Cobalt, and Vanadium

    By Clemens Kuhnert

    "Nickelhütte Aue GmbH is specialized in the recycling of waste materials containing non-ferrous metals. We treat nickel, copper, cobalt, vanadium, molybdenum and precious metal containing materials li

    Jan 1, 2017

  • CIM
    Potential problem analyses: A practical risk assessment technique for the mining industry

    By M. P. Davies

    "Risk, the product of probability and consequence, is an integral part of mining. Whether evaluating exploration priorities, determining property acquisition potential, reviewing the components of an

    Jan 1, 1997

  • CIM
    The Lethbridge coal field

    By R. D. Livingstone

    "THE LETHBRIDGE COAL FIELD lies mainly .to the north and west of the city of Lethbridge. Mining carried on in this area for over eighty years until 1965. Before the building of a railway the coal was

    Jan 1, 1985

  • CIM
    Effect of Ore Hardness and its Variance on Sag Mill Circuit Design Tonnage

    By Tony Lipiec, Ian Orford

    "A key part of plant design is the selection of the design tonnage which is the hourly tonnage target that the equipment selection is based on. Its selection is critical for ensuring that the nominal

    Jan 1, 2016

  • CIM
    Keynote Address - Oil and Gas

    By W. L. Single

    "LET ME FIRST OF ALL thank you for sending this invitation to me to participate in this Annual Meeting of The Mining Society of Nova Scotia. As an engineer, although I don't get an opportunity to prac

    Jan 1, 1973

  • CIM
    Mine planning and design integration

    By Earl Gebhardt

    The planning and design of mining panels in the Potash Corporation of Saskatchewan Inc., Lanigan Division mine Block B involved a number of investigative techniques. The techniques utilized to gain in

    Feb 1, 1993

  • CIM
    Diesel-generating plant waste heat recovery systems at remote locations

    By D. Kovachevich, M. A. Pfeifer

    "A t remote locations typical of mines and associated ore processing plants, diesel electric generators are ideally suited for power plants due to their inherent operating flexibility, efficiency and

    Jan 1, 1984

  • CIM
    Vertical Cutter Mining

    ? A BARGE WILL BE INSTALLED IN THE BOTTOM OF A COMPLETED PIT. ? THE PROVEN BAUER CUTTER TECHNOLOGY WILL BE INSTALLED ON THE BARGE AND A DEWATERING PLANT WILL BE INSTALLED NEAR THE BASE OF THE PIT

    May 1, 2003