Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Long Tunnel extended Gold Mine, Walhalla-A Recovery and Rehabilitation Project

    By Griffiths J. B

    From its mining lease at the northern end of Cohens Reef at Walhalla in the North Gippsland Mountains, the Long Tunnel Extended Gold Mining Company produced 13,695 kg of gold, which at 1980 prices

    Jan 1, 1981

  • AUSIMM
    Breccia Formation and It's Relation to Gold Mineralization at Mount Kasi, Fiji

    The Mount Kasi gold deposit in Vanua Levu represents an epithermal, high sulphur, gold-enargite system occurring within a volcanic caldera of Middle to Upper Miocene age. High level breccia pipes

    Jan 1, 1987

  • AUSIMM
    Cobaltite in the Broken Hill Lode (03939c9c-b588-4802-a8a6-05e63bc11f8d)

    The detailed work done by Stillwell and Edwards on the occurrence of cobaltite and safilorite-Iollingite at the South Mine, followed by its presentation as a paper to the Institute, calls for, a few n

    Jan 1, 1944

  • AUSIMM
    The Solution of Ventilation Problems by Mathematical Modelling

    By Wasserman A. D

    Methodological approaches and in- vestigation results are considered in the paper of heatmass transfer processes when harmful impurities are scattered and remo- ved from chamber-like workings, of th

    Jan 1, 1988

  • AUSIMM
    Skarns in the Porphyry Copper-Gold Environment

    By P M. Downes

    Porphyry-related skarns are common around thePacific Rim. Examples include Cadia and Goonumbla (Australia) Ok Tedi (PNG) and Ertsberg and Grasberg (Indonesia). Although usually treated as separate to

    Jan 1, 2008

  • AUSIMM
    In-Situ Leaching of Oxide Gold Deposits

    In-situ leaching of gold deposits has not become an option largely as a result the lack of suitability of cyanide as a lixiviant due to sluggish kinetics and high dependence on the availability of o

    Jan 1, 1991

  • AUSIMM
    Overburden Removal Activities Associated with the Yallourn Open Cut Township Field

    By Fraser C. J

    The township of Yalloum was established in 1921 to provide accommodation for the work force on the sites of the power station and open cut which were to become the basis of Victoria's electricity

    Jan 1, 1992

  • AUSIMM
    A Study Of Grinding Circuit Control Using An On-Stream Particle Size Monitor

    The control of industrial grinding circuits in Australian concentrators has been practised for many years in one form or another. Some have established simple feedback loops in areas such as fine

    Jan 1, 1983

  • AUSIMM
    Flow of Mineral Slurries

    By Tiu C, Sarmiento G, Uhlherr PHT

    Fundamental rheological properties of slowly settling mineral slurries are reviewed. Slurry flow is discussed in terms of observed shear stress-shear rate behaviour. Particular emphasis is placed o

    Jan 1, 1978

  • AUSIMM
    The Valuation of Oil Properties

    Reservoir Engineering has developed into an art. One phase of this art is forecasting the futi. perf ormance of oil and gas reservoirs for property valuations. A discussion of the necessity for oil pr

    Jan 1, 1962

  • AUSIMM
    In-Situ Measurement of Thermal Diffusivity of Rock and Prediction Calculation of Transient Underground Climate

    By Biao Q, Mizuta Y

    Thermal constants such as thermal con- ductivity and thermal diffusivity of rock and coefficient of heat transfer of airway wall are the most important characteristic values which decide accuracy o

    Jan 1, 1988

  • AUSIMM
    Tick Hill Gold Mine - Development and Operation

    The Tick Hill Gold Mine is situated approximately 110 kilometres south of Mount Isa, and 14 kilometres north of the township of The Monument. It was discovered in October 1989 by Mount Isa Mines Explo

    Jan 1, 1993

  • AUSIMM
    Living with Change at South Bulli Colliery

    By Ogilvie M

    South Bulli is the oldest and largest underground coal mine in Australia. Two longwall units are in operation and current production is 2.5 to 3 million tonnes of run of mine product per year with a w

    Jan 1, 1991

  • AUSIMM
    Application of Some Geostatistical Methods to Evaluate Phosphate Deposit (Abu Tartur Area, Egypt)

    By Ibrahim AR

    The experimental phosphate mine of abu Tartur has been recently placed into production. Some problems'have been encountered in maintai- ning grade control due to the differences between early

    Jan 1, 1986

  • AUSIMM
    Alimak Vein Mining

    Martin Mining and Tunnelling Pty Ltd is a mining contractor with offices in Kalgoorlie, WA, Australia and Timmins, Ontario, Canada.Martin Mining and Tunnelling Pty Ltd offers services in mine contract

    Jan 1, 1993

  • AUSIMM
    Convergence and Load Measurements in an Underground Mine in Turkiye

    By Yesil MM, Bozdag T

    This paper describes the conver- gence and load measurements carried out in inclined seams at five longwall faces, two of which were supported by hydraulic props and the other three by conventiona

    Jan 1, 1992

  • AUSIMM
    The Use of Roadheading Machines in the Construction of the Liverpool Link Line

    By Parkes DB

    The excavation of sandstone of generally medium strength for the Liverpool Link Line by Dosco Mark 2A Roadheaders has demonstrated the versatility and good performance of road- headers in suitable

    Jan 1, 1976

  • AUSIMM
    An Alternative to Cube-root Scaling Crater Analysis

    By Fourney W. L, Weaver T. A

    A large number of single borehole crater-forming shots were analyzed in terms of correlating the crater parameters with explosive weight. The objective was to determine a scaling rule for which the

    Jan 1, 1990

  • AUSIMM
    Trends of Longwalling Technology in the German Hardcoal Industry and Application Potentials in the Australian Coal Industry - Possible Contributions by the Mining Suppliers

    Longwalling has reached a high standard both in Germany and Australia and most improvements should be expected in planning, monitoring and control. Double drum shearer have electric drives to 1000 kW

    Jan 1, 1991

  • AUSIMM
    Can Mine to Mill Optimisation Succeed Under Complex Constraints?

    By D Thornton, B Smith, S Demey

    Mine to Mill (MTM) optimisation, a total systems approach to the reduction of energy and cost in mining and mineral processing operations, is well-established technology. However, successful applicati

    Jan 1, 2007