Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    EastLink Tunnel - Permanent Concrete Lining and Waterproofing Design

    By E Taylor, F Lebbing

    The $2.5 billion EastLink project is a 39 km tollway and includes twin three-lane, 1.5 km long, undrained driven tunnels with cross passages every 120 m. The hard rock tunnels are being built to avoid

    Jan 1, 2008

  • AUSIMM
    Optimisation of Cut-Off Grade at Mount Isa Mines Limited Æs Enterprise Mine

    By G MacSporran, I Sheppard

    The practical application of LaneÆs theory on optimum cut-off grade policy has to date proved difficult for selective stoping in large-scale underground mining. The key to determining an optimum cut-o

    Jan 1, 2003

  • AUSIMM
    Reduction of the Blast Exclusion Zone at the Black Star Open Cut Mine

    By J Moncrieff, P Bellairs

    The Black Star Open Cut is located immediately adjacent to the township of Mt Isa and is situated in the middle of extensive pre-existing infrastructure including two concentrators, two smelters, a we

    Jan 1, 2007

  • AUSIMM
    The Mathematical Modelling of Rock Fragmentation by High Pressure Arc Discharges

    The mathematical modelling of rock fragmentation by blasting is one of the most difficult and challenging problems of applied mathematics. Not only is complex mathematics required but there is incom

    Jan 1, 1990

  • AUSIMM
    Treatment and Utilisation of Hilton Mine Water

    By Teague JWS, Jung RF, Kadletz O, Jones DR, Jones CJ

    A study of the passive treatment system for Hilton minewater revealed that it consists of four main process steps. The water, which contains soluble and particulate iron and zinc and is supersaturat

    Jan 1, 1988

  • AUSIMM
    Formcoke

    The major incentives for developing continuous processes for the production of formcoke are to achieve a wider range of coals which can be used, greater operating flexibility enabling the production

    Jan 1, 1975

  • AUSIMM
    The Topmost Gold Deposits in China in the Part of the Northwest Pacific Rim with Emphasis on Gold Prospecting

    Gold mineralization belt of eastern China in the adjacent part of the northwestern Pacific rim is orientated NE to NNE and as-sociated with Mesozoic faults and igneous intrusives and Mesozoic to Cenoz

    Jan 1, 1990

  • AUSIMM
    Reliability Analysis of Semi-Continuous Coal Haulage System

    By Daxian Z, Youdi Z, Shucai Y

    The Huolinhe surface mine is a very large-scale surface coal mine, located in the north-east area of China with a production rate of 1.2 Mtpa. Its coal haulage system has a large capacity, long tran

    Jan 1, 1995

  • AUSIMM
    Assessment of Leachate From Blended Waste Rock Material at the Pasminco Century Mine ù Initial Results From a Two-Year Study

    By M Ridd

    The Pasminco Century Mine (PCML) is located 250 kilometres north-north-west of Mt Isa in Queensland. As one of the worldÆs largest zinc mines, PCML comprises mining and milling operations at Lawn Hill

    Jan 1, 2004

  • AUSIMM
    Coal Sizing Equipment - Expression and Presentation of Result of Performance Tests

    By Partridge AC

    In order to provide a'valid description of the performance of size classifying equipment it is necessary that a standard procedure be established for testing and for the subsequent expression

    Jan 1, 1984

  • AUSIMM
    Selection, Commissioning, and Operation of The Friction Winder at Cobar Mines

    The specification for tender nominated the requirements for ore hoisting and servicing; this showed that one common duty winder could be selected. Foliowing the design of the shaft layout, the merits

    Jan 1, 1969

  • AUSIMM
    Merrill-Crowe/Carbon-in-Pulp an Economic Evaluation

    By King ND

    This paper presents an economic study comparing two gold recovery processes, zinc precipitation (Merrill-Crowe) and carbon-in-pulp (CIP). Capital, operating, and gold losses costs from an actual CIP

    Jan 1, 1982

  • AUSIMM
    Computer Modelling in the Solution of Continuous Miner Heading Ventilation Problems

    By Meyer C. F

    The increasing use of continuous miners in the extraction of high coal seams has amplified the need for enhanced ventilation systems in the headings. Owing to larger face dimensions and higher produ

    Jan 1, 1995

  • AUSIMM
    Optimisation of the Milling Design of the Chessy Project Near Lyon, France

    By Gallet M, Watsford R. M S

    The 1989 feasibility study of the chessy, france, copper, zinc, pyrite and barite orebody was based upon a classical flowsheet. The flowsheet included, three stages of crushing, conventional rod and

    Jan 1, 1991

  • AUSIMM
    Some Problems in Deep Open Cut Mining and their Solution by Goldsworthy Mining Limited

    The iron ore mining operations carried out by Goldsworthy Mining Limited at Golds- worthy, Shay Gap and Sunrise Hill, in the Pilbara region of the North-West of Western Australia, are unusual insofa

    Jan 1, 1979

  • AUSIMM
    The Political Dimension in Resource Development

    I must tell you at the outset that I come to this conference deeply disturbed at the `role of Government in international dealings in mineral and energy resources'. I am disturbed by the confu

    Jan 1, 1978

  • AUSIMM
    Evaluation of the Callide Coalfield

    By Roach C

    Exploration on the Callide Coalfield by Thiess Bros. Pty. Limited had reached the stage in mid 1976 where there was a need for a comprehensive appraisal of the coalfield geology. Exploration strat

    Jan 1, 1978

  • AUSIMM
    Mine Dewatering at Mount Lyell, the 1980Æs and Beyond

    Mining operations have been carried out at Mt. Lyell for the past century. Until the 1970's the location of the mines in relation to the surface topography has enabled the mines to drain their

    Jan 1, 1982

  • AUSIMM
    Floatation of Ok Tedi Pyrite

    Pyrite is a significant gangue sulphide mineral in the Ok Tedi copper ore. Its presence in the flotation concentrate is not entirely desirable since it lowers the grade of the final copper concentra

    Jan 1, 1997

  • AUSIMM
    Integrated Approach to Assessing Mine-Related Impacts on the Sustainable Management of Water Resources ù Case Study: Three Mile Creek, Collinsville (Northern Bowen Basin, Queensland)

    By D L. Richardson, B Tiedt, C D. Morgan

    Following residentsÆ concerns that the ongoing operations of Collinsville Coal (CCP) mine may be resulting in the release of contaminants, including products of acid mine drainage (AMD), into downstre

    Jan 1, 2003