Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Development of an Integrated Platform for the Analysis, Modelling and Design in Panel Caving Mines

    By G Pizarro, O Miranda, D Rosales

    In panel/block caving mines, large amounts of information are collected at the operations. This information includes grades and extracted tonnage, fragmentation, lithology, design of stopes and main i

    May 9, 2016

  • AUSIMM
    Physical and Mechanical Characterisation of Paste Backfill by Laboratory and In-Situ Testing (6467738c-7044-43a0-9a73-ca12bdc18202)

    By Bidwell TJ, Servant S

    Paste back-fill technology is gaining rapid acceptance in the Canadian mining industry. The authors were able to work on four different mining sites employing paste technology in their operation. In

    Jan 1, 1998

  • AUSIMM
    Mechanical Properties of Cementitious Grout Serving in Fully Grouted Cable Bolting Systems

    By P C. Hagan, J Chen, S Saydam

    Fully grouted cable bolts have been used in underground mining industry for more than 40 years and are becoming more and more popular especially when severe geological conditions are encountered, such

    Nov 5, 2014

  • AUSIMM
    Real-Time Online Analysis of Iron Ore, Validation of Material Stockpiles and Roll Out for Overall Elemental Balance as Observed in the Khumani Iron Ore Mine, South Africa

    By D Matthews

    With the increasing demand for quality-specific ores, coupled to the reality of even more complex minable iron ore reserves, there is a growing need for real-time online material analysis of plant fee

    Jul 11, 2011

  • AUSIMM
    Experimental study and thermodynamic modelling of phase equilibria in the FeO-FeO1.5-SbO1.5-SiO2 system in equilibrium with metal

    By C Zschiesche, alam, A Abadias Llamas, A K

    An integrated experimental and thermodynamic modelling study of the phase equilibria in the FeOFeO1.5- SbO1.5-SiO2 system in equilibrium with liquid Sb and Sb-Ag metal has been undertaken to develop t

    Jun 17, 2024

  • AUSIMM
    Sulfidisation-Acidification-Recycling-Thickening (SART) for Complex Gold Ores

    By A Hall, D Kratochvil, P Littlejohn

    Economic recovery of gold from complex gold ores, including poly-metallic deposits, is impacted by the presence of cyanide-soluble base metals. These base metals can create both a metallurgical challe

    Sep 26, 2013

  • AUSIMM
    Exploration and Geology of the Goodall Gold Mine

    By D R Quick

    The Goodall gold mine is located 30 km east of Adelaide River, within the Pine Creek 1:250 000 map sheet, at 8 525 000 mN: 750 000 mE, on the AMG grid. The first gold was poured in April 1988 and th

    Jan 1, 1994

  • AUSIMM
    I Think, Therefore I Add Value – Philosophy of Science as a Practical Tool for the Mine Geologist

    By J Vann

    The philosophical context of many activities in mine geology can be an important lever in adding value to operations. For mine geologists (including resource and grade control geologists) we argue tha

    Aug 22, 2011

  • AUSIMM
    Fine-Tuning Raise Bore Stability Assessments and Risk

    By W A. Peck

    Raise boring is the preferred option for constructing ventilation shafts in Australia. The trend has been towards larger diameters and longer single-pass shafts, and if at all possible, reaming throug

    Mar 21, 2011

  • AUSIMM
    Introduction of the Robbins Mobile Miner to Mount Isa Mines Limited

    By Neill T. J, Howarth D. F, Malcolm J. McPhersqn

    For many years Isa Mine has seen the need for a continuous mining machine which will economically cut hard rock. Tunnel borers are unsuitable due to the size and inflexibility of the machine and t

    Jan 1, 1986

  • AUSIMM
    A Comparative Study of Rock, Soil and Plant Chemistry in Relation to Nickel Mineralization in the Pioneer Area, Wester Australia

    By Smith F. A, Both R. A

    The application of biogeochemical methods in mineral exploration in the semi-arid to and environment of Western Australia was investiga- ted in an area near Norseman. The reliability of these method

    Jan 1, 1973

  • AUSIMM
    Design, Inspection and Rehabilitation of the New Croton Aqueduct, New York City

    By A Fareth

    Constructed between 1885 and 1891, the New Croton Aqueduct (NCA) in New York State is a 50 km long (31 mi) brick-lined tunnel conveying water from the Croton watershed north of New York City to distri

    Jan 1, 2008

  • AUSIMM
    Modification of Some Failure Criteria for Rock and Coal

    By V S. Vutukuri, K Shariar

    This paper present a modification of selected strength criteria for coal and rocks containing weakness planes. The three strength criteria, namely, Murrell (1965), Bieniawski (1974a, 1983) and Hoek a

    Jan 1, 1999

  • AUSIMM
    Genesis of the Large-sized Fozichong Lead-zinc Polymetallic Deposit, Guangxi, South China – Constraints from the Sulfide Mineralogy, Fluid Inclusions and Isotope Geochemistry

    By H Q. Zhang, M C Chai, W Fu, H Y Chen, L M. Wei, Q J. Yang

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Fozichong deposit – located in the south-western segment of the giant Qinhang metalloge

    Mar 18, 2015

  • AUSIMM
    The Role of the Commonwealth Government in Relation to the Mining Industry

    The Australian Constitution specifies certain powers of the Commonwealth Government to be used in its capacity as the national government. Certain of these broad powers result in the Com- monwealth

    Jan 1, 1978

  • AUSIMM
    Blasting Approaches to Increase Mine Productivity and Reduce Greenhouse Gas Emissions in Surface Coal Mining

    By T Goswami, G Brent

    In response to concerns over greenhouse gas (GHG) emissions and an imposed cost in some jurisdictions, many mining houses have committed to reductions in their GHG emissions. However, mining faces par

    Aug 24, 2015

  • AUSIMM
    Improving industrial copper processing operations through the application of thermodynamic fundamentals and advanced predictive tools

    By G R. F Alvear Flores

    Mineral resources are becoming more complex in composition and structure making it more difficult to produce clean concentrates for primary metal smelting. In parallel, providing technological solutio

    Jun 17, 2024

  • AUSIMM
    Rough Diamonds Treatment Technique Aiming at Ensuring Preservation of Original Grains: Process Design and Inculcation into Industry

    By Denisov GA

    Conventional processes for disintegration of ores are characterised by low selectivity and cause damage to the components of their structure. It affects their liberation and recovery which are conne

    Jan 1, 1993

  • AUSIMM
    Potential for Revegetating Base-Metal Tailings at the Tui Mine Site, Te Aroha, New Zeland

    By Gregg PEH, Horne D, Bolan N, Stewart RB

    The Tui mine site is situated on the NW flank of Mt. Te Aroha, at approximately 400 m altitude. During underground mining operations two lead-copper-zinc ore bodies were exploited and processed on si

    Jan 1, 1995

  • AUSIMM
    Characterisation of Gold Ores by X-Ray Computed Tomography – Part 1: Software for Calibration and Quantification of Mineralogical Phases

    By L E. Howard

    Micro-computed tomography (Micro-CT) is an X-ray imaging technique that produces high-resolution 3D computerised ‘virtual’ models of geological specimens based on the X-ray attenuation of different ma

    Sep 5, 2011