Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Health, Safety and Sustainability

    By D Cliff, K Bailey

    Traditionally occupational health and safety (OH&S) has been managed for the direct benefits of reducing injury and illness to workers on mine sites. In the current skill shortage climate it is im

    Nov 20, 2012

  • AUSIMM
    Productivity Enhancement Driver Assistance for Mining Machinery Based on Unique Two-Dimensional Radar Sensor Fusion Concept

    By C Augustin, M Hahn, K Nienhaus

    Operators of mining machinery like haul trucks or excavators have very limited information about the exact distance to other equipment as well as to the natural boundaries like berms, walls and struct

    Sep 26, 2011

  • AUSIMM
    A Bounding Surface Model for Sand Subjected to Blast-induced Vibrations

    By L M. Zhang, T H. Xu, J Zhao

    Blasting is one of the most commonly used strategies for excavation in civil and mining engineering. Yet blasting can also bring along such undesirable effects as ground vibrations and soil disturbanc

    Nov 5, 2014

  • AUSIMM
    Quantitative Clay Mineralogy for a Calcrete-Hosted Uranium Deposit – Innovative Application of Existing Technology on an Unprecedented Scale

    By C Lower

    An unprecedented, quantitative, deposit-scale understanding of major clay mineral distribution throughout the Yeelirrie uranium deposit has been achieved by adapting the existing HyLogger™/HyChips™ an

    Sep 5, 2011

  • AUSIMM
    Above and beyond NPV – determining the life-of-mine from an economic perspective

    By C Tapia, B Hay

    There is a close relationship between the mining industry, economic growth, and technological and social development. Mining activities benefit all economic agents, but only during a timespan determin

    Aug 2, 2023

  • AUSIMM
    (U-Th)/He Geochronology of Channel Iron Deposits, Robe River, Hamersley Province, Australia – Implications for Ore Genesis

    By M Danišík

    Two drill core samples of haematite/goethite from the Robe River (Western Australia) channel iron ore deposits (CID) were dated using (U-Th)/He methods in order to constrain the timing of iron oxide f

    Jul 11, 2011

  • AUSIMM
    Steel Immersed Tube Tunnels where Tunnel Boring Machines Cannot Operate – Yarra River Crossing Construction on the Melbourne Main Sewer Replacement Project

    By M Behrens

    The Melbourne Main Sewer Replacement (MMSR) is a major urban infrastructure project involving approximately 2.3 km of tunnelling and construction works. The works extend from Docklands Precinct, on th

    Mar 8, 2011

  • AUSIMM
    The Geology and Gold Mineralisation of the Batman Deposit, Mt Todd Project, NT

    By Hein K. A A

    The Mt Todd Gold Project is located 42 km northwest of the township of Katherine within the Northern Territory of Australia. It is situated in the southeastern portion of the Pine Creek Geosyncline.

    Jan 1, 1994

  • AUSIMM
    Open Stoping with Associated Caving at Mount Lyell

    Underground mining of the ore below the West Lyell open cut commenced in 1972 with the 10 Series stopes above rail haulage level. The third lift of stoping (30 Series) com- menced this year, and acce

    Jan 1, 1982

  • AUSIMM
    In Situ Remediation of Heavy Metal Contaminated Soil or Rock Formations by Directed and Controlled Crystallisation of Natural Occurring Minerals

    Based on the idea to copy crystallisation and precipitation phenomena occurring in nature, a new technology was developed allowing the preparation of metastable, mineral forming solutions. If these so

    Jan 1, 2003

  • AUSIMM
    The Use of a Colour Parameter in a Machine Vision System, SmartFroth, to Evaluate Copper Flotation Performance at Rio TintoÆs Kennecott Utah Copper Concentrator

    By G Forbes, D J. Bradshaw, G S. Heinrich, D

    Traditionally, operators on mineral flotation plants have relied on visual inspection of the froth surface when making adjustments to process set-points. Machine vision systems are being developed to

    Jan 1, 2005

  • AUSIMM
    Ferroalloy extraction from a Zimbabwean chrome ore using a closed DC furnace

    By S Bright, M J. Masamvu, E K. Chiwandika, S Dandi, S M. Masuka

    The depletion of high-grade hard and lumpy chrome ores has forced Zimbabwean ferrochrome producers to resort to low-grade friable ores that have an average of 28 per cent fines against a set limit of

    Jun 19, 2024

  • AUSIMM
    Chirano Gold Mine Expansion – A Case Study

    By S Ellis

    In January 2008 Chirano Gold Mines Limited committed to expansion of the Chirano Gold Project from its existing design capacity of 2 Mtpa ROM ore to a new design value of 3.5 Mtpa. In addition to incr

    Aug 8, 2011

  • AUSIMM
    Recent Developments in the Solvent Extraction of Metals

    By Lott JB, Scuffham JB

    Until very recently the application of solvent extraction to. the recovery of metals has been considered only for ithose operations where no other process was available. In general, .these operations

    Jan 1, 1970

  • AUSIMM
    Application of a reinforcement learning AI solution for optimisation of screening shuttles control

    By A Horeth, E Duggan, B Versiani, A Gooch

    Iron ore screening plant productivity is strongly affected by the performance of the shuttle operation, with the control system robustness and associated strategies having a direct impact on utilisati

    Nov 8, 2021

  • AUSIMM
    A Managed Approach to Project Insurance

    Historically the insurance industryÆs involvement in any project has been relatively late in the process. Often it was a case of the last item to be ticked off the checklist has been to ensure that th

    Jan 1, 2007

  • AUSIMM
    Ion Exchange in Hydrometallurgy - Secondary Metal Removal or Primary Production Technique?

    By J D. Illescas, S N. Arnold, D R. Shaw

    Ion exchange (IX) as a primary production technique has been applied commercially since the 1950s; its application in the uranium industry continues to be widespread and is utilised to a lesser degree

    Oct 29, 2012

  • AUSIMM
    Initial Operation of the Hismelt Research and Development Facility

    By Winrove G. S, Herdie G. J, McCarthy C. A

    Production of hot metal from the Hlsmelt Research and Development Facility at Kwinana, Western Australia commenced in October 1993. The stand-alone facility is a unique, coal-based, integrated ironw

    Jan 1, 1995

  • AUSIMM
    Testing of Soil Covers for Waste Rock in the Ronneburg WISMUT Mine Closure

    By S Jahn, M Noel, E M. Rykaart, M Pau

    Three soil cover test areas were constructed on waste rock backfilled into the Lichtenberg Pit, near Ronneburg Germany. A fourth, uncovered area was included as a control. Each test area measures 50 m

    Jan 1, 2003

  • AUSIMM
    Everyone Has a Plan Until They Get Punched in the Mouth – Creating Trust, Commitment and Results in Tough Times

    By P Moynagh

    "A plan is critical but on its own it is a bit one dimensional, the three dimensions critical to success over the long-term, through changing economic, geological and management conditions are:the qua

    Nov 15, 2016