Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Operational readiness – what is it and how to get it done?

    By A G. L Pratt

    Operational readiness is a commonly used term in mining and many other industry settings. However, translating this term into a coherent scope of work that is practical and meaningful is a challenge f

    Mar 29, 2023

  • AUSIMM
    Preparation of a JORC Code Compliant Resource Statement Based on an Evaluation of Historical Data – A Case Study from the Panguna Deposit, Bougainville, Papua New Guinea

    By P Collier

    From 1972 until 1989 when operations were suspended Bougainville Copper Limited (BCL, owned 53.58 per cent by Rio Tinto Limited) operated a large open pit mine and processing facility at Panguna on Bo

    Aug 22, 2011

  • AUSIMM
    Ernest Henry Underground Mine – Access and Support Infrastructure Design

    By P Christen

    The Ernest Henry Copper gold mine situated in North West Queensland, Australia, is owned and operated by Xstrata Copper. Currently the open pit produces 11 Mtpa of ore. With open pit mining ceasing in

    Mar 21, 2011

  • AUSIMM
    Extending Information from Coal Bore Cores

    A description is given of a detailed examination of a coal bore core and of attempts to predict properties of equivalent "as-mined" coal using the bore core data so obtained. The accuracy of the pr

    Jan 1, 1972

  • AUSIMM
    Optimisation of an Image Analytical System for Bulk Materials Using the Theory of Sampling

    By K H. Esbensen

    Optimisation of a real-time at-line monitoring system for control of industrial granule coating quality is presented. The system is based on a fluorescence imaging system, because fluorescence origina

    Jan 1, 2005

  • AUSIMM
    Sampling the Settler of the Kalgoorlie Nickel Smelter

    By Reed M. E, Cloutt B

    Particulate samples were taken from the gas space in the settler of the Kalgoorlie nickel smelter using a vertical sampling probe and a specially designed isokinetic sampling probe which also quench

    Jan 1, 1991

  • AUSIMM
    The True Values and Uses of Coal Seam Gas Water

    Arrow Energy NL has been operating a number of coal seam gas wells in the Darling Downs region of Queensland. At the time of writing this paper, the region is enduring an extended drought period. The

    Jan 1, 2006

  • AUSIMM
    Improvement in Iron Ore Agglomeration Through Design Modification in Coke Crushing Plants

    By B K. Da, S A. Balaji, G P. Roy, T K. Dutta

    The raw material handling complex at the Durgapur steel plant provides iron ore, crushed coke and flux to two sinter plants. Either some facilities were not envisaged or not properly designed before t

    Jan 1, 2005

  • AUSIMM
    Thermal Modelling and Mitigation Measures for the Bogong Power Development

    By D Wimpenny

    The Bogong Power Development Project in Victoria, Australia involved the construction of a 15 m long mass concrete plug up to 9 m in diameter within the head race tunnel. The plug is critical to thepe

    Mar 8, 2011

  • AUSIMM
    Full PSD rejects shear strength testing for co‐disposal and assisted tailings dewatering technique selection

    By G Burton, S Fityus, J Li, S Vaughan, D Payne

    Daunia and Caval Ridge coal mines, owned and operated by BHP, have been co-disposing rejects and dewatered tailings within spoil dumps from the beginning of their operations in 2013 and 2014, with the

    Jul 1, 2021

  • AUSIMM
    The Economic Advantages of Detailed Geotechnical Assessments for Extraction Sequencing

    By A Bennett, S Arndt

    Minerals and Metals Group Pty Ltd (Golden Grove Mine) commissioned a comprehensive study of the life of mine using advanced 3D stress modelling. Essential input into the modelling was the proposed min

    Mar 24, 2014

  • AUSIMM
    Who does the Marketing in the Race for Space?

    This paper has been developed for æThe Race for SpaceÆ conference. It ranges over various aspects, all of which are within the umbrella of marketing. The question is posed because many engineers, tunn

    Jan 1, 1999

  • AUSIMM
    Physical and Chemical Evolution of Placer Gold Deposits During Rise of Antiformal Ranges, Central Otago, New Zealand.

    By Craw D

    Quaternary warping and uplift of antiformal schist ranges in Central Otago, New Zealand, has resulted in recycling of alluvial gold from widespread, generally weakly auriferous, Miocene fluvial grave

    Jan 1, 1995

  • AUSIMM
    Longwall Mining beneath Critical Infrastructure – Prediction versus Performance of the Cataract Tunnel, New South Wales, Australia

    By T J. Sullivan, H Pinkster, G Swarbrick

    From 2002 to 2006, longwall mining was undertaken directly beneath the Cataract Tunnel, which is a 100-year-old, heritage-listed tunnel in Hawkesbury Sandstone responsible for delivering 20 per cent o

    Nov 5, 2014

  • AUSIMM
    Improving Energy Efficiency Across Mineral Processing and Smelting Operations - A New Approach

    By B L. Coulter, E Wightman, A S. Burrows

    With their commitment to sustainable development in an increasingly carbon-constrained world, many resources companies are focused on reducing the energy required to create their final products. In pa

    Jan 1, 2009

  • AUSIMM
    Economic Influeces on a Base Metals Project

    By Cooper P. G

    I he Electrolytic Refining and Smelting Company (ER&S) has oper- ated a copper smelter at Port Kembla, NSW since 1908. The feasibility of modernising the smelter was recently studied and external inf

    Jan 1, 1988

  • AUSIMM
    Driving Haulage Productivity Improvements through Industry–Academia Collaboration

    By R Thompson, J Miedecke, D Handel, E Tomicek, D Tulloch

    "The Mine Haul Road Optimisation Alliance (HROA) is a unique Australian industry–academia collaboration that has been developed to support mine haul road operators. The alliance integrates industry, e

    Nov 15, 2016

  • AUSIMM
    Extensions to MelbourneÆs Telecom Cable Tunnel Network

    By Gunn S. G, Wilson E. G

    Studies by Telecom showed that the existing cable tunnel system in the Melbourne C.B.D. required expansion in order to meet the future telecommunications needs of the City. Due to physical locations

    Jan 1, 1981

  • AUSIMM
    Effect of horizontal stress on shallow coalmine slopes

    By I Canbulat, A Mcquillan

    This paper presents a parametric analysis showing the impact of virgin in situ stresses on a shallow (less than 100 to 150 m) high slope in a jointed sedimentary rock environment. Slope stability is a

    Nov 29, 2022

  • AUSIMM
    Adding Copper Recovery and Acid Consumption Variables to the Geological Model of Quebrada Blanca

    By R Schiller, E Chait

    "Quebrada Blanca is a porphyry copper deposit located in the Eocene-Oligocene belt of Chilean Andes. Operation started in 1994 and original reserves for supergene mineralisation gave a life-of-mine (L

    Jun 15, 2016