Search Documents

  • NIOSH
    IC 6030 Rock Dusting in Coal Mines

    By D. Harrington, G. S. Rice, R. R. Sayers

    "The Bureau of Mines in Serial No. 2606,4 issued in May, 1924, gave tentative specifications for rock-dusting to prevent coal-dust explosions in mines. Subsequently, a sectional committee of the Ameri

    Mar 1, 1927

  • SME-ICGCM
    The Effects of Reduced Annulus in Roof Bolting Performance

    By Stephen Tadolini

    The annulus thickness, for bolts anchored with resin, effects the systems final performance. Recent developments in the manufacturing process of these support systems, coupled with improved resin char

    Jan 1, 1998

  • CIM
    Valuation of mineral properties without mineral resources: A review of market based approaches

    By R. D. Lawrence

    "Comparable transaction analysis is the best known of the market approaches to valuation of exploration-stage mineral properties. The analysis of option and farm-in agreements can also provide useful

    Jan 1, 2002

  • AUSIMM
    The Computerised Evaluation of Mining Data at Macraes

    A Sun SPARCstation based computer network is utilised to store and process mining data at the Macraes Gold Mine. Techbase and Medsystem software running on the SunOS unix platform is used to generate

    Jan 1, 1992

  • SME
    Seismic Design Of Underground Structures

    By A. J. Hendron, J. E. Monsees

    INTRODUCTION This paper is the outgrowth of work done by the authors to prepare the seismic design criteria for underground structures on the Southern California Rapid Transit District (SCRTD) Metr

    Jan 1, 1985

  • DFI
    Designed, Dynamically Load Tested And Installed Pile Foundation In Southwest Florida - A Case History

    By Christopher J. Pacitto

    This paper presents a case history of an engineered, monitored, and tested program that provided an effective and satisfactory basis for the completion of pile foundations for Twin Dolphins 1 at La Pe

    Jan 1, 2002

  • SAIMM
    Calculation Of FeO-TiO2-Ti2O3 Liquidus Isotherms Pertaining To High Titania Slags

    By D. J. Fourie

    During the production of pure TiO2for the pigment industry, ilmenite, containing 35?60% TiO2, is reduced to high titania slag, containing 70?95% ?TiO2? and pig iron. The high titania slag produced, co

    Jan 1, 2005

  • SME
    Southfield Sewer Investigation, Replacement and Repair: A Case History

    By Harry R. Price, Bharat Doshi, Awni Qaqish, Abdul-Ghani Mekkaoui, Thaddeus Znoy, Ramesh Shukla

    In 1992, a detailed inspection of the Southfield Sewer revealed a reach of approximately 0.8 kilometers in length, located directly below the freeway lanes, which was severely distressed. Failure of t

    Jan 1, 2001

  • AUSIMM
    Defining a Sampling Strategy for a Continuous Flow Supported by Geostatistical Simulations

    By D M. Marques, J F. C L Costa

    The estimation of process plant head grade is not trivial and is a source of constant dispute within the mining industry. Grade estimates informed by the short term mine planning are frequently not re

    Aug 21, 2012

  • CIM
    Thompson 1-D Deposit Geology and Structure

    By Rob Stewart

    Acknowledgements ? Josef Macek(Manitoba Geological Services) ? Sally Goodman (SRK) ? Inco Geologists ? Rogerio Montiero ? Thompson Mine Geologists Introduction ? Regional Geology ? Thompson G

    May 1, 2006

  • IOM3
    Contrasting structural controls on gold mineralization along the Eldorado shear zone, Zimbabwe

    By P. E. J. Pitfield, S. D. G. Campbell

    The regional shear zone runs along or near the southern margin of the Chinhoyi greenstone belt. It hosts four of the seven mines in the southern part of the belt with recorded production above 100 kg

    Apr 1, 1996

  • CIM
    Block/panel caving pressing final open pit limit

    By S. Fuentes, J. Cáceres

    "During the past fifteen years, mines utilizing the block caving method have improved performance and systematically reduced total mining costs.This paper describes improvements in mine design, mine p

    Jan 1, 2004

  • CIM
    Discrete Event Control and Dynamic Scheduling for Tele-Robotic Mining

    By Jamie King

    This paper describes the use of dynamic scheduling and discrete event control to provide coordinated control of multiple automated vehicles. In the past decade there have been significant advances in

    May 1, 2001

  • SAIMM
    Feasibility Study On Triboelectrostatic Concentration Of <105 µm Phosphate Ore ? Synopsis

    By S. O. Bada

    Fine phosphate feed is considered to be slime and normally disposed of as a discard in settling ponds or dumped as landfill. The purpose of this research was to establish whether commercially acceptab

    Jan 1, 2012

  • NIOSH
    Bulletin 196 Coal-Mine Fatalities in the United States, 1919

    By Albert H. Fay

    Through the hearty cooperation of the State coal-mine inspectors, the bureau is able to present in this paper a a complete statement of the coal-mine fatalities occurring throughout the United States

    Jan 1, 1920

  • TMS
    Research Methods Of Iron Ore Sinters: Improvement In Their Quality Assessment

    By Marilia S. de Magalhaes

    Keywords: sinter, characterization, agglomeration, iron ore Iron ore sinters are the main burden of blast furnaces for pig iron production. The evaluation of these agglomerates is very important d

    Jan 1, 2005

  • AIME
    Reservoir Engineering - General - Effect of Composition and Temperature on Phase Behavior and Dep...

    By T. K. Perkins, L. R. Kern, R. E. Wyant

    Many factors influence the results of hydraulic fracturing to stimulate well productivity. Most of these factors have been studied and their effects discussed in the literature. However, the movement

  • SME
    Ecosystem Restoration Within The Anchor Hill Pit Lake, Gilt Edge Mine Superfund Site, South Dakota

    By J. Jonas, J. M. Harrington, K. Wangerud, S. D. Fundingsland, J. G. Harrington

    EPA NRMRL Mine Waste Technology Program and Region VIII Superfund office are jointly conducting an in-situ technology demonstration at the Anchor Hill Pit Lake, Gilt Edge Mine Superfund site. The goal

    Jan 1, 2004

  • SME
    Crisis Management: What To Do If Disaster Strikes

    By Joseph J. Zaluski, J. Steven Gardner, Marco M. Rajkovich

    The telephone rings at 3:20 a.m. An exasperated voice on the other end says, “There has been a mine explosion at Mine No. 5 and we have not heard from three units of men.” Twenty-three minutes later

    Jan 1, 2004

  • SME
    Performance Of The Lorraine Mine Site Cover To Limit Oxygen Migration

    By Bruno Bussière, Michel Aubertin, Anne-Marie Dagenais, Johanne Cyr

    A five steps remediation program was commissioned in 1998 for the acid generating Lorraine mine site, located in the Témiscamingue region, Quebec, Canada. It included, as the main expenditure, a cover

    Jan 1, 2005