Search Documents

  • SAIMM
    Metallurgical Accounting In The Northparkes Concentrator - A Case Study (00982089-f990-4df9-a84d-f2282567e0f0)

    By W. M. Jansen

    In many mineral processing operations, the reported production figures for an accounting period may not make the best use of available data. While most of the mathematical approaches, such as check-in

    Jan 1, 2007

  • AUSIMM
    Paper No. 180. The Calculation of The Comparative Efficiencies of Crushing And Grinding Machines.

    WHEN making comparisons of the efficiencies of different grinding and crushing machines it is desirable to be able to estimate the work actually done in crushing the ore from a given size of feed to a

    Jan 1, 1909

  • SME
    Real-Time Monitoring Of Cable Shovel Stress For Improved Machine Health

    By S. Frimpong

    Cable shovel requires continuous monitoring through excavation to achieve reliability, longevity and economic usage. The operating environment and the stress and deformation fields on the front-end as

    Jan 1, 2006

  • NIOSH
    Ergonomic And Existing Seat Designs Compared On Underground Mine Haulage Vehicles

    By Chris Jobes, Alan Mayton, N. Kumar Kittusamy, Dean Ambrose

    NIOSH researchers conducted a study to compare seat designs on underground coal mine haulage vehicles. The objective of the study was to support prior findings that NIOSH-designed seats, which incorpo

  • DFI
    Inaccurate Interpretation Of Offshore Geotechnical Site Investigation Results And Risk Associated - A Case Study Of Conductors Collapse In Driving

    By Hodjat] [Shiri

    A 4-legged jacket structure was installed by an Offshore Installation Contractor (OIC) in the Persian Gulf. In addition to four open-end pipe piles, six conductors were installed by OIC. During the in

    Jan 1, 2006

  • SME
    Manufacturers Should Strive for Quality, Cost Effectiveness to Boost Productivity

    By A. Fred Gelding

    Introduction In preparing this paper considerable time was spent attempting to find some upbeat data about the mining industry, so those of us in the field could feel somewhat better about future pro

    Jan 11, 1983

  • AIME
  • DFI
    Vibration Environmental Effect Of Construction Operations - Synopsis

    By Mark R. Svinkin

    Construction vibrations may be harmful to adjacent and remote structures, sensitive instruments and people. Construction vibration sources have a wide range of energy, displacement, velocity and accel

    Jan 1, 2000

  • SME
    Mechanical Mining: Challenges and Directions

    By Richard E. Gertsch

    Mechanical mining holds great promise for the mining industry. Realizing this promise depends on developing the tools needed to mechanize a mining operation with a reasonable expectation of success.

    Jan 1, 1994

  • AUSIMM
    Some Experiments on Water Jet Cutting and Consideration of Its Use as a Drilling Tool in Rocks

    An account is given of experimental apparatus for generating a short duration high velocity water jet and the effect of its impingement on various rock samples under air or water cover. The penetratio

    Jan 1, 1969

  • NIOSH
    RI 8782 Physical Property Data on Coarse Anthracite Waste

    By Bill M. Stewart

    Since 1974, a large amount of data has been developed concerning the physical properties and stability characteristics of waste generated by the mining and preparation of bituminous coal. However, ver

    Jan 1, 1983

  • ISEE
    Blast Site Security - International Society of Explosive Engineers 29th Annual Conference Safety Workshop February 5, 2003 Nashville, Tennessee

    By Unknown

    Blast Site Security Involves: * Clearing the area * Controlling Access * Warning Signals

    Jan 1, 2003

  • DFI
    Settlement Of Tall Buildings Supported On Deep Foundations In Southeast Florida, USA

    By Rudolph P. Frizzi

    This paper presents different deep foundation systems and associated settlement records for high-rise building projects in the coastal areas of southeastern Florida. An introduction to the sedimentary

    Jan 1, 2003

  • ISEE
    New Photo-Optic System for Adaptation to Measure VOD

    By William H. Snyer

    A relatively inexpensive, very fast response photo-optic/fiberoptic system has been conceived, constructed and employed by Denver Research Institute (DRI) to measure charge breakout uniformity on the

    Jan 1, 1990

  • CIM
    Perspectives on the scientific and engineering principles underlying flow of mineral pastes

    By Michael Li, Arie Moerman

    "Paste backfill as a means of supporting underground mining is gaining popularity. Despite this trend, engineering and design of mine paste backfill systems are still largely based on empirical method

    Jan 1, 2002

  • SME-ICGCM
    Classification Of Large Seismic Events At The Lucky Friday Mine

    By J. K. Whyatt

    The paper presents an approach to design a multi level room and pillar layout in a 40m thick seam overlain by a major aquifer. The design was required to maximise extraction with due consideration of

    Jan 1, 1996

  • AUSIMM
    Treatment of Sulfide Tailings from Base Metal and Gold Operations - A Source of Saleable By-Products and Sustainable Waste Management

    By D A. McCallum

    With depth, many gold ores become sulfidic with minerals such as pyrite, pyrrhotite and arsenopyrite becoming prevalent. In addition, many underground gold mines use tailings backfill to bind and stor

    Jan 1, 2007

  • SME
    MinExpo 2008: The Biggest Ever

    From the massive equipment that moves the earth, to the parts that keep the equipment moving, it was all on display for more than 35,000 people who at-tended MinExpo 2008 at the Las Vegas Convention C

    Jan 1, 2008

  • DFI
    Estimation Of Settlements Of Piles In Group

    By Kazimierz Gwizdala

    In the paper the method for estimation of settlement of vertically loaded piles in a group is presented. The method is generally based on the hybrid procedure with non-linear solution for single piles

    Jan 1, 2002

  • AUSIMM
    The Control of Fines through Improved Blast Design

    Fines and unnecessarily small rock fragments are created by as many as four identifiable breakage mechanisms which operate close to the charged section or sections of the blasthole. The peak blasthole

    Jan 1, 1979