Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
A Proposed Approach for Modelling Competitiveness of New Surface Coal MinesBy J. W. Joubert, R. C. W. Webber-Youngman, M. D. Budeba
"SynopsisCost estimation for surface coal mines is a critical practice that affects both profitability and competitiveness. New mines require these costs to be estimated using available information be
Jan 1, 2015
-
RI 5325 The Use Of Augers In Surface Mining Of Bituminous Coal ? Summary And ConclusionsBy Wilbur A. Haley
One of the purposes of the investigation was to determine and report on how coal augers are used to mine bituminous coal that is near outcrops and may not be mined otherwise by any other present-day m
Jan 1, 1957
-
Ground Control and the Inundation of the Retsof MineBy Vincent A. Scovazzo
On March 12, 1994, the 1,100-foot deep 2 Yard South panel of the 1l0 year-old Retsof Mine collapsed. At the time of this occurrence, the Retsof Mine was characterized as the world's largest, most
Jan 1, 1997
-
Elk River CollieryBy W. C. Whittaker
COMPLETED in November, 1943, at a cost of over $1,500,000, Elk River colliery of the Crow's Nest Pass Coal Company, Limited, has been laid out and equipped for an ultimate annual production of 1,
Jan 1, 1944
-
In-Pit Crushing and ConveyingBy I Lourel
In evaluating the installation of an in-pit crushing and conveying (IPCC) system for any mine, a number of options are available for each of the dig side, transport and dump side operations. Some of t
Jan 1, 2009
-
Engineering Considerations In The Tolerability Of Risk - Mine And Occupational Health And Safety 2010 ? 1 RiskBy Noel C. Joughin
In making judgements on tolerable levels of risk in industry, and in all spheres of life, it needs to be understood that every action gives rise to risk. Without risk, nothing can be done. Without ris
Jan 1, 2011
-
Operating Experiences with the High Pressure Gas Pipeline from Morwell to MelbourneThe construction of the pipeline was completed in June 1956 and the line placed into operation in December 1956, ie. it has now been in continuous operation for approximately three years under an oper
Jan 1, 1960
-
Development of the Benguet Mining DistrictBy CLYDE M. EYE
THE Sub-province of Benguet is in the North Central part of the Island of Luzon. Baguio, the capital, is situated on a piateau 5000 ft. above sea level, and is the main health resort of the Philippine
Jan 1, 1930
-
RI 9426 - Dust Considerations When Using Belt Entry Air to Ventilate Work AreasBy Robert A. Jankowski, J. Drew Potts
In this U.S. Bureau of Mines study, four underground respirable dust surveys were conducted to determine factors affecting belt entry dust levels and how using belt air to ventilate work areas affecte
Jan 1, 1992
-
The application of Microsoft® Active Server Page technology in the mining environment as a management information toolBy D. S. Richards
Computers have revolutionized the collection of data on modern mines. Never before has it been possible to collect data from all aspects of the mining value chain at rates now common. With this has co
Jan 1, 2003
-
Backfilling waste material composites environmental impact assessmentBy J. Kortnik
Mining has always been, and still is, an activity which is vital for the development of mankind. This is because a predominant proportion of industrial products and energy is produced from raw materia
Jan 1, 2003
-
Reservoir Engineering - General - Internal Anatomy of a Tight, Fractured Hunton Lime Reservoir Revealed by Performance – West Edmond FieldBy L. F. Elkins
In 1946 Littlefield, Gray and Godbold published a thorough geologic description of the West Edmond Hunton Lime reservoir, located in Central Oklahoma, and discussion of its early performance.l They st
Jan 1, 1970
-
RI 9248 - Assessment of Experimental Longwall Recovery Rooms for Increasing Productivity and Expediting Equipment Removal OperationsBy Eric R. Bauer
The U.S. Bureau of Mines, in cooperation with a southwestern Pennsylvania coal mining company, BethEnergy Inc., Mine No. 60, Eighty-Four, PA, recently assessed the feasibility of using pre driven reco
Jan 1, 1989
-
Remnant Ore Model Generation and Categorisation Post-block Caving Extraction at Salvador MineBy F Farías, D Villa
Codelco’s Salvador Project has been operating a block/panel caving mine for more than 50 years. This underground mining method dynamically mixes the ore and dilution. As a result, forecasting grades i
May 9, 2016
-
Microscopic Analyses of Bushveld Complex Rocks under the Influence of High TemperaturesBy G. O. Oniyide, H. Yilmaz
The South African platinum mines in the Bushveld Complex (BC) have unique features that distinguish them from the gold mines. They have a higher horizontal stress closer to the surface, lower occurren
Jan 1, 2016
-
RI 5916 Recovery Of Thorium From Ores In Colorado, Idaho, And Montana ? Summary And IntroductionBy S. R. Borrowman
This investigation by the Bureau of Mines was undertaken to develop information on the extractive metallurgy of thorite ores because potential ore bodies of this mineral have been found recently in Co
Jan 1, 1962
-
Investigation on Manufacture of Ferronickel from Low Grade Nickel Laterite by Prereducing-magnetic Separation-smelting ProcessThere is a strong demand for nickel metal due to quick development of stainless steel and new electrical materials, most of which is extracted from sulfide resources, resulting in a serious depletion
Jan 1, 2014
-
Transporting A TBM Through A Large City On The East Side CSO Tunnel Project In Portland, ORBy Niels Kofoed
Upon completion of the 6,200 m (20,340 lineal ft; lft) North Tunnel drive for the Portland East Side Combined Sewer Overflow (CSO) Tunnel project in Portland, OR, the slurry tunnel boring machine (TBM
Jan 1, 2011
-
The Metskill Program – Rapidly Developing Effective Young Engineers In The WorkplaceBy Nina Bianco, Diana Drinkwater
MetSkill is a professional development program for metallurgical engineers that integrates with normal duties in their first one or two years of service. Graduates work together on a structured techni
Jan 1, 2014
-
Production of Al-Ti master alloys from TiO2 in a DC arc furnace - SynopsisBy M. Abdellatif
The production of a 40% Al-Ti alloy was successfully proven at the lab scale, using pure TiO2, aluminium, and lime. These tests were conducted in an induction furnace maintained at 1600?16250C. The in
Jan 1, 2009