Chuquicamata Sulphide Plant: Concentrator DesignBy E. F. Raffo
THE design of the Chuquicamata concentrator offered an unusual combination of problems, all of which had, in one way or another, a definite effect upon the final arrangement of all the equipment and n
Jan 1, 1952
-
Chuquicamata Sulphide Plant: Concentrator OperationBy D. S. Sanders, E. W. Witcomb
FLOTATION tests, from which the flowsheet for the concentrator was determined, were made in a pilot mill at Chuquicamata and later comparative testing of full size flotation cells was done at the Ande
Jan 1, 1952
-
Chuquicamata Sulphide Plant: Crushing SectionBy A. P. Svenningsen
IN the early stages of design it was not considered necessary that separate crushing plants be built for the new sulphide concentrator and smelter until sometime in the future. The plan was to use the
Jan 1, 1952
-
Chuquicamata Sulphide Plant: Electrical DistributionBy Stanley F. French
ELECTRICAL power and distribution for the sulphide ore plant is an addition and extension of the existing power system which has served the oxide reduction plant since its inception in 1914. The power
Jan 1, 1952
-
Chuquicamata Sulphide Plant: PipingBy J. P. Manning
UNQUESTIONABLY, the outstanding feature of the piping for the sulphide plant is the large amount which had to be done in almost every size from instrument tubing to 84 in. OD pipe. In this article th
Jan 1, 1952
-
Chuquicamata Sulphide Plant: SmelterBy H. G. Dwyer
CONSIDERATION for future expansion influenced the design of the new smelter at Chuquicamata. The section of the smelter now going into operation, while large, represents only little more than half of
Jan 1, 1952
-
Chuquicamata Sulphide Plant: Smelter StacksBy Clarence W. Dunham
BECAUSE of the earthquakes that occur at Chuquicamata, the design of the smelter stacks constituted the most difficult structural problem of the entire sulphide ore project. Slight tremors occur almos
Jan 1, 1952
-
Chuquicamata Sulphide Plant: Tailing DisposalBy R. M. Kuralt
CONCESSION from the Chilean government granting the company use of the Rio Salado water stipulates that a minimum of 35,000 metric tons of such salty water must be diverted from the Salado daily, and
Jan 1, 1952
-
Chuquicamata Sulphide Plant: Waste Heat Power PlantBy B. F. Koch
COPPER reverberatories develop large amounts of exit gases of a temperature in the neighborhood of 2000°F. The gases are not only of a noxious nature but must usually be disposed of at considerable he
Jan 1, 1952
-
Chuquicamata Sulphide Plant: Water SupplyBy W. E. Rudolph, R. E. Baylor
DUE to its location in the Atacama Desert, one of the most barren of the earth's surfaces, Chuquicamata's water supply presents unusual problems. Yearly rain-fall averages less than one tent
Jan 1, 1952
-
Chuquicamata: Quality Challenges throughout 100 Years of Copper Electrorefining and ElectrowinningBy J. C. Salas, A. Weishaupt, J. A. Guzman
The origins of the electrorefining process date back to 1869, when the first ER cathodes were produced at Pembrey, South Wales. By the time that Pembrey was closing, Chuquicamata tank house was under
Jan 1, 2019
-
Churn-Drilling Costs, Sacramento HillBy Arthur Notman
(San Francisco Meeting, September, 1915) SACRAMENTO HILL is a mass of granite porphyry intruded along a fault between Paleozoic sediments and pre-Cambrian schists in the Bisbee district, Cochise Coun
Jan 8, 1915
-
Cianuración y electrodeposición de concentrados gravimétricos con alta ley de oroBy Luis de la Cruz Rengifo
El presente trabajo señala el tratamiento del concentrado gravimétrico con alta ley de oro en la planta concentradora Compañía de minas Orcopampa S.A. La aplicación del tratamiento se realiza a través
Apr 1, 1991
-
Ciencia de explosivos y voladurasBy H. Ahrens
El presente estudio refiere la importancia de los explosivos y detonaciones en el campo de la minería a través de una breve revisión historiográfica, legislación, problemas relacionados con la voladur
Nov 20, 1972
-
Cierre de depósitos de relaves en remediación de pasivos ambientales mineros en HualgayocBy Félix Lewandowsky
El presente texto describe las actividades para corregir los pasivos ambientales heredados y asumidos bajo responsabilidad de la Compañía Minera Colquirrumi S.A. Para ello, se elaboró un plan de cierr
Jan 1, 2015
-
Cierre de minas en minería a tajo abierto: Experiencias de cierre progresivo en botaderos de desmonteBy Ezequiel Pomachagua Quijada
En el Perú, el cierre de yacimientos es una etapa nueva de la vida productiva minera, pues a partir del año 2005 la norma rige y se les otorga un plazo de un año para elaborar y lograr la aprobación d
Aug 1, 2015
-
Cierre de procesos de reasentamiento y monitoreo de indicadoresBy Carol Harrison
"Diseñar, implementar y evaluar un proceso de adquisición de tierras y reasentamiento ha sido un reto para los proyectos mineros en el pais, pues es un tema fundamental para el desarrollo del proyecto
Sep 1, 2017
-
Cigar Lake Tubbing InstallationBy Steven Dempsey
Overview What is Tubbing? A look at Cigar Lake Tubbing Design The Tubbing Installation Backwall Grouting
May 1, 2013
-
Cigar Lake?s Jet Boring Mining MethodBy Martin Wacker
Cameco Corporation, on behalf of a joint venture, is preparing surface and underground facilities at their northern Saskatchewan property in preparation for the future operation of a high-grade uraniu
Apr 1, 2005
-
CIL Gold Extraction from Preg Robbing Autoclave DischargesBy G. Van Weert
In the spring of 2010 double refractory ores from historical stockpiles were processed through Barrick's Goldstrike pressure oxidation facility, thereby providing preg robbing feeds for a variety
Jan 1, 2011