Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Cautious Blasting in Critical Areas at Ramagundam Super Thermal Power StationBy N. Jayaraman, V. Srikant, A. Radhakrishna
Addition of a 500 MW unit to the existing units at Ramagundum Thermal Power Station requires blasting of large volumes of rock very close to sensitive installations like Turbo generator, Generator tra
Jan 1, 2003
-
Cautious optimism for the future of mining; Resolution Copper eyes next stepsBy William Gleason
"The times they are a changing, and, for the mining industry, the optimism is high. On Nov. 8, Donald Trump was elected as the 45th president of the United States, and the Republican Party won a major
Jan 1, 2017
-
Cautious optimism rules for attendees of 2017 SME Annual ConferenceBy William Gleason
"More than 6,300 people converged on the Colorado Convention Center for the 2017 SME Annual Conference and Expo and 119th National Western Mining Conference in Denver, CO on Feb. 19-22. Many of them c
Apr 1, 2017
-
Cavability Investigation Of A Stratabound Copper Deposit, Tong Kuang Yu Mine, Shanxi Province, ChinaBy W. C. Lacy
Stratabound copper ore bodies in thick Proterozoic metamorphosed sedimentary and volcanic rocks at the Tong Kuang Yu Mine in southern Shanxi Province of China were considered as possibly being amenabl
Jan 1, 1989
-
Cavability of Ore DepositsBy Francis S. Kendorski
INTRODUCTION Caving offers the lowest cost per ton of any large-scale mining method, but its successful application demands an ore body that conforms to several rigid requirements. The deposit must
Jan 1, 1982
-
Cavability Study Of A Competent Roof - A Case StudyBy T. N. Singh
An evaluation was made on the cavability of the roof formation of Dishergarh seam including caving sequence, caving span, and load on powered support.
Jan 1, 1994
-
Cave Initiation And Growth Monitoring At The Henderson MineThe initiation of a panel cave is an extremely important and infrequent event in the life of a large underground caving operation. A new cave was initiated at the Henderson Mine in 1991, 15 years afte
Jan 1, 1994
-
Cave management and secondary breaking practices at Palabora Mining Company - SynopsisBy S. Ngidi
Palabora Mining Company operates a low grade underground copper mine situated in the Limpopo Province, South Africa. Full production was first reached in May 2005 after a successful transition from an
Jan 1, 2007
-
Cave Management As An Ore Reserve Management Tool Ensuring Optimal Life Of Mine For Palabora Mining CompanyPalabora Mining Company is operating a copper block cave mine in the Limpopo Province of South Africa. The mine was developed in the late nineties with a target ore reserve of 220 million tonnes of c
Jan 1, 2007
-
Cave management at Finsch Mine - SynopsisBy C. A. Preece
Finsch Diamond Mine, part of De Beers Consolidated Mines (DBCM), is situated between Kimberley and Postmasburg in the Northern Cape, South Africa. The kimberlite pipe was discovered in 1960 and De Bee
Jan 1, 2007
-
Cave mine pillar stability analysis using machine learningBy R. J. Quevedo, Y. A. Sari, S. D. McKinnon
The large scale of cave mines leads to many challenges, including operational logistics and geomechanics design. In current practice, pillar stability assessment relies almost exclusively on stress an
Mar 14, 2024
-
Cave Mining - State-of-the-ArtCaving is the lowest cost underground mining method, provided that drawpoint spacing, drawpoint size and ore handling facilities are designed to suit the caved material and that the drawpoint horizo
Jan 1, 1995
-
Cave Mining - The State Of The ArtCaving is the lowest cost underground mining method provided that the draw point spacing, draw point size, and ore-handling facilities are designed to suit the caved material, and that the draw point
Jan 1, 1994
-
Cave Mining at Premier Diamond MineBy A Croll
A panel cave using LHDs for ore extraction came into production at Premier in 1990 at a depth of 630 metres below surface on the western side of the mine in the BA5 mining block. A post-undercut minin
Jan 1, 2000
-
Cave Propagation and Open Pit Interaction at the Ernest Henry MineBy E Ah Mu and C R Lilley, A D. Campbell
Cave propagation is a complex process due to interacting variables such as mine geometry, rock mass heterogeneity and complex structural networks and stress fields. The Ernest Henry sublevel cave (SLC
May 9, 2016
-
Cave Tracker Flow Monitoring System Installation at Argyle Diamond MineBy M Wilson, D Whiteman, P Kuiper, S Talu, G Watt, A van As
Once the draw process has begun in a block cave, it is very difficult to identify which regions of the cave have successfully propagated, where the caved material is flowing from and where it is flowi
May 9, 2016
-
Caveat Emptor Or A Buyer's Guide To Pile Integrity Testing - IntroductionBy Joram M. Amir
During recent years, the integrity testing of piles has made considerable progress. With the availability of portable and powerful computers, practically all integrity testing equipment is now digital
Jan 1, 1999
-
Cavern Design Using Modern SoftwareBy S R. Hencher
The development and availability of modern software for cavern design over recent years has provided design engineers with a range of usable design tools. The paper discusses the range of modern softw
Jan 1, 1999
-
Cavern Response to Earthquake Shaking With and Without DilationBy M. Plesha, A. Zubelewicz, K. Connor, T. B. Belytschko, O&apos
INTRODUCTION The Northwestern University Rigid Block Model (NURBM) has been extended to explicitly model dilatant behavior of rock joints. By incorporating dilatancy, the resistance to shear displ
Jan 1, 1986
-
Caving and Drawing at ClimaxBy F. S. McNicholas
UNTIL the fundamentals of the physical behavior of rocks are completely understood, progress in block caving must proceed upon a cut and try basis. Criteria of rock failure are many and varied. If a r
Jan 11, 1950