Search Documents

  • SME
    Increased Recovery From Preg-robbing Gold Ore At Penjom Gold Mine

    By Gordon Lewis

    The Penjom Gold Mine is one of the world's worst preg-robbing gold ores, yielding very low recoveries from traditional CIL methods. Gold recovery from the cyclone underflow was targeted to recover as

    Jan 1, 1999

  • NIOSH
    Increased Recovery From Western Phosphates - Objective

    Develop a method for recovering phosphate from a wide variety of complex western phosphate materials, including low-grade ores, tailings, and unused fines. Approach A flotation technique is used f

    Jan 1, 1982

  • TMS
    Increased Recycled Aluminum Content during Remelting by Incorporating Compositional Uncertainty

    By Brommerm Tracey, Britt Elin Gihleengen, Elsa Olivetti, Hans Ole Riddervold, Randolph Kirchain, Geir Øyen

    "Compositional uncertainty in secondary materials and variable processing conditions inhibits secondary material utilization in the production of aluminum alloys. Efforts to implement optimization mod

    Jan 1, 2011

  • ABM
    Increased Reliability And Operational Safety Of An Air Separation Unit From The Installation Of A Chiller Refrigeration Unit

    By Caio Trindade Almeida, Tharcysio Oliveira Rocha Paiva

    Tharcysio de Oliveira Rocha de Paiva2

    Oct 3, 2019

  • AUSIMM
    Increased Rolling Mill Capacity at Kwinana and Newcastle

    The large increase in secondary industries in this country, during the war and post war periods, has caused a shortage of capacity for the production of merchant bar.To overcome this shortage, an expa

    Jan 1, 1957

  • SME
    Increased Safety, Better Production Through Use Of Electronic Communication And Electronic Equipment

    By Earl A. Berry

    Someone once said, "The safest mine is one in which no one goes into." We all recognize this as being perhaps wishful thinking. We also recognize in it a certain amount of truth and an ultimate goal i

    Jan 1, 1958

  • CIM
    Increased SAG Grinding Capacity at Goldex Secondary Crushing of SAG Mill Feed

    By A. Allaire

    The Goldex operation of Agnico-Eagle Mines (AEM) commenced operations in the spring of 2008. Following some months of initial operation, the grinding circuit capacity was under-performing according to

    Jan 1, 2012

  • CIM
    Increased SAG Grinding Capacity at Goldex Secondary Crushing of SAG Mill Feed (bad27958-8860-46a5-8ff9-5edadd1fb4dd)

    By D. Runnels, A. Allaire, J. Fournier, Y. Sylvestre, F. Robichaud

    The Goldex operation of Agnico-Eagle Mines (AEM) commenced operations in the spring of 2008. Following some months of initial operation, the grinding circuit capacity was under-performing according to

    Jan 1, 2012

  • SME
    Increased TBM Mobility and Adaptations for Special Projects

    By Dennis Ofiara

    Several recent tunnel jobs have required special adaptations of hard rock TBMs. Some of the special job conditions are ?no blast? launch requirements, small shafts or launch pits, proximity to existin

    Jan 1, 2008

  • SME
    Increased value of refined high sulfur coal

    By P. R. Dugan

    Sulfur removal from high sulfur coal has several objectives including: a) reduction of the atmospheric load that contributes to the problem of acid precipitation; b) reduction of ash, which contribute

    Jan 1, 1988

  • CIM
    Increased ZnS Flotation Response Due to Slime Removal with Methanol Treatment

    By E. V. Manlapig, M. A. Hampton, M. E. Holuszko

    Methanol treatment of ZnS particles has been found to remove slimes and facilitate flotation. The removal of slimes renders the ZnS surface more hydrophobic, resulting in an increase in the hydrophobi

    Jan 1, 2009

  • CIM
    Increasing Anode Thickness to Optimise Copper Production at the Kidd Metallurgical Site

    By M. R. Coffin

    In recent years, improved operation of the Kidd smelter has resulted in an increase in blister production capacity. Due to manpower and equipment limitations anode production and treatment rates could

    Jan 1, 2007

  • AIME
    Increasing Assay Furnace Capacity by Larger Muffles

    By Joseph T. Roy

    MINING revival during the last few years has brought about a considerable increase in the number of gold and silver determinations made, noticeable in all branches of the industry but especially so in

    Jan 1, 1938

  • SME
    Increasing Autogenous and Semi-Autogenous Mill Capacity Through Grinding Process Optimization

    By Y. C. Lo

    Grinding process optimization is an exciting new tool for maximizing the performance of existing mineral processing plants. This paper discusses the methodology of optimization which involves plant sa

    Jan 1, 1998

  • CIM
    Increasing Availability through Advanced Gearless Drive Technology

    By C. Dirscherl, M. Combes

    "Declining ore grade, leading to increased material transport and plant throughput requirements, is one of the major challenges in the current mining environment. This is accompanied by rising energy

    Jan 1, 2014

  • SME
    Increasing Availability through Advanced Gearless Drive Technology (581a2310-147b-4546-9b01-72b08d1517e0)

    By C. Dirscherl

    "Declining ore grade, leading to increased material transport and plant throughput requirements, is one of the major challenges in the current mining environment. This is accompanied by rising energy

    Jan 1, 2015

  • SME
    Increasing Availability through Advanced Gearless Drive Technology (bdb34c0f-eece-4038-82e2-fac055da3c4a)

    By C. Dirscherl

    "Declining ore grade, leading to increased material transport and plant throughput requirements, is one of the major challenges in the current mining environment. This is accompanied by rising energy

    Jan 1, 2015

  • ISEE
    Increasing Back Break Using High Speed Blasting Techniques

    By Terry L. Cook

    RAG Coal West, Inc., Belle Ayr Mine is located in the heart of Wyoming’s rich Powder River Basin coalfield. Belle Ayr utilizes an open pit, truck/shovel operation to strip the overburden off the 70’se

    Jan 1, 2004

  • SAIMM
    Increasing Capacities By Retrofitting Mist Eliminators

    By S. A. Ziebold

    There is often a need to increase capacity through existing mist eliminator installations without significant tower modifications. Often there is not enough extra space outside existing vessels unless

    Jan 1, 2007

  • AUSIMM
    Increasing Capacity and Efficiency of Grinding Circuits with High Frequency Screens

    By J Wheeler

    The objective of this paper is to examine the operation of high frequency screens in closed circuit grinding, where the outcomes achieved indicate favourable economic gains at the comminution stage an

    Aug 8, 2011