Search Documents

  • AIME
    In-Situ Uranium Mining With Oxygen (fb4ee5cb-ddf1-4044-a39c-0d689ac0eaf8)

    By L. M. Litz

    Study results are presented in which gaseous oxygen was dissolved in the leach liquor at concentrations of the order of 300 ppm. This oxygen-containing solution was injected into portions of a field b

    Jan 1, 1983

  • TMS
    In-Situ XRD Investigation of Bauxite Dehydroxylation

    By Hong Peng, James Vaughan

    Thermal activation of bauxite has been proposed to enable bauxite dissolution at a reduced digestion temperature and also to reduce the organic content in the liquor. Research has been carried out on

    Mar 1, 2018

  • SME
    In-Stope Back-Filling Control Using Millimeter Wave Radar at Olympic Dam Mine, South Australia

    By G. Brooker

    The back-filling operation at Olympic Dam mine supports a 9.8 million tonne per year (Mtla) underground Longhole Open Stoping operation. It involves a combination of Cemented Aggregate Fill (CAF), Sur

    Jan 1, 2001

  • SAIMM
    In-stope bolting for a safer working environment - Synopsis

    By P. Henning

    Rock fall accidents continue to be the main cause of fatal and serious injuries in the mining industry. Although there has been an improvement in the FOG (falls of ground) related fatal and serious in

    Jan 1, 2010

  • SAIMM
    In-stope leaching with thiourea

    By P. A. Laxen, P. J. van Staden

    In situ leaching tests with thiourea as the lixiviant were caried out in two worked-out stopes at the No. 6 shaft at Rand Leases Gold Mining Company. Dissolution rates of 0,9 and 0,7 9 of gold per wee

    Jan 1, 1989

  • AUSIMM
    In-stope Material Handling

    In South African gold mines, the types of material requiring transportation to the stoping areas include timber packs, explosives, hydraulic rock props, scrapers, scraper winches, pipes, pumps and bac

    Jan 1, 2003

  • CIM
    In-the-hole drilling at Heath Steele Mines Limited

    By Errol Ladner

    The application of large-diameter bore holes in underground operations at Heath Steele was first tried in February, 1975. Since that time, 90,000 feet of 6-l/2-inch holes have been drilled, primarily

    Jan 1, 1979

  • AUSIMM
    In-The-Hole Drilling Equipment and Techniques

    I.T.H. Drilling has been accepted as a tool used daily for both production and service work in Australian underground mines. For this reason, it is of interest to examine the rigs and drilling equ

    Jan 1, 1978

  • SME
    In-the-wall haulage for open-pit mining

    By B. Seegmiller, W. A. Hustrulid, O. Stephansson

    Introduction The concept of in-the-wall haulage was formally introduced to the mining community in the early 1970s. The basic concept is simple. Rather than the traditional in-the-pit haulage/acces

    Jan 1, 1988

  • SME
    In-the-wall haulage for open-pit mining - by W.A. Hustrulid, B. Seegmiller, and 0. Stephansson TechnicaLPapers, MINING ENGINEERING, Vol. 39, NO. 2 February 1987, pp. 11 9-123

    By D. Nilsson, B. Aaro

    To find out if there are any potential savings in "in-the-wall haulage for open pits," the Swedish companies ASEA and Kiruna-Truck in 1984 gave us financial support to study this solution in more deta

    Jan 1, 1990

  • CIM
    In-track assessment of premium and intermediate grade rail steels

    By K. J. Griffin, G. W. Rosval

    "In our increasingly competitive market, attempts to improve productivity by increasing axle loads have placed more severe demands on rails. CP Rail thus requires stronger, tougher, and more wear-resi

    Jan 1, 1988

  • ISEE
    In-Transit Security, Technology & Best Practices

    By Mark Bauckman

    Discussion Topics • Market Needs • Technology Developments & Best Practices • Industry & Government Developments • Future Possibilities & Your Role

    Jan 1, 2006

  • ISEE
    In-Transit Security, Technology & Best Practices / ISEE Annual Conference on Explosives & Blasting Technique Security Workshop

    By Mark Bauckman

    Discussion Topics • Market Needs • Technology Developments & Best Practices • Industry & Government Developments • Future Possibilities & Your Role

    Jan 1, 2006

  • AIME
    In-Transit Wind Erosion Losses of Coal and Method of Control

    By K. H. Nimerick, G. P. Laflin

    Laboratory data and field tests indicate that substantial losses of valuable coal can be caused by wind erosion. Wind tunnel tests show the effects of wind velocity and particle sizing on the amount o

    Jan 8, 1979

  • AIME
    In-Transit Wind Erosion Losses of Coal and Method of Control (9ff75c1b-afcf-4988-9552-e2a8369b94b1)

    By K. H. Nimerick, G. P. Laflin

    Laboratory data and field tests indicate that substantial losses of valuable coal can be caused by wind erosion. Wind tunnel tests show the effects of wind velocity and particle sizing on the amount o

    Jan 1, 1980

  • SME
    Inability to communicate : How technical professionals cut short their management careers

    By H. Richard Eisenbeis, Donna M. Watkins

    Many technical professionals (tp)* desire to occupy upper level management positions. But career paths for most scientists and engineers do not extend beyond their specific disciplines. This is unfort

    Jan 8, 1987

  • CIM
    INAC: Supporting Involvement of Aboriginal People in the Economy

    By Jr. Arcand

    Canadian Economy ? Getting Results ???? A stronger Canadian economy ???? National debt cut ???? Taxes reduced, tax-free savings account, support for manufacturing sector ???? Assisting with inf

    May 1, 2008

  • NIOSH
    Inaccuracy Of Area Sampling For Measuring - The Dust Exposure Of Mining Machine Operators In Coal Mines

    By F. N. Kissell, H. K. Sacks

    This study examines the accuracy of area sampling for measuring the dust exposure of mining machine operators in coal mines. The specific objective of this research was to find locations where an area

  • SME
    Inaccuracy Of Area Sampling For Measuring The Dust Exposure Of Mining Machine Operators In Coal Mines (cbfe9c3c-ee62-488f-9c4a-6c588b436e59)

    By F. N. Kissell, H. K. Sacks

    This study examines the accuracy of area sampling for measuring the dust exposure of mining machine operators in coal mines. The specific objective of this research was to find locations where an area

    Jan 1, 2003

  • DFI
    Inaccurate Interpretation Of Offshore Geotechnical Site Investigation Results And Risk Associated - A Case Study Of Conductors Collapse In Driving

    By Hodjat] [Shiri

    A 4-legged jacket structure was installed by an Offshore Installation Contractor (OIC) in the Persian Gulf. In addition to four open-end pipe piles, six conductors were installed by OIC. During the in

    Jan 1, 2006