Search Documents

  • SME
    Improving Phosphate Flotation With New Chemistry, Smart Flowsheet And Novel Equipment

    By P. Zhang

    The Crago “Double Float” process is widely used in upgrading phosphate ore. This process is inefficient, as it floats about 30-40% of the sands in the flotation feed twice and requires a deoiling step

    Jan 1, 2004

  • AUSIMM
    Improving Plant Operations Using Synergistic Solvent Extraction Technology and Organic Monitoring

    By K B. Barnard, M D. Urbani

    A synergistic solvent extraction (SX) system for nickel and cobalt recovery using Versatic 10 and decyl-4-pyridinecarboxylate was tested with BHP Billiton pilot plant leach solution. Another synergist

    Jan 1, 2005

  • SME
    Improving Plant Performance with "World-Class" Management Techniques

    By Bruce W. Cavender

    There is a tendency for managers of mining companies to regard the performance of a process plant as essen­tially fixed, with only incremental improvements to be realized by optimizing individual unit

    Jan 1, 1993

  • CIM
    Improving Pore Water Quality in Reactive Tailings with Phosphate Mining Wastes

    By M. Kalin

    Tailings deposits are frequently the source of ground water contamination due to the transport of contaminated tailings pore-water. If amendments to tailings covers could be made to facilitate a preci

    Jan 1, 2004

  • SME
    Improving Power Plant Performance And Reducing Emissions Through The Use Of Pneumatic Dry Cleaning For Low Rank Coal

    By R. J. Snoby, J. K. Alderman

    Although once fairly common as a method of coal preparation in the United States, dry cleaning has virtually disappeared. Low-rank coals used for power generation in the western U.S. are suited for dr

    Jan 1, 2001

  • SAIMM
    Improving processing by adaption to conditional geostatistical simulation of block compositions

    "Exploitation of an ore deposit can be optimized by adapting the beneficiation processes to the properties of individual ore blocks. This can involve switching in and out certain treatment steps, or s

    Jan 1, 2015

  • AUSIMM
    Improving Production Drilling and Blasting in the Kim South Orebody at Agnew Gold Mine

    By T A. Carter

    In 2010 Agnew Gold Mine (AGM) struggled to produce the required tonnages from its stopes. The longhole rises used to create void in stopes were unreliable and often failed to gain the designed rise he

    Mar 24, 2014

  • CIM
    Improving productivity and efficiency in the mining industry: tile challenge of the 80s

    By G. R. Tostengard

    "The paper identifies functional areas which frequently can yield significant productivity improvement. Emphasis is placed on the repair and maintenance, material supply and training functions. Succes

    Jan 1, 1983

  • SAIMM
    Improving productivity at an open-pit mine through enhanced short-term mine planning

    By T. J. Otto, G. C. Lindeque

    Productivity is improved by increasing the ratio of output to input. In an operating open-pit mine, improving the productivity of heavy mining equipment (HME) enables the unit cost of production to be

    Nov 1, 2021

  • ISEE
    Improving Productivity at Farco Mining of Texas Using Emulsion/ANFO Blends

    By Nick Lewis

    Farce Mining of Texas is a surface coal mine located in Laredo, Texas. Farce mines and sells approximately 600,000 tons /year of bituminous coal. A map showing the location of Laredo is provided in F

    Jan 1, 1994

  • AUSIMM
    Improving Productivity at Jim Walter Resources, Inc

    By Dixon CA

    In the early 1970s, Jim Walter Resources, Inc. (JWR) embarked on a coal mine expansion program that was unparalleled in the history of the United States. With a small nucleus of people then operating

    Jan 1, 1991

  • CIM
    Improving Productivity for Polish Hard Coal Mining

    By M. Turek

    Cost management in the conditions of increasing competition and unforeseen market turbulence constitutes one of the key areas of the enterprise?s activity. In the last two years the demand for hard co

    Aug 1, 2013

  • SME
    Improving Productivity In Thin Seam Continuous Mining Systems Through Management And Technology Changes

    By S. G. Britton

    Thin seam mining presents unique challenges when management or economic conditions require significant productivity increases. These challenges are increased depending upon the presence of various ext

    Jan 1, 1991

  • SME
    Improving Productivity in Thin-Seam Continuous Mining at Tanoma

    By Scott G. Britton

    Thin-seam mining presents unique challenges when management or economic conditions require significant productivity increases. These challenges can be further amplified depending on such factors as la

    Jan 1, 1991

  • SME
    Improving Productivity Through Better Blasting Control

    By Richard L. Ash

    Less than optimum production in mining always results when poorly blasted material is provided at loading points. More often than not the cause is due to blasting founds that fail to fully control and

    Jan 1, 1975

  • IMPC
    Improving Profitability, Sustainability and the Overall Operating Efficiency from Mine to Process in Russian Operations

    By I. Yelkin, Erico Tabosa, Alex Jankovic, R. Hayashida, R. Faveere

    "The mining industry faces growing challenges from more complex and lower grade deposits, rising costs, limited energy and water availability, and increasing societal pressure to operate more sustaina

    Jan 1, 2018

  • SME
    Improving Protection against Respirable Dust at an Underground Crusher Booth

    By J. R. Patts, J. P. Rider, J. A. Organiscak, A. B. Cecala

    "The U.S. National Institute for Occupational Safety and Health completed a 15-month study at an underground limestone mine crusher booth that evaluated three research parameters: (1) the effectivenes

    Jan 1, 2018

  • CIM
    Improving Pulp Level Detection in a Flotation Column Using a Neural Network Algorithm

    By Guillermo Diaz, Roberto Pérez, René del Villar

    "Pulp-froth interface position is a key variable in column operation. In plant practice, it is commonly estimated through a system of three pressure-transducers which allows the calculation of the pul

    Jan 1, 1995

  • CIM
    Improving Pumping Capacity And Reliability In The Mcclean Lake Leach Circuit

    By J. Aydt, W. McCombe, H. McLaughlin, L. Nightingale-Mercer

    The McClean Lake mill is located approximately 850 kilometers north of Saskatoon, Saskatchewan, Canada and is operated by Orano Canada Inc. (Orano). The mill was designed to process high grade uranium

    Jan 1, 2020

  • AUSIMM
    Improving Quality Assurance and Quality Control Practices - Basic Methodology Using Worked Examples

    By P Stoker

    The need for quality assurance and quality control (QA/QC) in the sampling and assaying of minerals is fundamental to the reliability and confidence of a mineral resource estimate, reserve estimate an

    Jan 1, 2009