Improved Contact Angle Apparatus for Flotation ResearchBy Kenneth N. McLeod, Donald W. McGlashan
In the use of free bubbles with precise temperature control and continuous pH measurement, the contact angle apparatus differs from all previous equipment. Experimental procedures differ sharply from
Mar 1, 1956
-
Improved Contracting Practices and Ground Risk Management Using Geostatistics - NAT2022By Jacob Grasmick, Bill Newns
Despite ongoing digitization and “hardware” technological advances, geotechnical uncertainty remains the most significant risk in underground and tunnel construction. And, whilst they are commonly hel
Dec 1, 2022
-
Improved control of fuming and reverberatory furnace operation by rapid slag analysisBy A. Mcdonald
"An X-Met Analyzer was purchased from Outokumpu in late 1983for use in the Hudson Bay Mining and Smelting smelter. Its first use was in the fuming plant to give zinc assays of each charge of slag tapp
Jan 1, 1987
-
Improved Control of Phosphate Flotation by means of a Simple Mineralogical Regression ModelBy J. L. Gaigher
A simple mineralogical regression model is described, which was devised in order to help the flotation plant cope with rapidly changing headgrades and feed mineralogy. Minerals in the feed were dete
Jan 1, 1987
-
Improved Converter ControlBy J. -P. Nepper
It has been possible to largely contain converter aisle emissions of SO2 and fumes in the case of batch-wise operated Peirce Smith converters during normal blowing periods with the help of suitably de
Jan 1, 1992
-
Improved Converter Control (54f63626-b2e1-4139-8fcf-d778be45550b)By J. -P. Nepper
It has been possible to largely contain converter aisle emissions of SO2 and fumes in the case of batch-wise operated Peirce Smith converters during normal blowing periods with the help of suitably de
Jan 1, 1992
-
Improved Copper Electrowinning Operations Using Wrought Pb-Ca-Sn AnodesBy R. D. Prengaman
Wrought lead-calcium-tin anodes developed by RSR Corporation have improved the performance compared with the other lead alloy anodes. These anodes have been in continuous service at various locations
Jan 1, 1999
-
Improved Copper Flash Smelting at Olympic DamBy W Taylor, S Chen, R Haywood, M White, R West, J Ranasinghe
In March 2012 a combined BHP Billiton and Hatch team embarked on a program to improve the concentrate burner efficiency of BHP Billiton’s Olympic Dam copper flash smelting furnace. A multi-faceted app
Sep 7, 2015
-
Improved Copper Smelter and Converter Productivity Through the Use of a Novel High-Grade FeedBy Eugene Jak
Copper sulphide processing technologies face increasing pressures associated with decreasing concentrate grade leading to increasing thermal inefficiency and lower productivity. Impurity concentration
-
Improved Copper/Iron Selectivity in Solvent ExtractionBy J. J. Taute, G. Chisakuta, P. Bwando, G. Mitshabu
"BASF Mining Solutions have developed a new generation of copper solvent-extraction reagents that offer significant benefits over the existing reagents available to the industry today. Initial laborat
Jan 1, 2015
-
Improved crushing chamber of a cone crusherBy A. L. Grabovski
The potential of eccentric cone crushers for fine crushing has been improved by increasing the swing frequency of the moving cone, balancing the crusher, ensuring uniform feed via a rotating funnel wi
Jun 21, 1905
-
Improved CX Process for Spent Lead Acid Batteries TreatmentBy Tullio Corsini
Scrap battery recovery process, developed by Engitec Impianti S.p.A., is improved transforming batches operations in continuous. Benefits expected: constant and better quality of the products; easie
Jan 1, 1993
-
Improved Decopperising of Lead Bullion at Port PirieBy Miller M. J, Bauer J. C
The continuous copper drossing process operated at Port Pine since 1962 has had limited copper removal capacity as determined by a maximum tolerable Cu/S ratio in feed and the level of sulphur in b
Jan 1, 1989
-
Improved Defect Control and Mechanical Property Variation in High Pressure Die Casting (HPDC) of A380 Alloy by High Shear Melt ConditioningBy J. L. Nebreda, Z. Fan, J. B. Patel
"A380 alloy has been widely employed to produce thin-wall components via high pressure die casting (HPDC). During HPDC processing, there is a significant problem of property variation even with the ve
Jan 1, 2018
-
Improved Design Of Coal Pillars For U.S. Mining ConditionsBy Z. T. Bieniawski
This paper presents the results of a survey of room and pillar dimensions and design practice in U.S. coal mines aimed at improving the design procedures in room and pillar mining. A review is given o
Jan 1, 1981
-
Improved Design of Room-And-Pillar Coal Mines for U.S. ConditionsBy Z. T. Bieniawski
The efficient and safe design of room-and-pillar coal mines still remains as one of the pressing problems facing the mining industry in the United States. Present day design is a trial-and-error appro
Jan 1, 1983
-
Improved Dewatering Of Coal By Steam Filtration - Part IBy C. E. Silverblatt
The advent of larger quantities of -1/4 inch coal in the raw feed to the preparation plant and the necessity of recovering this material has made the problem of meeting product moisture specifications
Jan 1, 1964
-
Improved Dewatering of Kaolinite Clay Mineral DispersionsBy P. Mpofu
In this work, the modification of interfacial chemistry of colloidally stable kaolinite clay dispersion has been carried out to improve its flocculation performance and dewatering behaviour. Synergist
Jan 1, 2004
-
Improved Drainage by Drilled Filter Drains, Dam Safety Upgrade, Case StudyBy Carl-Oscar Nilsson, Åke B. Nilsson
"The embankment dam at Storfinnforsen is 23 m high and was completed in 1954. The dam has an impervious zone with timber sheet piles and a support fill of glacial till. The pore water pressure in the
Jan 1, 2016
-
Improved Drill and Blast Designs Free $3.6m of Ore for Surface Copper Mine - SME Annual Meeting 2025By Liz Diaz, Tacio Ferreira
Capstone Copper’s Pinto Valley Mine faced challenges in recovering rock and ore on final walls because of geotechnical constraints that require restrictions on methods for loading blastholes adjacent
Feb 1, 2025