Search Documents

  • SME-ICGCM
    Highwall Mining of Thick, Steeply Dipping Coal: A Case Study in Geotechnical Design and Recovery Optimization

    By David P. Conover, Jake Bain, Christopher M. Ross

    "Highwall mining of thick (up to 100 ft) steeply dipping (20° or more) coal seams provides many challenges, both geotechnically and operationally because seam dips near or in excess of highwall mining

    Jan 1, 2017

  • CIM
    Highwall mining technology— A review of current status and design methods

    By N. R. Thote, J. L. Porathur, C. P. Verma

    Highwall mining is a highly mechanized coal mining method associated with several advantages, such as a very high production rate (approximately 3,000 t/d) and low production costs. There is no requir

    Jan 1, 2014

  • AUSIMM
    Highwall Mining Trials at Callide Mine

    By Boyd G

    This paper describes the planning, analysis, design and operational experience of highwall mining based on auger drilling techniques applied to thick coal seams exposed in an opencut highwall. Bein

    Jan 1, 1991

  • IOM3
    Highwall mining: practical estimates of coal-seam strength and the design of slender pillars

    To maximise recovery by highwall mining, pillars must be designed which are long, slender and of relatively low width-to-height ratios. The strength of pillars with width/height less than 2 depends pr

    Jun 21, 1905

  • SME-ICGCM
    Highwall Monitoring to Combat Rockfall Accidents at Opencast Collieries

    By John Latilla

    Following its introduction on underground collieries, the mandatory Code of Practice to Combat Rockfall Accidents (CoP) was applied to all opencast operations of lngwe Collieries (the South African di

    Jan 1, 2002

  • ISEE
    Highwall Safety

    By John C. Didlinger, John L. Didlinger

    As we begin the pre-blast survey we need to decide on the number of holes needed for production and a detailed highwall inspection. The survey consists of checking the highwall and placement of barrie

    Jan 1, 1996

  • SME-ICGCM
    Highwall Stability Implications from Longwall Mining at Broadmeadow Mine

    By Bob Coutts, Matt Martin, Dan Lynch, Dan Payne

    "The Broadmeadow punch longwall coal mine in Central Queensland Australia has experienced significant highwall movement associated with the effect of longwall subsidence when the longwalls approach th

    Jan 1, 2018

  • SME-ICGCM
    Highwall Stability in an Open Pit Stone Operation

    By Chris Kelly

    The Monroe County Quarry is an open pit granite quarry located near the town of Bolingbroke. Monroe County. Georgia. The quarry has been in continuous operation for approximately 10 years. The quarry

    Jan 1, 2002

  • SME
    Highwall Stability In Open-Pit Coal Mines, Western Powder River Basin, Wyoming And Montana

    By Fitzhugh T. Lee

    Results from the first part of a two-part investigation of the stability of highwalls in open-pit coal mines in the Paleocene Fort Union Formation of the western Powder River Basin of Wyoming and Mont

    Jan 1, 1977

  • AUSIMM
    Highwall Trench Mining as a Primary Production Method of Coal Extraction

    Oaky Creek Coal (OCC) has embarked on an ambitious program to fast track the introduction of Trench Mining into its current mining operations. The project has the capacity to allow the extraction of r

    Jan 1, 1992

  • AUSIMM
    Highwall Trench Mining Research: Implications for Mine Planning

    Results from current NERDDC funded research into the geotechnology of highwall trench mining methods have clear implications for mine planners in the areas of blast design, trench shape, location of t

    Jan 1, 1992

  • ISEE
    Highway Lane Rental Requirement Compromises Blast Site Safety and Security

    By Harry L. Siebert

    A major Arizona highway project is jeopardizing site safety and security because of the lane rental policy. One million cubic yards of rock must be fragmented to provide two additional lanes parallel

    Jan 1, 1997

  • SME
    Hilltop Interceptor Contract G Storage and Conveyance Tunnel Cleveland, Ohio

    By Thomas Sisley, Jozef Zurawski, Richard Switalski

    Hilltop Interceptor Contract G is one of the segments of the wastewater control system in the greater Cleveland area. The tunnel is a relief interceptor constructed by the Northeast Ohio Regional Sew

    Jan 1, 1997

  • SME
    HILTI Powder Actuated Tool Technology And Applications In Us Underground Gassy Mines

    By J. Pinkley

    In June of 2002 Hilti North America received the first MSHA permissible approval for usage of a powder actuated tool device in a gassy mine atmosphere. The purpose of this paper is to discuss the imp

    Jan 1, 2008

  • AUSIMM
    Hilton - The All Electric Mine

    By Todd W, Stone C

    A 3D graphics modelling system has been applied to longhole stope ring design at Z.C. Mines, Broken Hill, NSW. This has been in operation for a four month period (January, 1988). The purpose of th

    Jan 1, 1988

  • SME
    Hindered Settling And Classification Partition Curves

    By C. H. Lee, F. Concha, L. G. Austin, P. T. Luckie

    The Concha-Almendra batch-settling treatment for concentrated suspensions of single-diameter spheres has been modified. This modified version is used in the differential equations of simple batch sett

    Jan 1, 1993

  • SME
    Hindered Settling Concentration and Jigging

    By G. W. Riley, D. E. Pickett

    HINDERED SETTLING CONCENTRATION In the free settling of mineral particles in a liquid, the falling particles are at a distance from each other so that no particle is affected by its neighbor. In hind

    Jan 1, 1985

  • AIME
    Hindered-Settling Classification Of, Feed To Coal-Washing Tables

    By B. M. Bird

    DURING the past four years the experimental work in coal washing carried on by the U. S. Bureau of Mines and the University of Washington has been devoted mainly to the development of special methods

    Jan 1, 1928

  • SME
    Hindsight Is 20/20?Reverse Engineering Tunnel Risk Analyses

    By Lee W. Abramson

    Performing risk analyses on tunnel projects has become common place and on many projects it is required from an owner or regulatory perspective. After the project is planned, designed and constructed,

  • CIM
    Hire First, Train Latter - What the world needs. Clean, reliable energy.

    By Sean Junor

    Cameco Corporation ?One of the world?s largest producers of uranium ?Operations in Saskatchewan, Ontario, the United States and Kazakhstan ?Development projects in Australia ?One of the best em

    May 1, 2010