Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Microseismic Monitoring of Mountain Bumps and Bounces: A Case Study

    By J. L. Condon

    The Bureau of Mines, through in-house and contract research, monitored mountain bump-prone areas of the Olga #2 Mine, near Welch, WV, using microseismic techniques for 15 months during 1985 and 1986.

    Jan 1, 1987

  • SME-ICGCM
    Roof Sounding Device - A Loose Rock Detector

    By Richard C. Repsher

    The U.S. Bureau of Mines has developed a method and device designed to detect lose rock material in underground mines. The technology is designed to be an aid to mine workers in detecting hazardous ro

    Jan 1, 1990

  • SME-ICGCM
    Constraint Is The Prime Variable In Pillar Strength

    By Clarence O. Babcock

    Since Vicat in 1833, the width to height ratio of a mine pillar has been taken as the fundamental variable in pillar design. From work in the laboratory by many investigators testing rock, Coal and co

    Jan 1, 1984

  • SME-ICGCM
    Field Test with Strain-gauged Friction Bolts at the Gold Hunter Mine, Mullan, Idaho, USA (f62ddf9f-aabd-4681-8d92-4a50602e035c)

    By Jeffrey Johnson

    To measure the loading behavior of friction bolts, researchers at the Spokane Research Laboratory of the National Institute for Occupational Safety and Health (NIOSH) installed strain gauges on the in

    Jan 1, 2003

  • SME-ICGCM
    Gateroad Pillar Extraction Experience at Jim Walter Resources

    By Gregory Hendon

    Jim Walter Resources, Inc. (JWR), has successfully longwall mined for many years at depths ranging from 1200'-2500'. However, full pillar extraction has proven difficult and generally econom

    Jan 1, 1998

  • SME-ICGCM
    Numerical Modeling of Standing Support Performance in Entries between Longwall Gobs

    By Benjamin Mirabile

    "Current and emerging practices to ventilate longwall gobs are prompting increased design and analysis of standing support requirements related to longwall mining. Specifically, additional design meth

    Jan 1, 2015

  • SME-ICGCM
    Numerical Simulation of Overburden and Surface Movements for Wongawilli Strip Pillar Mining

    By Guo Wenbing

    "INTRODUCTIONThere is a great amount of coal (about 140 billions tons) left unmined under the surface structures, water bodies, railways (referred to as the “three-body”). Coal mining under “threebody

    Jan 1, 2015

  • SME-ICGCM
    Stability of a Gateroad Used Simultaneously for Two Retreating Longwall Faces

    By Stanislaw Prusek

    In this paper, results of underground measurements conducted in gateroad 3, seam 615, at the Bobrek-Centrum Colliery are presented. The Bobrek-Centrum Colliery is owned by Kompania Weglowa, the larges

    Jan 1, 2014

  • SME-ICGCM
    A Comparison Of Support Reactions To Retreat Longwall Front Abutment For Two Different Gateroad Support Techniques

    By Gary R. Corbett

    The federally owned Cape Breton Development Corporation (CBDC) mines approximately 2.5-3.0 Mt of coal per annum from its Phalen Colliery. As part of an ongoing process to become more commercially viab

    Jan 1, 1993

  • SME-ICGCM
    Modern Shield Technology: Better Than Ever But Still Not Perfect

    By Thomas M. Barczak

    A survey of the longwall industry was conducted to examine the performance of modern shield technology. The results of this survey indicate that state-of-the-art shields perform better and last longer

    Jan 1, 1999

  • SME-ICGCM
    Analysis of Extensometer Data from a Room Widening Experiment Designed to Induce a Roof Fall

    By Dennis R. Dolinar

    Roof falls, even of supported roof, still constitute a major hazard in underground mines. However, associated with any fall or instability is a pattern of roof movement. Therefore, the National Instit

    Jan 1, 1997

  • SME-ICGCM
    Ground Response As a Longwall Advances Into a Backfilled Recovery Room under Low Cover

    By David F. Gearhart

    A cooperative study was conducted between Signal Peak Energy and the National Institute for Occupational Safety and Health (NIOSH) to evaluate the behavior of a pre-driven recovery room under less tha

    Jan 1, 2014

  • SME-ICGCM
    The Role Of Engineering And Geology In Analyzing Ground Control Conditions

    By David A. Newman

    Severe roof control problems have plagued a West Virginia underground mine since its initial development in the late 1970's. Adverse roof conditions in the Eastern portion of the reserve result f

    Jan 1, 1999

  • SME-ICGCM
    The Utilization Of Rockbolting Technology And Monitoring Techniques In The German Coal Fields

    By Thomas Lautsch

    After a short description of geology and gateroad roof support technology in the German coalfields the development of roof bolting as primary roof support is presented. Based on geotechnical parame

    Jan 1, 2000

  • SME-ICGCM
    Numerical Modeling of the Gob Loading Mechanism in Longwall Coal Mines

    By Khaled Morsy

    Longwall mining is one of the most widely practiced underground coal mining method. The behavior of the longwall gob is very critical in the understanding of the complex ground response to longwall mi

    Jan 1, 2002

  • SME-ICGCM
    Investigating the Contributing Factors to Rib Fatalities Through Historical Analysis

    By Tristan H. Jones

    Rib-related accidents in underground coal mines continue to cause injuries and take lives at a rate of 1.3 fatalities per year for the last 17 years. Prevention of these accidents cannot simply be a m

    Jan 1, 2014

  • SME-ICGCM
    Development and Application of Impact-Resistant Lagging for Steel Sets Installed at Underground Roof Fall Areas

    By Kevin Jinrong Ma

    Underground mines often experience roof falls in entries, crosscuts, and intersections of active mining sections, main travel ways, and belt entries. Roof fall heights greater than 20 ft (6 m) make re

    Jan 1, 2011

  • SME-ICGCM
    Design Optimization of Longwall Chain Pillars

    By Behdeen Oraee, Amirhossein Bangian, Kazem Oraee

    "Determination of the optimum design of chain pillars has a significant effect on the economics and safety of longwall operations. Most pillar design formulae are based on empirical methods and supple

    Jan 1, 2010

  • SME-ICGCM
    Gateroads Layout and Entry Support in a Western Longwall Coal Mine in China

    By WenFeng Li

    Comparing to the coal seams in Eastern China, the coal seams in Western China usually have better geological conditions. Therefore, changes in the conventional gateroads layout are required for the We

    Jan 1, 2013

  • SME-ICGCM
    Cemented Coal Gangue-Fly Ash Backfill Technique

    By Baogui Yang, Jie Yang, Anthony Iannacchione

    "The cemented coal gangue-fly ash backfill technique (CGFB) has commonly been used to control subsidence damage caused by underground coal mining. This paper discusses the CGFB backfilling process use

    Jan 1, 2018