A Probabilistic Approach to Water Balance Analyses for Tailings DamsBy Kenneth L. Myers
The net balance of the inflow and outflow of water in a tailings storage facility has major economic implications in any large mining and milling operation. In a net precipitation environment it can c
Jan 1, 1992
-
Geotechnical/Geoenvironmental Planning Issues For Tunneling Projects In Urban SettingsBy David E. Thompson, Daniel J. Dobbels
INTRODUCTION The planning process for projects requiring construction of tunnels in urban environments can be highly complex and involves interaction with professionals of many disciplines. Typical
Jan 1, 1991
-
Use Of Cil Process For Gold Recovery From Flotation ConcentrateBy G. I. Voiloshnikov, A. F. Panchenko, N. S. Voiloshnikova
Low world gold prices stimulate development and introduction of economically efficient ( cost saving) technology for operating gold mills. This report covers the results of testing and introduction of
Jan 1, 1999
-
Banner year for coal production shadowed by year-end oversupplyBy J. Hoover
Real growth in the economy, increasing demand for electricity, and consumer stockpiling for a possible United Mineworkers of America (UMW) strike in October made 1984 a banner year for coal. Productio
Jan 5, 1985
-
Novel Method for the Production of Fine-Grained Tungsten CarbideBy C. D. Anderson
"IntroductionTungsten carbide is a valuable material used in a variety of different applications, including the manufacturing of cutting tools, bearings and as a cost-efficient alternative to industri
Jan 1, 2015
-
Social And Economic Feasibility Analysis For Uses Of Underground SpaceBy Richard M. Michaels
In considering the use of underground space for civil works functions, there are several criteria that must be met if transfer of any of them is to occur. It is important to recognize that these crite
Jan 1, 1974
-
Precast Concrete Segment Lining For Buckskin Mountains Water Conveyance TunnelBy William R. Groseclose, Kenneth D. Schoeman
The Buckskin Mountains Tunnel is a key link in the Bureau of Reclamation's Central Arizona Project. The 22-foot (6.7-m) diameter tunnel is being bored in a north-northwesterly direction through v
Jan 1, 1976
-
A Methodology for Design and Simulation of Mine Ventilation NetworksBy Pedro Marques Bernardo, Carlos Dinis da Gama
This paper presents a methodology for design and simulation of underground ventilation networks, based on the analysis of real situations, followed by the careful interpretation of the obtained result
Jan 1, 1997
-
A Two-Dimensional Computer-Modeling Approach for Narrow-Vein DepositsBy Anthony D. Hammond
INTRODUCTION A two-dimensional approach for modeling narrow-vein deposits using the TECHBASE® software was implemented at Sunshine Mining for its use in the evaluation of mineral properties. This 2
Jan 1, 1998
-
Mathematical Modelling For Gas Concentration Transients In Controlled Flow RecirculationBy Gemei Yang, Pierre Mousset-Jones, Felipe Calizaya, Malcolm J. McPherson
Laboratory tests on controlled airflow recirculation have shown the development of transient states in response to changes in system prevailing conditions such as those generated by a sudden start-up
Jan 1, 1989
-
AC Variable Frequency Drive Application Considerations for Mining Belt ConveyorsBy S. A. Matthews, M. L. Nave
AC variable frequency motor drives are emerging technology for belt conveyors. The success of the application in mining depends on adequate and timely consideration of drive, motor, and conveyor featu
Jan 1, 1998
-
4. Pit Limit Design Technique For A Highly Irregular DepositBy C. Douglas Lee
This case study describes the work done at the University of Arizona on the development of a computer mine model for an irregularly shaped and spotty ore deposit. The purpose of the work was to develo
Jan 1, 1979
-
Numerical Simulation For Mine Dewatering In An Opencast Coal MineBy H. Huang, J. C. Wu, C. H. Xie, Y. Q. Xue, Z. H. Zhang
Two- and three-dimensional groundwater flow models for dewatering in an opencast mine are presented. The models focus on solving special problems using numerical simulations of the opencast mine. Thes
Jan 1, 1998
-
Size Reduction/Mineral Liberation Simulation For A Magnetic Taconite ConcentratorBy R. L. Wiegel
Several mineral process modeling and simulation packages are currently available for use in evaluating the performance of alternative process flow schemes. A critical link that has been missing from t
Jan 1, 2003
-
Rock Deformations and Stresses in Reinforcement for Large Rock CavernsBy Tzou-Shin Ueng
Rock reinforcement of rock anchors and rock bolts are commonly used for the support of large rock caverns. The rocks at the location of most large underground openings are usually under very high init
Jan 1, 1986
-
Preprint 68F41 ? AbstractA significant technological development is discussed for the processing of certain problem power plant flyashes which contain a high water soluble mineral content and which are known to yield inferior
Jan 1, 1968
-
Ventilation Design Alternatives for Underground Placer Mines in the ArcticBy Michael G. Nelson, Hanguang Wu, V. Izaxon, Sukumar Bandopadhyay
The method of mine ventilation involving heated air, which is frequently used in mines in cold regions, does not correspond to the natural conditions prevailing in permafrost regions; it is not econom
Jan 1, 1997
-
Optimising The Ammonia-cyanide Leaching Process For Copper-gold OresBy David Muir, Slobodanka Vukcevic
Gold is commonly associated with copper minerals, particularly in the more geologically recent rocks of Northern Australia, Chile and the Pacific Rim. Traditionally, oxidised copper-gold ores are sel
Jan 1, 1995
-
Design and Construction Considerations for Intersecting Tunnels—Charleston, SC - RETC2021By Lindsey Schneider, Steve Kirk, Michael Miglioretti, Jeffrey P. Kolzow, Kyle White
The US17 Spring/Fishburne Drainage Improvements Project utilizes a stormwater conveyance tunnel system of approximately 8,250 LF. The tunnel system includes two intersecting tunnels of differing diame
Jun 13, 2021
-
Geotechnical Evaluation For the Design and Construction of Mine ProjectsBy Trevor A. Moss
Installation of equipment and structures at mines often requires mine planners to evaluate unique loading and operating conditions. Consideration of these unusual features is required throughout desig