Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Ore Waste Classification Of A Lead Zinc Deposit Using Support Vector Machine

    The objective of this study is to classify ore and waste in a selected mine. The support vector machine, was used for the classification purpose, is applied to a zinc ore body in a skarn deposit locat

    Jan 1, 2008

  • SME
    Development and Construction Begins at East Kemptville, North America’s Only Primary Tin Mine

    By J. E. Moyle

    Introduction In October 1983, Rio Algom Ltd. decided to develop the East Kemptville tin deposit. This decision was the result of intensive geological and metallurgical evaluation work, as well as car

    Jan 4, 1984

  • SME
    Alligator Ridge: From a Lone Prospector’s Discovery to an Operating Gold Mine

    By Warren D. Stanford

    The Alligator Ridge mine is a near-surface gold mine located in a remote area 113 km (70 miles) northwest of Ely, NV. The deposit was discovered in 1976 by a lone prospector working under a grubstake

    Jan 6, 1984

  • SME
    Progress report on Cominco’s Red Dog project in Alaska, second largest zinc deposit ever discovered

    By H. M. Giegerich

    About Cominco Only the original Broken Hill zinc deposit in Australia is larger than Cominco's Red Dog deposit. Indeed, the third largest zinc deposit in the world is Cominco's own Sullivan

    Jan 12, 1986

  • SME
    The Jena Mines Experience - Modernization And Upgrading Of A Traditional Zimbabwe Gold Mine

    By Peter C. Busse, Henry M. Giegerich, Ronald K. Netolitzky

    Zimbabwe The Republic of Zimbabwe is situated in south central Africa and north of the Tropic of Capricorn. The country is land-locked, bounded on the north by Zambia, on the south by the Republic of

    Jan 1, 1996

  • SME
    Distant Adventures

    After the war that was nearing an end In early 1945, regular consulting work for Bralorne, the Bradleys, Pennsalt Chemical Co., and a directorship and occasional consulting for Homestake Mining Co. ma

    Jan 1, 1976

  • SME
    The Reconstruction Of The Main Interceptor Sewer Lower Bristol Road, Bath

    By Arthur F. Moss

    Smallbore tunnels in urban environments often present more technical and managerial problems than major large diameter schemes carried out for transportion, water supply and hydro-electric facilities.

    Jan 1, 1981

  • SME
    Bridging Theory And Practice In Iron Ore Flotation

    Iron ores may be upgraded by flotation of iron oxides or siliceous gangue using either cationic or anionic collectors. The electrostatic mechanism of adsorption can account for the complex chemistry i

    Jan 1, 1989

  • SME
    Options To Revegetate Neutralized Heap Leach Material

    By Leslie M. Burnside, Gene E. McClelland, Roy R. Cellan

    Revegetation of neutralized heap leach material in the arid environment of the Great Basin represents a challenge of avail­able technology. The chemical and physical environment of spent and neutraliz

    Jan 1, 1998

  • SME
    Analysis Of Controlled District Recirculation Systems

    By Y. J. Wang

    The use of controlled recirculation began in the early 1930s. Although this method has been applied in many mines since then, a generalized comprehensive network analysis is still lacking. This paper

    Jan 1, 1997

  • SME
    Reagents Design and Molecular Recognition at Mineral Surfaces

    By Pradip

    The development of highly selective mineral processing reagents, which are not merely metal-ion specific, but specific to the particular mineral surface structure, is essential for the exploitation of

    Jan 1, 1994

  • SME
    A Comparison Of Laboratory- And Commercial-Scale Coal Froth Flotation Using Models Of Rate And Residence Time

    By B. J. Arnold, F. F. Aplan

    A model incorporating rate and residence time to describe the froth flotation process was used to provide data for the evaluation of various kinetic flotation models and to provide scale-up informatio

    Jan 1, 1989

  • SME
    Maximizing the processing of polymetallic concentrates via actinide separation and rare earth retrieval

    By Mona M. Fawzy, Ahmed A. Eliwa, Ebrahim A. Gawad, Ahmed H. Orabi, Amal E. Mubark

    The growing demand for rare earth elements (REEs) has led to numerous recent studies to recover these elements from various bearing ores and wastes. Therefore, the recovery of REEs from Ras Baroud pol

    Oct 1, 2024

  • SME
    The “Big Picture” Approach to Surface Mining

    By L. Widdifield, R. Riggle

    "In today’s challenging mining environment the “Big Picture” (Caterpillar, 2013) approach to mining is often neglected. With haulage costs approaching up to 45 % of the overall mining costs, all too o

    Jan 1, 2016

  • SME
    3D-Canvent: An Interactive Mine Ventilation Simulator

    By Stephen G. Hardcastle

    3D-CANVENT is a software package that integrates advanced computer aided design (ACRD) true 3D graphics with a mine ventilation simulator. The package runs as a Windows(tm) application to access its

    Jan 1, 1995

  • SME
    Meikle Mine Backfill System -A Case History

    By Lauren M. Roberts, Ralph R. Sacrison

    The Meikle Mine uses long-hole open stoping and cut-and-fill methods with backfill as the primary ground support technique. The mine operates at 2,858 tonnes per day (3,150 tpd) and has sustained oper

    Jan 1, 2001

  • SME
    Underground Mining: Self-Supported Methods

    By Christopher Haycocks

    Self-supporting, open stoping underground mining methods are some of the earliest, starting with the prehistoric flint mines of Europe and the Egyptian gold mines of Nubia in the time of the pharaohs.

    Jan 1, 2008

  • SME
    MINSIM - The MINe SIMulator

    By Jaril B. Lavrencic

    The unique and irregulator distribution of working places in a mine always poses the two questions: - which and how much production equipment is to be used, - what production can be expected.

    Jan 1, 1989

  • SME
    South Mountain Water Facilities–Reach 3B

    By Mark R. Rybak, James Delmonte, Travis Hartman

    The City of Phoenix, Arizona designed a 7.2 km (4.5 mi) long water transmission main from the South Mountain Reservoir to the Ahwatukee Foothills Reservoir to address the growing demand for drinking w

    Jan 1, 2003

  • SME
    GCM Hydrocopper Process Update - Silver Recovery from Copper Chloride Solutions

    By Kenneth B. DeGraaf

    The development of precious metal recovery processes using chloride systems has mostly evolved from the development of chloride based treatments for base metal concentrates or ores. The recovery of si

    Jan 1, 1990