Challenges and Lessons Learned from the Kentucky Lock ProjectBy K. Best, D. Conn
The US Army Corps of Engineers KY Lock Project in western Kentucky presented the blasters and vibration consultants with a set of unique challenges. The blasters on this project were faced with diffic
Jan 1, 2024
-
Blast Design Analysis for Reduction of Boulders ProductionBy Michael Karmis, Syed Muhammad Tariq, Zeshan Hyder
This paper analyzes the blast design for lime stone quarries of two major cement plants in Pakistan. The production blast of these quarries was resulting in excessive boulders production. At some inst
Jan 1, 2012
-
A New Method for Blasting Seismic Signals ProcessingBy Yu Yalun, He Jun
Wavelet Analysis is very effective for processing the high-varying signals by its good localization properties. We studied its feasibility of application in the field of blasting seismic signals proce
Jan 1, 1997
-
Kuz-Ram Equation Analysis: A Reparametrization for the Peruvian CaseBy Dennys Huaman, Carlos Rojas
Using the Levenberg-Marquardt algorithm to reparametrize the Kuz-Ram original model equation of the mean characteristic size and assess the errors of both models and their comparisson using different
Feb 1, 2020
-
In-Situ Rock Strength Determination for Blasting PurposesBy Ashwani Jain, D K. Soni
Compressive strength of rocks is often required by mining engineers and quarrying authorities for blasting operations. Uniaxial compressive strength of rocks can be predicted with reasonable accuracy
Jan 1, 1994
-
A Linear Shape Charge System for Contour BlastingBy Finn Ouchterlony, Gert Bjarnholt, Robert Holmberg
A system for contour blasting with a linear shape charge principle has been studied /10/. In one operation the charge creates two notches along the bore hole wall and breaks the rock mass. The built i
Jan 1, 1983
-
Non-Ideal Blasting for Ideal Grinding - Part TwoBy Jack Eloranta
Building on previous work, this paper expands the template for modeling the economic relationship between blasting and grinding. The actual efficacy of various blasting enhancements is not addressed,
Jan 1, 2014
-
A Multiple Deck Burn Round for Shaft SinkingBy Thomas L. Barkley
This paper describes an unusual design for a 12 foot diameter, 30 foot deep circular shaft shot in a close in urban environment less than 100 feet from occupied structures. It uses diagrams, video foo
Jan 1, 1994
-
Improving Quarry Production Rates by Reducing Bucket Fill TimeBy Elliott Giles
"Measuring a blast’s performance based on the bucket fill time or “diggability” has always been achallenge due to the subjectivity generally involved. The diggability of a blast is often based onopini
Jan 1, 2016
-
Analysis of Rock Vibrations for Decomposed Tunnel RoundsBy R Mancini, G Borla
This paper analyses the first results of a part of an EEC research project ("Blasting control for underground mining"). This research that involves three universities (Paris, Torino and Leoben) has be
Jan 1, 1995
-
Metafex Composites: Safe, Energetic, Economical Replacements for ExplosivesBy David Davison, Richard Johnson
Metal-oxidant blends are ordinarily unsuitable as diiect replacements for explosives, because the reaction occurs too slowly. Oxide coatings protect metals, preventing or delaying reaction. By contras
Jan 1, 1999
-
Exploring the effectiveness of explosives for avalanche controlBy Josephine Bones, Robb Larson, Daniel Miler
Avalanches are commonly mitigated through the use of explosives at ski resorts and above transportation corridors. Surprisingly, very little research has been conducted on snowpack response to explosi
Jan 1, 2012
-
Geologic Data for Blasting at the Minntac MineBy John Eloranta
This paper is a case study showing the assembly of available rock property parameters for the purpose of blast design. Blast optimization now includes subsequent milling and requires a full knowledge
Jan 1, 1996
-
Overlapping Timing Analysis for a Single Blast HoleBy Joshua Micah Hoffman, Lifeng Li, Jhon Silva-Castro
Since millisecond detonators were first introduced, at least two variables among others have been more closely considered when timing a mining blast; the accuracy and the precision of the initiation s
Jan 1, 2015
-
The Importance of Internships for Explosives Engineering StudentsBy Paul Worsey, Gillian Worsey
The explosives industry is about to reach a critical turning point in human resources. The average age of employees of the largest US explosives company is over 50 and an estimated 5,000 engineers are
Jan 1, 2014
-
Predictive Modelling for Equipment Blast Exclusion Zone ReductionBy Kim Henley, Chris Batten
This paper discusses the use of the Orica WildFireTM flyrock model to help mining operations in Australia and Asia minimise blast exclusion zones for equipment, increasing utilisation and productivity
Feb 1, 2020
-
Automatic 3D Fragmentation Analysis from Drone ImageryBy Andreas Gaich
A new 3D fragmentation analysis method for muck piles is presented. It works with aerial imagery from UAVs (drones) and handles entire muck piles with minimum user intervention.
Feb 1, 2020
-
Digital Energy Control - A New Tool for BlastingBy Andrew Stirling
Quarry operators are under constant scrutiny by individual neighbors and neighborhood associations due to the environmental issues arising from daily quarry operations. Issues range from truck traffic
Jan 1, 2002
-
Regression Model for Surface Vibrations from Underground OperationsBy Tristan Worsey, Nathan Rouse, Daykin Schnell
The authors were retained by a proposed underground metals mine operation to evaluate the potential blast vibration amplitudes that could be generated at surface structures above the proposed mine. Li
-
Ground Preparation Planning for Surface Mine Excavating PracticeBy Malcolm Scoble
The estimation of digging, ripping and blasting requirements in advance of mine production is a difficult task. The characteristics of the superficials and rock mass govern the type and intensity of g
Jan 1, 1985