Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Comparison of Structure Response to Hard and Soft Rock Blasting

    By C. T. Aimone-Martin, V. L. Rosenhaim

    The response of two structures to blast-induced ground vibrations were evaluated and compared in order to quantify the impact of different blasting operations, hard rock and soft rock blasting, upon t

    Jan 1, 2015

  • ISEE
    Automation of Drill and Blast - Measurement Techniques to Develop Standard Procedures (a3ef629c-b178-4045-bc88-d04c273fd2c0)

    By Ewan Selers, Gary Cavanough

    Drilling automation technology is well advanced and automated drill rigs are in use at a number of operating mines. This is not the case for the other drill and blast processes due to significant tech

    Jan 1, 2016

  • ISEE
    Journal:Security Matters / Procedures to Follow When Explosives Are Missing From Inventory (e.g., Disposition Unrecorded/Unknown)

    Prepare ATF Report of Theft or Loss (ATF Form 5400.5). A Report of Theft or Loss - Explosives Materials must be prepared when it is discovered that explosive materials are missing from inventory. Subm

    Jan 1, 2008

  • ISEE
    ApplicationofArcGISProinBlast-InducedGroundVibrationAnalysisinanOpenPit CopperMine

    By Yong Pan, Purushotham Tukkaraja

    It has been well understood that blasting is the cost-effective method for breaking rocks as compared with the mechanical systems. However, vibrations induced by blasting in open-pit mines could pose

    Jan 1, 2019

  • ISEE
    Coupled Rock Motion and Gas Flow Modeling in Blasting

    By Steven D. Knudsen, Dale S. Preece

    The spherical element computer code DMC (Distinct Motion Code) used to model rock motion resulting from blasting has been enhanced to allow routine computer simulations of bench blasting. The enhancem

    Jan 1, 1992

  • ISEE
    A Comprehensive Blast Damage Control Plan for The Missing Link

    By Alvin D. Christmas

    The missing link is a connector between the congested downtown area of Knoxville, Tennessee adjacent to the former World's Fair site, the I_40 I_75, and Western Avenue traffic arteries. This connecter

    Jan 1, 1995

  • ISEE
    Municipal Blasting: Blast Design, Vibration Monitoring & Control

    By Frank Lucca

    This paper includes research and investigation into blast design and blast optimization for vibration control in municipal and tight blasting situations, where specifications were extremely stringent.

    Jan 1, 2004

  • ISEE
    Track and Trace in Europe and Worldwide, the Beginning, the Present and in the Future

    By Frank Hirthammer

    Since the introduction of the Explosives Track & Trace in Europe in 2014 for manufacturers and 2015 for end-users, a lot has changed in all areas of the supply chain and the use of explosives. The reg

    Feb 1, 2020

  • ISEE
    Track and Trace in Europe and Worldwide, the Beginning, the Present and in the Future

    By Frank Hirthammer

    Since the introduction of the Explosives Track & Trace in Europe in 2014 for manufacturers and 2015 for end-users, a lot has changed in all areas of the supply chain and the use of explosives. The reg

  • ISEE
    Journal: Kaiser Plant Demolition / Smokestack Demolition at port of Tacoma, Washington

    By Walt Meglasson

    The Kaiser Aluminum Company Smelter, one of several in the Pacific Northwest, was built in 1942 and operated by the Olin Company during World War II and then purchased by Kaiser Aluminum after the war

    Jan 1, 2008

  • ISEE
    Journal: 100 Years / Arms & Explosives London October, 1909

    By Robert Hopler

    Testing Stations Abroad At the Seventh International Congress of Applied Chemistry, Drs. Mente and Will communicated a paper on the above subject. All large coal-getting countries employ testing stati

    Jan 1, 2010

  • ISEE
    Tunneling in Thinly Foliated Rockmass Conditions

    By G. C. Naveen

    Punatsangchu Hydroelectric Project Authority is constructing 1020 MW underground hydroelectric project in Bhutan. The project envisages construction of concrete dam, Desilting Chamber, Head Race Tunne

  • ISEE
    Evaluation of Emergent Electronic Detonators and Modern Non-Electric Shocktube Detonators Accuracy

    By J Silva Castro, W C. Wedding, B T. Lusk, J Calnan, E G. Morris

    The emergence of electronic detonators for use in production mine blasting has enabled mining professionals to rethink the traditional blast design methodologies that pertain to timing. In many ways,

    Jan 1, 2012

  • ISEE
    Removing Booster Influences from Toxic Fumes

    By Michael S. Wieland

    "This report investigates whether it is tractable and thereupon reasonable to remove the boosterinfluences when ranking the toxic fumes of non-cap-sensitive mining explosives. The hazard potential is

    Jan 1, 1999

  • ISEE
    Kanalku Falls Blasting for Fish Habitat Improvement in Alaska

    By Catherine T. Aimone-Martin, Kristen Kolden

    In August of 2013 the USDA Forest Service (USFS) blasted bedrock at the base of a waterfall in Kanalku Creek within the Kootznoowoo Wilderness Area on Admiralty Island in the Tongass National Forest l

    Jan 1, 2015

  • ISEE
    Burden Profiling: Do You Measure What You Think You Do?

    By Greg Shapiro, Paul Dr. Worsey

    Mining, quarry, and construction blasts are becoming more and more dependent on bench profiling. The use of accurate profiling gives the blaster better data for the most efficient blast results. So,

    Jan 1, 2019

  • ISEE
    Snap, Slap & Shoot - A Possible Cause for Premature Ignition of Shock Tube

    By Roger Holmberg, Dick Salomonsson

    Nitro Nobel (the company was acquired by Dyno Nobel in 1986) originally developed non-electric initiation systems. These system were based on the 1967 invention of the shock tube fuse by Per-Anders Pe

    Jan 1, 2002

  • ISEE
    Rebuild of a Flash Smelting Furnace Using Explosives

    By Scott G. Giltner, Terry Millar, Ben Bringhurst

    "Kennecott Utah Copper (KUC) Smelter scheduled a rebuild of their flash smelting furnace forSeptember, 2014. KUC’s goal in this project was to reduce the rebuild time from 65 to 55 days by using explo

    Jan 1, 2016

  • ISEE
    Blasting 1.5 T of Dynamite, Hang up on a Cliff, 125 m Above a Hydroelectric Power Plant

    By Thierry Bernard, Philippe Dozohne

    May 13th, in the back country of Nice @arice) collapsed a complete piece of mountain, cutting the RN 2085 and destroying a part of Valabfre’s viaduct. The fist inspections of the site showed that mate

    Jan 1, 2001

  • ISEE
    Journal: 100 Years / Illinois Powder Manufacturing Company Catalog issued May 1, 1909

    By Robert Hopler

    RBH Note: The Illinois Powder Manufacturing Company was established in 1907 and was acquired in 1957 by American Cyanamid. The latter company left the explosives business in 1969.

    Jan 1, 2010