Pile Test Results - 1-15 Corridor Reconstruction Project, Salt Lake City, Utah (Abstract Only) - DFI Member Conference - Seattle, 1998By D. M. Holloway
As a part of the 1-15 Reconstruction Project, static and dynamic (high-strain) testing methods formed the basis to estimate long-term axial capacities, and to assess the magnitudes of bearing capacity
Jan 1, 1998
-
SIMBAT Dynamic Pile Testing - Results of an Independent Pile Capacity' Prediction EventBy Richard T. Stain
"In 2001, a pile trial site was established at Limelette in Belgium consisting of 25 displacement screw piles and 5 driven pre-cast piles. Interested parties were invited to participate in a pile pred
Jan 1, 2005
-
Design and Delivery of Micropile Installation Leveraging Augmented and Virtual RealityBy Guilherme L. M. G. Carvalho, Zachary T. Fleming
In a world of 2-dimensional design documents, envisioning and understanding 3-dimensional interferences for complex foundation construction scenarios can be challenging. Videos and computer models ser
Jan 1, 2019
-
8000 Series Piling RigBy Roger A. Bullivant
The introduction of this size and type of piling rig is intended to address a multipurpose foundation activity. The 8000 denotes the size of equipment that is attached to the mast, namely 8000 Kg. Lar
Jan 1, 1995
-
House & Commercial Building Foundation - Introduction & HistoryBy Roger A. Bullivant
As the UK's foremost domestic foundation underpinning contractor over the last 25 years it has become abundantly clear that the size of the repair market, some £500m per annum is a significant wa
Jan 1, 1995
-
Design, Construction, And Testing Of A Precast UHPC PileBy Thomas L. Vande Voort
The strategic plan for bridge engineering issued by AASHTO in 2005 identified extending the service life and optimizing structural systems of bridges in the United States as two grand challenges in br
Jan 1, 2008
-
Measurements of CDSM Strengths and Seepage Data Following Seismic Upgrades of San Pablo DamBy Atta B. Yiadom, A. David Miller, Robert C. Kirby, Sean M. Todaro
"San Pablo Dam is a 170-foot (52-meter)-high earthfill embankment, located approximately 10 miles (16 kilometers) north of downtown Oakland, California, that impounds a 38,600 acre-feet (47.6 million
Jan 1, 2015
-
Countermeasures Against Soil Liquefaction At Galataport Project In Istanbul, TurkeyBy Carlandrea Albonico, Salvatore Miranda
The paper describes an innovative geotechnical engineering solution that has been provided within the scope of the Galataport Project, in Istanbul, Turkey. Among all interesting geotechnical works inc
Nov 1, 2022
-
Advances In Marine Piling Techniques And New Age Piling MaterialsBy D. Cantali
This paper will be presented in two parts. The first part will present the latest advancements in pile installation techniques using state-of-the-art press-in piling technology by Giken. By pressing i
Nov 1, 2022
-
Use of a Reinforced Jet Grout Excavation Support System for a Major Sewer Line RepairBy Richard Brink, Eric M. Klein, Kenneth B. Andromalos
"A portion of the roof for a 129 x 144-inch, nearly 100-year-old sewer outfall in the City of Baltimore had deteriorated to the point that it resulted in the development of a large sinkhole in a resid
Jan 1, 2005
-
-
Augered Cast-In-Place Piles - Friday, May 5, 2006 - Title ? Table Of Contents - A Historical Perspective On Current Cast-In-Place Piling PracticeBy Willie M. NeSmith
Cast-in-place piling are a staple of the deep foundation industry, and are used (in various forms) worldwide. In assessing the application of cast-in-place piles, it is of value to reflect on the dev
Jan 1, 2006
-
New CIGMAT Downhole Penetrometer (DHP-CIGMAT) for Use During Drilled Shaft Construction (7493fc91-7396-4eac-bed2-0406570252cc)By Omer F. Usluogullari, C. Vipulanandan
"It is critical to monitor the ground conditions during excavation and drilling of boreholes during construction to identify possible changes in the soil and rock formations. Drilled shafts are increa
Jan 1, 2017
-
Deep Excavation Support – Shangri-La – TorontoBy Brian Isherwood, Tara Brown, Paul Kreycir, Jenny Earle
"The Shangri-La hotel and luxury condominium tower, recently opened on University Avenue in downtown Toronto, required eight levels of underground structure, four extending into the shale bedrock.Ishe
Jan 1, 2015
-
Design Solutions for Seepage End-Around-Effects at Cutoff Wall Depth TransitionsBy Michael Hughes, Selva Selvamohan, Ray Costa
"Cutoff walls are commonly used to mitigate underseepage problems for levee remediation projects. At abrupt changes in seepage cutoff wall depths there is a potential for water to flow around the back
Jan 1, 2015
-
Strain Gauge Interpretation Using Automated Collection Systems and the Accuracy of Using Extrapolated Modulus vs Constant Modulus of a Pile, Along With the Importance of a Detailed QA/QC ProgramBy Michael A. McNicholas
"Deep foundations utilize the varying soil conditions to provide the most cost-effective or practical scope for a given jobsite. Once the scope has been determined and the engineering applied, the ele
Jan 1, 2017
-
Case Study: Load Transfer Analysis on an Instrumented Augercast Pile Using EDC Strain Gauges and Geokon Rebar StrainmetersBy Sastry Putcha, Santosh Mummaneni, Swamy Avasarala, Vamshi Vemula
"This paper presents the results from a case study on the comparison of two strain acquisition instrumentation technologies, Geokon rebar strainmeters and Embedded Data Collectors (EDC) for the DC Wat
Jan 1, 1900
-
Laterally Loaded Caissons for Ontario College of Art & DesignBy William F. Starke
"The Ontario College of Art & Design (OCAD) located in Toronto, Ontario, found itself in dire need of space due to increased enrollment, leading them to embark on a major expansion and redevelopment o
Jan 1, 2004
-
Presentation #2 - Non-Destructive Testing For Drilled Shafts - ContentsBy Frank Rausche
Introduction and Background Testing -Pile Preparation -Data Processing -Data Interpretation/Case Studies Case Studies - Existing Piles Stories from around the world
Jan 1, 2001
-
Slope Repairs in a Tight Footprint: Slope Stabilization Using Multiple TechnologiesBy Dan Mahrt
"In June of 2009, a slope failure occurred along River Road in Bismarck, North Dakota. The slope failure affected approximately 300 feet of River Road with vertical displacements up to 3 feet, resulti
Jan 1, 2016