Recent Experiences With Bi-Directional Static Load TestingBy M. England
Keywords: Bi-directional tests, Osterberg cell, O-cell®, static load tests, Timeset® Static load testing, where loads are applied vertically to the top of the pile and often referred to as 'to
Jan 1, 2006
-
Lateral Load Capacity of Helical Piles in SandBy Balu E. George, Subhadeep Banerjee, Shailesh R. Gandhi
"A three-dimensional analysis of laterally loaded helical piles installed in cohesionless soil is presented. Finite Element Analysis was conducted using commercially available Plaxis 3D AE version, as
Jan 1, 2017
-
Design And Preliminary Investigations For Deep Foundations Of The Charleroi Locks River Wall Project, Monessen, PennsylvaniaBy Brian H. Greene
The U.S. Army Corps of Engineers, Pittsburgh District, is in the final phases of modernizing the locks and dams on the Monongahela River. One facet of this modernization is to replace the existing Lo
Jan 1, 2006
-
Inspector's Manual For Driven Pile Foundations ? IntroductionThis manual provides basic practical instruction on the inspection of driven piles. It covers the essential components of pile driving, such as the pile driving hammer, hammer accessories, the pile an
Jan 1, 1997
-
Optimising the Compressive Behavior of Screw Piles in Sand for Marine Renewable Energy ApplicationsBy Andrew J. Brennan, Jonathan A. Knappett, Lewis Hamilton, Michael J. Brown
"Abstract This paper investigates the compressive behaviour of screw piles in sands and the key design parameters which control this. These types of foundation elements have typically been used as scr
Jan 1, 2014
-
Foundation Design and Construction Challenges with Marsh Deposits in a High Seismic Risk ZoneBy M. Reza Saberi, T. Ted Miyake
Driven piles are a common tool in any engineer’s toolbox for supporting large structures over very soft ground, especially in high seismic risk zones. Challenges include achieving sufficient vertical
Jan 1, 2018
-
Site Management Towards Pile Execution At Qurashiya BridgeBy Emad W. Shublaq
Contractual site plans are implemented for executing pile foundations (5 x 5) at segmental concrete bridge. Project schedule demands have forced the contractor to find out the most economical procedur
Jan 1, 1992
-
Standardizations of Execution and Quality Control on Piling and Deep Mixing MethodBy Masaki Kitazume, Yoshiaki Kikuchi
"Abstract Pile foundation is one of fundamental techniques to improve the bearing capacity and settlement characteristics of superstructures. Wide varieties of piles having various shape, size and mat
Jan 1, 2014
-
Overcoming the Challenges Endured by the Quality Assurance and Quality Control Teams during the Construction of a Deep Cutoff Wall in East Alton, IllinoisBy Raffaella Granata, Wesley Schmutzler, Matteo Bertoni
"The Lower Wood River Levee system, at the confluence of the Wood River Creek and the Mississippi River, in East Alton, Illinois, has been plagued with underground seepage and, in 2010, remediation wa
Jan 1, 2017
-
Evaluation Of Achievable Column Diameter In Jet GroutingBy Chu E. Ho
Key variables that govern the jet cutting process are examined based on fundamental theories of jet hydrodynamics and soil mechanics. Under normal conditions of jet grouting operations, lift speed and
Jan 1, 2006
-
Soil Grouting to Arrest Foundation SettlementBy Anuj K. Singh, Shuvranshu Rout, Manos De
"Foundation for tracks of coke transfer car and dust extraction pipe was designed as series of isolated foundations spaced at 11.0m along length of coke oven battery resting on soil at depth of 2.5m.
Jan 1, 2017
-
Micropile-Supported Wall To Resist Lateral Deflection Of Existing Railroad Bridge AbutmentBy Samer R. Rabab?ah
As part of the PHX Sky TrainTM project at Phoenix Sky Harbor International Airport in Phoenix, Arizona, the existing traffic lanes at the 44th Street underpass below the Union Pacific Railroad (UPRR)
Jan 1, 2011
-
Concrete Overbreak Estimation and Analysis Errors in Bored PilesBy Nuno Cruz
"The concrete overbreak estimation for bored piles provides the quantification of the shaft’s expansion beyond its theoretical volume. There are stability analysis methods that can be employed before
Jan 1, 2017
-
Micropiles in an Urban Setting – TBTA Verrazano Narrows Bridge HOV/BUS Ramps, Brooklyn, NY and Nysdot Kosciuszko Bridge Replacement, Brooklyn, NYBy M. D. Riegel, Brian T. Felber
"Construction of foundation elements in an urban environment is often complicated by multiple constraints such as existing foundations, utility conflicts, maintenance and protection of traffic on high
Jan 1, 2016
-
Cyclic Degradation Of Pile Foundations For Offshore Wind TurbinesBy Fabian Kirsch
Cyclic behaviour of axially loaded piles has been an issue since studies revealed that the capability to transfer skin friction into the ground is highly depending on the level and the number of load
Jan 1, 2011
-
-
Value Engineering of Reinforcement used in Large Diameter Drilled ShaftsBy Shahid Islam, Lucian Bogdan
Deep and large diameter drilled shafts use mostly bundles of Grade 60 (415 MPa) reinforcing bars as longitudinal reinforcement with rebar splices to make it longer. Lower Grade steel requires large nu
Jan 1, 2018
-
Modulus of Elasticity in Deep Bored PilesBy Carlos Lam, Joram M. Amir, Erez I. Amir
"Abstract The modulus of elasticity of pile material (E) is an important parameter for the interpretation of both static and dynamic loading tests on piles. This value is commonly assumed to be consta
Jan 1, 2014
-
Stub Pier Stabilization PerformanceBy Swaminathan Srinivasan, Jess A. Schroeder
"Landslide activity along U.S. 50 in Cincinnati, Ohio (USA) has caused roadway damage for decades. After a necessary closure of three lanes due to slope movements, emergency stabilization measures wer
Jan 1, 2017
-
When Real Estate Values Beckon - The Means And Methods Employed In The Underpinning Of 1501 BroadwayBy Edward J. McNamara
People in the real estate industry are fond of saying that the three most important features of a piece of property are, in order, location, location, and location. This is perhaps the reason that the
Jan 1, 2000