    Different Drilling Techniques in Challenging Geology at Seminole Hard Rock Hotel and Casino

    By Michael Arnold, Jonathan Delgado

    In 2017, Bauer Foundation Corp. (BFC) was awarded the contract to install the deep foundations for the new 17-story Hotel Tower and the Low Rise Casino Expansion at the Seminole Hard Rock Hotel and Ca

    Jan 1, 2018

  • DFI
    Monitoring And Quality Control Of A 100 Metre Deep Diaphragm Wall

    By D. A. Bruce

    To check the feasibility and the quality of a very deep diaphragm wall, a tern of adjacent panels has been constructed, up to a depth of 100 m, in the Milan sandy gravelly soil by means of a hydraulic

    Jan 1, 1989

  • DFI
    Treated Round Wood Piling Specifications

    By James S. Graham

    Specifications for treated round wood piling are presented for the engineers consideration. Included in the text are background information, technical committees, Chellis, quality, treatment, static a

    Jan 1, 1992

  • DFI
    Railroad Bridge Approach Embankment Settlement Mitigation

    By Moi Arzamendi, Jose Ramirez, Kenneth Kniss, Sunil Arora, James Gingery

    Construction of a new approach embankment for a railroad bridge over a river in Southern California required placing up to 12 ft of fill over soft to medium stiff silts and clays along an approximate

    Jan 1, 2018

  • DFI
    The Silver Spring Transit Center: Design And Construction Of Drilled Shafts In An Urban Environment

    By James E. Parkes

    The Silver Spring Transit Center is a new three-level transit center that will include bus loops for County, Metro and intercity buses, parking, and retail space. It replaces an existing bus station

    Jan 1, 2011

  • DFI
    Case History Of The Support Of Excavation System At The San Diego State University (SDSU) LRT Station

    By Allan Sylvester

    This paper will discuss the design, construction, and performance of the support of excavation on the San Diego State University LRT Station. The vertical elements of the system include drilled secant

    Jan 1, 2002

  • DFI
    Deep Mixing Technologies for Lateral Support Systems

    By W. Sondermann

    "AbstractWith the increasing demand in reuse of inner city areas and the urgent need for deeper foundation pits under cramped circumstances, adjacent structures close to and high ground water level, t

    Jan 1, 2014

  • DFI
    Structural Movement And Ground Settlement Control For A Deep Excavation Within An Historic Building ? Synopsis

    By Martin J. Kenwright

    Within the famous Harrods department store, a new lift shaft has been constructed, servicing a depth of 22m below ground level as well as the existing 6 storeys of the store. The shaft will connect wi

    Jan 1, 2000

  • DFI
    Problems Encountered For Deep Caissons For The Second Bassein Creek Bridge At Mumbai, India

    By Deepak B. Deshpande

    This paper enumerates various difficulties encountered in the design and construction of deep caisson foundations for the Second Bassein Creek Bridge constructed over a creek with very difficult site

    Jan 1, 2002

  • DFI
    Copenhagen – Denmark Cityringen Metro Project: Innovative Solution for Deep Excavation in Complex Urban Areas

    By Paolo Cavalcoli, Marco Ziller

    "ABSTRACT: In the year 2010 the State of Denmark together with the Municipality of Copenhagen, launched a very important and complex Project : the complete construction of a new double Subway Line :th

    Jan 1, 2014

  • DFI
    The Equilibrium Point Method Of Analysis For The Statnamic Loading Test With Supporting Case Histories

    By R. G. Horvath

    The Statnamic loading test is a new and innovative method for testing deep foundations. The test is relatively inexpensive, quick, easily mobilized, provides for direct measurement of applied load and

    Jan 1, 1993

  • DFI
    Test Pile Program Carrier Pier And South Wharf Naval Station Puget Sound Everett, Washington

    By David G. Winter

    The first test pile for the carrier pier and south wharf at NAVSTA Puget Sound was driven on December 27, 1989, and the final pile was tested on February 26, 1990. Implementation and modification of t

    Jan 1, 1990

  • DFI
    Experiences With A New Type Of Displacement Screw Pile - Synopsis

    By William Van Impe

    A most renewing and promissing soil displacement screw pile is called the O-pile. The O-screw pile is a soil displacement auger pile based on a screwing in - screwing out procedure. The displacement a

    Jan 1, 1996

  • DFI
    Short Comparison Of The Determination Of Allowable Loads Of Steel H-Piles Following The Practice Applied In Different European Countries - Synopsis

    By L. P. Weber

    During the years 1983-1987, a research programme, jointly performed by the steel producers ARBED, British Steel Corporation, Peine-Salzgitter, Unimetal, and co-sponsored by the European Community for

    Jan 1, 1991

  • DFI
    Ground Vibrations from Pile and Sheet Pile Driving Part 2 — Review of Vibration Standards

    By K. Rainer Massarsch, Bengt H. Fellenius

    "Abstract Vibration limits for buildings with respect to ground vibrations from pile driving published in international standards are reviewed. At first, relevant vibration parameters are defined and

    Jan 1, 2014

  • DFI
    Foundation Retrofitting Using Micropiles - A Case History

    By Mohammad Nasim

    Vertical expansion of existing structures frequently requires foundation retrofitting to enhance the capacity of existing foundations for supporting additional loads. Owing to their small diameter, a

    Jan 1, 2008

  • DFI
    An Innovative Foundation Technology For The Construction Of Retaining Walls In Urban Areas - Introduction

    By F. Pagliacci

    Retaining walls for the construction of underground urban infrastructures have to be executed considering the impact of a deep foundation job-site within an urban network. Traditional excavation syste

    Jan 1, 2000

  • DFI
    Methods Of Constructing Concrete Piles On Heavily Contaminated Sites

    By N. C. Matheson

    The West's Shell Pile has been used on sites with very soft ground conditions for over 60 years. Fibre reinforced precast concrete shells 900mm long are threadled onto an internal mandrel which c

    Jan 1, 1989

  • DFI
    Foundations For Light Buildings On Lime/Cement (L/C) Columns ? Summary

    By Per Eriksson

    For light buildings on clay, foundations on L/C-columns is in many cases a competitive alternative to piles when the thickness of the clay is moderate (<20 m). The method is applicable for the above m

    Jan 1, 2000

  • DFI
    On The Effects Of Sand Grading On Driven Pile Performance

    Precast prestressed concrete piles designed to be end-bearing in a sand stratum at Drax Power Station met with extremely variable resistance during driving. Some piles came to virtual refusal almost i