Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
UHE Peixe Angical: Secant Cutoff Wall in Uncertain GeologyBy Dario Libano, Armando Caputo, Francisco Caputo
"UHE Peixe Angical is a 452 MW hydroelectric power plant located on the Tocantins River in Tocantins, Brazil. In 1999, geologists began feasibility studies to estimate the river’s hydroelectric potent
Jan 1, 2009
-
Ultimate Lateral Load of a Pile in Cohesive Soil under Static LoadingBy Dileej M. Dewaikar, Poonam A. Patil
"In this paper, the ultimate lateral resistance of a long, flexible, unrestrained vertical pile in a cohesive soil is computed under static loading condition using py curves. A simple and improved met
Jan 1, 2005
-
Geographic Information Systems Technology Use in Tracking Quality Control in In Situ Barrier Wall Construction (50051f21-259c-48c8-b98a-08fa9c39001e)By Michael Arnold, Robert Bachus, Michael Bracher, Jamey Rosen, Robert Roff
"For a high hazard USACE facility, the Center Hill Dam in Tennessee, several disparate streams of data were compiled into a single geospatial and relational enterprise data management system to store,
Jan 1, 2017
-
Monotonic And Cyclic Lateral Full-Scale Testing Of Reinforced Helical Pulldown MicropilesBy M. Meckkey El Sharnouby
In this paper, the results of full-scale field testing of reinforced helical pulldown micropiles (RG-HSP) installed in clayey till soils and resting on sandy soils are presented. Piles were tested und
Jan 1, 2011
-
TBM Recovery Shaft Construction - SR-99 TunnelBy Lance Rasband, Richard Hanke, John Starcevich
"The 17.4 meter (57 ft) diameter tunnel boring machine (TBM), the world’s largest at the time of her launch in 2012, locally referred to as “Bertha,” is stuck. Incapacitated due to mechanical failure
Jan 1, 2016
-
Extensive Pile Testing of Auger Pressure Grouted Displacement (APGD) Piles, Los Angeles, CaliforniaBy Todd W. Armstrong, Michael D. Reader
"INTRODUCTIONThe Playa Vista Development is the largest urban infill development in the history of the United States. Overall, it encompasses about 1100 acres in the City of Los Angeles and is situate
Jan 1, 2005
-
Research on Strength Characteristics of Cement-Treated Soils at Construction JointsBy Naoyuki Hanawa, Takeo Asanuma, Tatsuo Nagatsu, Sachihiko Tokunaga, Daisuke Nakagawa, Yoshiyuki Morikawa, Kazuhiko Ueno
"In the cement deep mixing (CDM) method, one approach to joint construction is creating a surface-contact joint. In this study, an unconsolidated-undrained triaxial compression test was performed on c
Jan 1, 2015
-
Design Build & Failure: Perils at a High Risk Shoring and Retaining Wall Project.By Mark Spence, Tom Lardner, Matthew Janes
"IntroductionThe design-build method streamlines project delivery through a single contract between the Contract manager and the design-build team. The design-build method places emphasis on collabora
Jan 1, 2015
-
The Keys to Success in WaikikiBy Alison Savage, Michael Terry
"For decades, the International Market Place (IMP) has been an icon in the heart of Waikiki in Honolulu, Hawaii. It was famous for Duke Kahanamoku’s restaurant where people flocked to hear Don Ho sing
Jan 1, 2016
-
Secant Pile Walls - A Consistent Approach to Risk ManagementBy Vivian M. Troughton, Clifford J. Wren, Tony P. Suckling
"Secant pile walls are used for the construction of deep basement walls and earth retaining structures. Risk associated with secant pile walls is commonly perceived as being the safety of site personn
Jan 1, 2005
-
Full Scale Uplift Load Testing of Micropiles in Cohessionless SoilBy M. Hesham El Naggar, Maged A. Abdlrahem
"Hollow bar micropiles have constructional advantages such as: fast and low-noise and low vibration installation process and small installation equipment, which allow access to tight places. In additi
Jan 1, 2016
-
Challenging Ground Conditons during Flooding Lead to Innovative Deep Foundation Design Process and Load Test EvaluationBy Glen M. Bellew, James F. Mehnert
"The Kansas City District-United States Army Corps of Engineers has completed the design modification of a pile supported floodwall located along the Missouri River in Kansas City, Kansas. This deep f
Jan 1, 2016
-
2013 OPA Winner: Wolf Creek Dam RehabilitationBy Fabio Santillan, Michael F. Zoccola
"Wolf Creek Dam and Lake Cum berland in Russell County Kentucky is operated by the United States Army Corps of Engineers (USAGE) Nashville District It is a combination 3,940 ft long (1,200 m) non-zone
Jan 1, 2013
-
The Wireline Undisturbed Soil Sampling In Deep Foundation ? SynopsisBy Z. Q. Bian
The wireline sampling originates from core drilling in rocks. The authors combined the wireline sampling technique with conventional undisturbed soil samplers, including Osterberg sampler, Denison sam
Jan 1, 2010
-
Nyct's 207th St Yard FloodwallBy Christian L. Escalera
Over seven years ago, on October 29, 2012, Superstorm Sandy pummeled the Northeast of the United States inflicting heavy damage on New York City Transit’s (NYCT) system. Since then, NYCT has been meth
-
Instrumented Pile Load Tests In The Area Of Pearl Harbor, HawaiiBy John Y. L Chen
This paper presents full-scale instrumented pile static compressive and tensile load tests to be conducted in the area of Pearl Harbor, Hawaii. Thousands of piles have been installed to support the ex
Jan 1, 2002
-
Keynote Lecture 3: G. Stuart Littlejohn Compensation and Permeation GroutingBy G. Stuart Littlejohn
In spite of recent concerns in certain European countries, I believe that silicate-ester grouts will continue to be employed in practice, unless more cost-effective inorganic grouts are developed for
Feb 10, 2003
-
The Stiffening Effect of a Caliche Layer on Pile FoundationsBy Richard Stone, Rouzbeh Afsharhasani, Moses Karakouzian
"Caliche, a hardened sedimentary deposit of calcium carbonate that occurs worldwide, generally in arid or semiarid regions, is frequently encountered in Las Vegas, Nevada. The presence of a caliche la
Jan 1, 2015
-
Session 12 "Deep Mixing Method II"By Helen Ahnberg
The scope of the present paper is limited to report the experimental evidence and not for describing the analytical assumptions. However, the idea behind the experimental program is that the deteriora
Feb 10, 2003
-
The Resonant Driver: Ultra High Frequency Pile And Casing InstallationBy Matthew Janes
The installation of piles and casings is becoming increasingly difficult as restrictions on vibration become common in major urban areas. The use of high frequency, resonant excitation of a pile or c
Jan 1, 2008