Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Innovative Micropile Retrofit Of Two Existing Structures

    By Terence P. Holman

    Micropiles are employed to retrofit existing foundations, including underpinning prior to future construction operations and resupport of existing structures that have experienced distortion and settl

    Jan 1, 2007

  • DFI
    Case History: Drilled Shaft Foundation System in Cemented Soils, Las Vegas, Nevada

    By Rouzbeh Afsharhasani, Moses Karakouzian, Brandon Kluzniak

    "The Vegas High Roller is the centerpiece of a new development parcel adjacent to the Las Vegas Strip. At a height of 550 feet, the High Roller is currently the tallest observation wheel in the world.

    Jan 1, 2017

  • DFI
    Design And Load Test Of Micropiles In A Power Plant In Missouri

    By Bidjan Ghahreman

    A total of 120 micropiles were constructed for foundations of a new selective catalytic reduction (SCR) unit in a coal-fired power plant east of Kansas City, Missouri. Construction was performed unde

    Jan 1, 2009

  • DFI
    Load Tests On Belled Piles With Polystyrene Foam Between The Shaft And The Base

    By José Carlos A. Cintra

    This paper addresses a new experimental procedure to measure the shaft friction and the base resistance of bored piles during static load tests. It is proposed that a set of polystyrene foam discs, pl

    Jan 1, 2002

  • DFI
    Cut-Off-Wall Welzow in the Lausitz, Germany, a 400 Feet (120 M) Deep Hydraulic Barrier between an Existing Lake Region and an Open Pit Coal Mine

    By Stephan Fisch, Franz-Werner Gerressen

    "The use of cut-off-walls (COW) for the open pit coal mines has been used for decades. They have been used to reduce the negative hydraulic impact to the surrounding area caused by the open pit mining

    Jan 1, 2017

  • DFI
    Nailed It! The Great Wall of the Chinese Embassy

    By Fred Tarquinio, Giovanni Bonita, Lars Wagner

    "A new embassy for the Peoples Republic of China is under construction in Washington, DC. The 475,000 square feet (44,125 m2) structure has five levels below ground and four above, making it the large

    Jan 1, 2007

  • DFI
    Sonar Calipering Of Slurry Constructed Drilled Shafts - Providing Quality Assurance And Quality Control In Deep Foundations

    By Denton A. Kort

    Historically the visual examination of drilled shafts to determine shape was typically done under dry conditions. Many engineers believe that by using a dry method of construction, the question of sha

    Jan 1, 2007

  • DFI
    Large-scale Shake Table Experiment On The Performance Of Helical Piles In Liquefiable Soils

    By Athul Prabhakaran, Ramin Motamed, Ahmed Elgamal, Milad Jahed Orang, Reza Boushehri

    Documented case histories from past earthquakes have exhibited the devastating effects of the liquefaction phenomenon on the performance of buildings that are often presented in the form of excessive

  • DFI
    Route 9A Pedestrian Tunnel at the World Trade Center

    By Raymond E. Sandiford

    "The redevelopment of the World Trade Center (WTC) provided an opportunity for the Port Authority of NY and NJ to complete a long sought underground connection between all of Lower Manhattan’s transit

    Jan 1, 2012

  • DFI
    Arctic Emergency Operation: Deception Bay Rehabilitation

    By Jeff Starchuck, Harald Kullmann

    "In 2005, an inspection showed that the Deception Bay Wharf in the Canadian Arctic was at the end of its service life. Although Deception Bay is closed with landfast ice up to 5 ft thick, shipping ope

    Jan 1, 2009

  • DFI
    Silver Star Motors “Tackles” Brownfield Site and Adjacent NYCT Subway

    By Dharmil Patel, Michael J. Chow

    "Construction progress is nearing completion at a Brownfield Site for a 100,000sf mixed-use 10 story building plus cellar for Silver Star Motors including a two-floor pre-owned Mercedes Benz showroom;

    Jan 1, 2016

  • DFI
    Experiences And New Developments In Offshore Foundation

    By Franz-Werner Gerressen

    As alternative energy industries pick up speed internationally, and as government regulation and restriction limit the use of impact hammers due to environmental limitation from construction induced n

  • DFI
    The Little Lake Harris Bridge Settlement Restoration Project: Lessons Learned

    By Amr Sallam, David Thompson, Moataz Hassan

    "The Little Lake Harris (LLH) Bridge was constructed in 1951 to replace the eastwest County Road 48 Bridge connecting the towns of Howey-in-the-Hills and Astatula in Lake County, Florida, United State

    Jan 1, 2015

  • DFI
    Design And Construction Of A Micropile Wall To Stabilize A Railway Embankment.

    By Jim Bruce

    This paper presents details of a slope stabilization scheme built in late 2003 at a 16m-high railway embankment in southern Ontario, Canada. The owner, faced with continuing maintenance and safety iss

    Jan 1, 2004

  • DFI
    Cased Auger Piles (CAP): An Effective Piling Solution

    By Federico Pagliacci

    Continuous Flight Auger (CFA) technique represents an important technological advance in the construction of piles in soft soils. The possibility of excavation under the water table with no need for

  • DFI
    Cased Auger Piles (CAP): An Effective Piling Solution (With CAP Technique)

    By Federico Pagliacci

    Continuous Flight Auger (CFA) technique represents an important technological advance in the construction of piles in soft soils. The possibility of excavation under the water table with no need for d

    Jan 1, 2017

  • DFI
    High Capacity Grouted Helical Piles

    By Mohamed A. Mansour, Ahmed M. Soliman, M. H. El-Naggar

    "Grouted helical piles allow significant increase in pile capacity with low additional cost over that of conventional helical piles. They can be particularly advantageous in sites where installation d

    Jan 1, 2016

  • DFI
    Jet Grouting at the West Toronto Diamond Grade Separation Project

    By Jim Bruce, Naresh Gurpersaud

    "The West Toronto Diamond project, under construction since 2006 and due to be complete in 2015, is a rail-to-rail grade separation project in the heart of urban Toronto. Once complete, a depressed co

    Jan 1, 2017

  • DFI
    Case Studies/case Histories In Geotechnical Engineerin: Enhancing The Practice In An Interactive Learning Environment

    By Waddah Akili

    This paper describes the steps taken in planning, developing, and executing a case study/ case history course in geotechnical/ foundation engineering at an international university. The paper sheds li

  • DFI
    Real Time Monitoring Of Utility Vaults during Reconstruction of the Elliot Bay Seawall

    By Pierre Gouvin

    "This paper discusses real time monitoring of utility vaults during the reconstruction of the Elliot Bay Seawall in Seattle. The project, undertaken because deterioration of the old wall posed increas

    Jan 1, 2017