High Capacity Minicaissons In NYCBy Lawrence F. Johnsen
Six case histories are presented in which tall, slender high rises are supported on high capacity minicaissons. The recent development of a high strength rebar cage has resulted in compressive loads o
Jan 1, 2007
-
High And Low Strain Testing Of Bouncing PilesBy Kyle L. Murrell
Along the southeast United States coast, clayey silt and silty clay marine formations may cause pile installation and integrity problems. More specifically, excess pore pressures which develop in the
Jan 1, 2008
-
Heating and Cooling Structures with Steel Pile Foundations - Closed Loop Standing Column Well Technology (df25801f-7df6-457c-ab18-569c2a6ce07f)By Paul Suver
"The closed loop standing column well (CLSCW) system uses a closed circuit of water to develop the same thermal heat exchange characteristics that are achieved from traditional open circuit standing c
Jan 1, 2017
-
Hammer-Grout Piles At The Bronx-Whitestone BridgeBy Ameir Altaee
Unconventional means and methods were utilized to install over 650 contractor-designed micro-piles for the replacement of the Bronx approach to the Bronx-Whitestone Bridge in New York City. The metho
Jan 1, 2010
-
Doyle Drive – Extreme Pile InstallationBy Peter Faust
"The south access road to San Francisco’s Golden Gate Bridge, known as Doyle Drive or Presidio Parkway, needs to be replaced. Built in 1936, it is the primary highway and transit linkage through San F
Jan 1, 2012
-
Augered Cast-In-Place Pile Installation, Grand Forks, North DakotaBy Kyle A. Kershaw
The City of Grand Forks, North Dakota obtains drinking water from both the Red River and Red Lake River through a system of raw water intakes, shallow pipelines, and pump stations. However, during flo
Jan 1, 2003
-
Combined Piled Raft Foundation (CPRF) responseBy G. L. Sivakumar Babu, P. Chaithra
"Raft foundations which are used against differential settlements and for carrying heavy loads can still be subjected to excessive settlements even if it is safe against bearing capacity consideration
Jan 1, 2015
-
Deep Drilling at Mica Dam, British ColumbiaBy Douglas G. Baker, Jason K. Braund-Read, Megan R. Sheffer
"Mica Dam, owned by British Columbia Hydro, is an 820 ft high earthfill embankment dam that was completed in 1973. The dam consists of a thin central impervious till core supported by upstream and dow
Jan 1, 2017
-
Underpinning Of A 16th Century Cistercian Abbey FoundationBy Michel Bustamante
The original Cistercian Lure abbey situated in eastern France and built in the second half of the 16th century, has become nowadays an administrative building. Because it has been founded on poor grou
Jan 1, 2002
-
Estimation Of Maximum Unit Side Resistance In Drilled Shaft Foundations From Partially Mobilized Load-displacement DataBy Ramin Motamed, Anna Panorska``, Joseph A. W. Toth
In this study, a dataset of 145 bi-directional and static load tests was used to evaluate the load-displacement response with respect to unit side resistance for drilled shafts comprising fully and pa
-
Ground Improvement By Stone Columns At Formosa Plant Taiwan And Its Earthquake ResponseBy Wolfgang G. Brunner
Mai- Liao, in Yun Lin province of Taiwan, which was once a remote area on the coast of the South China Sea, has been developed into an offshore industrial complex. Approximately 100 million m3 of impo
Jan 1, 2002
-
Integration Of Real Time Pile Design By Means Of Building Information ModelingBy Prof. Dr. -Ing. habil. Sascha Henke, Johannes Beck
The growth of Building Information Modeling (BIM) during recent years opens possibilities for integrating new digitally driven design approaches. While parametric design and algorithmic design slowly
May 1, 2022
-
A Case History on Design, Construction, and Performance of Stone Column Ground Improvement beneath an MSE EmbankmentBy Dominic Parmantier, Karen Dawson, Suthan Pooranampillai, Seungcheol Shin
"This paper presents a case study of the deformation-based design, construction, and performance of stone column ground improvement (GI) beneath a mechanically stabilized earth (MSE) wall and bridge a
Jan 1, 2017
-
Design Of Cost-Effective Retaining Wall At The Junction Of Approach Bridge Over A RampBy Dr. Anup Kumar Mandal, Partha Roy, Shuvranshu Kumar Rout, Dipak Mandal, Biswajit Das
Installation of a new scalping station with bunker, apron feeder, scalping screen, ramp -retaining wall and approach bridge was planned in an existing integrated complex of phosphate fertilizer at a r
Sep 1, 2022
-
Investigation Of Bearing Behavior Of Pile Raft Foundation Using Numerical ModelingBy A. Ghorbani
The analysis of Combined Pile Raft Foundation (CPRF) is very complex due to involved interactions among components of CPRF system. Many researchers made efforts to develop sufficient methods including
Jan 1, 2007
-
Woodrow Wilson Bridge CofferdamsBy Roderic A. Ellman
The new Woodrow Wilson Bridge (WWB) will replace the existing bridge over the Potomac River to connect Alexandria, Virginia to Prince Georges County, Maryland. The new WWB will extend approximately 1.
Jan 1, 2005
-
Exploring the Historical Development of Geotechnical EngineeringBy Thomas Kennedy, Michael Bennett
"History never repeats itself, but it often rhymes." The old aphorism reflects how the study of the past may, perhaps, be most widely valued when it can be used to improve current and future decision
Jan 1, 2023
-
Bluestone Dam Safety Assurance Program: An OPA Runner UpBy Jeff Hopple
"Bluestone Dam in Hinton, W.Va., along the New River, is owned and operated by the U.S. Army Corps of Engineers (USACE). Completed in 1949, the dam is 165 ft (50 m) tall, 2,048 ft (624 m) wide, and en
Jan 1, 2014
-
A Study Of Failure Mechanism And Uplifting Capacity Of Tension Pile Foundation ? SynopsisBy K. J. Yang
Based on investigations and model tests combined with pile foundation on Code compilation of drydocks, we present this report to give informations against uplift pressure of piles beneath floor of dry
Jan 1, 2010
-
Port Orange Drilled Shaft Load Tests - IntroductionBy David K. Crapps
The drilled shaft load tests at Port Orange were part of a demonstration project sponsored by the Federal Highway Administration (FHWA) and the Florida Department of Transportation (FDOT). Three load
Jan 1, 1989