Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Electrodeposition Behavior Of Dendritic Copper From Aqueous Copper(I) Chloride Solutions Containing Condensed Sodium Halides

    By K. Murase

    Potentiostatic electrodeposition behavior of dendritic copper from acidic copper(I) chloride (cuprous chloride) baths containing sodium chloride and sodium bromide was investigated. The morphology, or

    Jan 1, 2007

  • CIM
    Automated Development of Construction Schedules Using Onsite Data Acquisition

    By Magdy Ibrahim

    Detailed as-built project schedules are necessary to close out construction projects, benchmarking, forecasting, dispute resolution, and improving cost estimates of future projects. Manual procedures

    Aug 1, 2013

  • CIM
    Gibraltar Mine SAG Mill Expansion Grinding Ciruit Design (5e5517e1-bab6-43d2-8866-c7d882036c0e)

    By R. J. Rotzinger, K. W. Major

    The Gibraltar Mine and Mill facility were commissioned in 1972 by Gibraltar Mines Ltd utilizing a flowsheet consisting of two stages of crushing followed by a rod mill / ball mill grinding circuit. Du

    Jan 1, 2012

  • CIM
    Atmospheric fog in Canadian mines

    By M. K. Gangal, A. E. Hall, S. B. V. Stewart

    "An investigation into the problem of atmospheric fog in Canadian mines is described. Fog occurs in several mines and the reduced visibility can result in the closure of workings for safety reasons. I

    Jan 1, 1989

  • CIM
    Recovery of Uranium from Typical Leach Solutions

    Recently, renewed interest in the recovery of uranium from leach solutions has necessitated a re-examination of the hydrometallurgy methods used for uranium in the 1960?s to 1970?s. A synthesizing ove

    Aug 1, 2010

  • CIM
    Laboratory Simulation and Optimisation of Underground Uranium Bioleaching

    By D. J. Sapsford

    This paper details results from laboratory simulation of an innovative underground bioleaching process. The underground reactors are periodic flushed with recycled leachate to remove uranium that accu

    Aug 1, 2010

  • CIM
    REE and background Au/Ag evidence concerning the origin of hydrothermal fluids in the Cape Ray electrum deposits, southwestern Newfoundland

    By Derek H. C. Wilton

    "The Cape Ray Fault Zone of southwestern Newfoundland contains two notable electrum/ base metal sulphide quartz vein lode occurrences hosted by two contrasting lithological units, viz. a graphite schi

    Jan 1, 1985

  • CIM
    Evaluation of Specific Charge Parameter on Open-Pit Blasting

    By Abdurrahman Tosun

    It is very important for after blasting processes that muck pile fragmentation is predicted and controlled during blasting. Therefore, a significant research effort has been devoted to the development

    Aug 1, 2013

  • CIM
    The measurement of radon emanation rates in a Canadian cut-and-fill uranium mine

    By J. W. M. Porritt, K. C. Cheng

    Knowledge of radon emanation rates from uranium-bearing rocks is essential to the design of mine ventilation systems for uranium mines. Measurements of equilibrium ratio between radon and its daughter

    Jan 1, 1981

  • CIM
    Environmental Geochemistry of Kimberlite Materials: Diavik Diamonds Project, Lac de Gras, Northwest Territories, Canada

    By J. L. Jambor, M. J. Baker, M. J. Logsdon

    "Abstract - Prior to the development of the Diavik Diamonds Project, baseline studies were conducted to determine the geochemical characteristics of four kimberlite orebodies as an aid in the design o

    Jan 1, 2001

  • CIM
    An Expert System Designed to Improve Reliability of Assay Information in a Flotation Plant

    By John D. Carriere, Jean Leung, Daniel. Laguitton, Michael .. J. Burrows

    "The objective of this expert system application in a copper-zinc concentrator, is to increase the availability of assay data through substitution for erroneous data. The assay data is used by the Ope

    Jan 1, 1989

  • CIM
    Electric furnace matte tap hole developments at Falconbridge Limited

    By I. A. Cameron, F. Ham, R. Sriram

    "Planned increases in electric furnace productivity and higher matte temperatures needed for the Sudbury Smelter's S02 Abatement Plan, require an improved matte tap hole. Since startup in 1978, t

    Jan 1, 1995

  • CIM
    Tentative identification of chemical elements likely to escape in the atmosphere at the Lingan coal-fired power plant, Lingan, Nova Scotia

    By Erwin L. Zodrow

    "For 25 chemical elements in electrostatically precipitated fly ash (Lingan coal-fired power station), concentration changes are studied as a function of increasing proportions of fines (ash particle

    Jan 1, 1982

  • CIM
    Major savings and production efficiencies with wear-resistant ceramics

    By P. A. Verhey

    "This paper describes a series of wear-resistant ceramic materials which have been successfully used in the mineral processing industry in Canada. Applications include use with metallic ores, coal, po

    Jan 1, 1981

  • CIM
    16th supplement to bibliography of Canadian contributions in the field of rock mechanics

    By P. E. Weidmark

    "PART I - Published PapersBallivy, G., and Dupuis, M., ""Laboratory testing for the design of grouted rock anchors""; Proc 6th Pan Am Conf Soil Mech Found Eng; Lima; 1:277-291; 1979.Ballivy, G., Ladan

    Jan 1, 1980

  • CIM
    Conversion of a crushing plant to a gold mill in a copper smelter

    By G. Macfarlane

    "In 1985, a crushing plant, located in the feed preparation area of Kidd Creek's copper smelter, was modified. The plant, which originally had treated only copper-bearing materials for the smelle

    Jan 1, 1988

  • CIM
    Electrolytic Copper Refining ? 2007 World Tankhouse Operating Data

    By M. Moats

    World copper refining tankhouse practices have been surveyed. This survey is a supplement to previous surveys that have been carried out in the 1987, 1991, 1995, 1999, 2001 and 2003. On a world basis,

    Jan 1, 2007

  • CIM
    Pressure Leaching of a High Arsenic Copper Concentrate under CESL Process Conditions

    By F. Parada L

    Two copper concentrate with medium and high enargite content were leached in a 3 L autoclave reactor under conditions based on the CESL process. Copper, arsenic, sulfur and iron were checked in all th

    Jan 1, 2014

  • CIM
    The Engineering, Procurement and Construction of the Éléonore Project

    By A. Fortin, C. Fréchette, M. Kreuh

    Éléonore project is a gold ore processing plant at a mine site located near James Bay, Quebec, Canada. SNC-Lavalin was mandated by Goldcorp to perform EPCM services on the ore processing plant and per

    Jan 1, 2015

  • CIM
    Geological control over blast fragmentation

    By Yves C. Lizotte, Malcolm J. Scobie

    Blast fragmentation is affected by the physical and mechanical characteristics of the rockmass as determined by geology as well as the explosive energy, the partition of this energy, the actual amount

    Jan 1, 1994