Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Cemented Fill Practice and Research at Mount Isa

    This paper considers three aspects of cemented fill practice and research in Mount Isa. Firstly, an account is given of the use of Portland cemented hydraulic fill both in MICAF sills and in recovery

    Jan 1, 1971

  • AUSIMM
    Recovery of Metallic Zinc from Bath-Smelting Gases - Thermodynamic Considerations

    By Ranklin W. J, Swinbourne D. R

    Lead blast furnace slags contain typically 10 - 20 mass per cent Zn. The zinc can be recovered by slag fuming, in which a powdered coal/air mixture is injected into a molten slag bath. Volatilised z

    Jan 1, 1993

  • AUSIMM
    Rakeless Thickener Operation at St Ives Gold Plant

    The first 12 m diameter rakeless thickener in the Australian gold mining industry was installed to treat plant tailings at the St Ives gold plant in April 2000. The plant processes approximately 3.2 M

    Jan 1, 2002

  • AUSIMM
    Address to the 4th Mill OperatorÆs Conference Burnie, 11 March 1991

    It is indeed a pleasure to be here this morning to open the 4th Mill Operators' Conference. It is no mean feat to organise such an event and I would like to congratulate the committee for the wo

    Jan 1, 1991

  • AUSIMM
    Kwinana Nickel Refinery - Recent Plant Changes

    By Troman L, Groutsch J. V

    The Kwinana Nickel Refinery began operations in 1970 processing sulphide concentrates from Kambalda using the Sherritt Gordon pressure leach and hydrogen reduction process to produce nickel metal as

    Jan 1, 1996

  • AUSIMM
    The Design and Commissioning of the Argyle Diamong Mines Heavy Medium Separation Plant

    The Argyle Diamond Mine came on stream late in 1985 as the world's largest diamond producer in terms of carat output. The design of the process plant, including the heavy medium separation (HM

    Jan 1, 1987

  • AUSIMM
    The Response of Powered Supports and Pillars to Initial Longwalling Under a Strong Main Roof

    By Pala J

    The Ellalong Colliery has been the first to mine the Greta Seam using the longwall method. Analysis of data from geotechnical monitoring has pointed to the role of the strong, massive sandstones o

    Jan 1, 1986

  • AUSIMM
    Exclusion of Residual Water Manifestations in Mine Workings

    The interaction of man with the environment has a double character. From one side, mankind can not exist without co- nsuming the natural resources and, from the other side, we actively alter and exe

    Jan 1, 1988

  • AUSIMM
    Mine Access Road Slope Failure: A Case Study from the Ok Tedi Mine

    A case study of a landslide, which threatened vital infrastructure essential for the continuous operation of the Ok Tedi copper mine is presented. The paper presents a detailed description of the la

    Jan 1, 1997

  • AUSIMM
    Mine Rehabilitation: An Economic Perspective on a Technical Activity

    By Cox A

    A key concern both in public perceptions of the environmental performance of the mining industry and in the development of policy relating to mining activities is the state in which the areas may be l

    Jan 1, 1992

  • AUSIMM
    Electronic Detonators ù Banking the Benefits

    Electronic detonators bring a fundamental and radical change to the potential of rockbreaking operations. The immense technical challenge of safely merging electronic systems with explosives has been

    Jan 1, 2004

  • AUSIMM
    Hydraulic Shovel Simulator in Surface Mining Excavation Engineering

    By J Szymanski, Y Hu

    Excavation engineering involves complex processes for primary and secondary extraction of materials. The shovel excavators bear varying mechanical energy input and stress loading across the working be

    Jan 1, 2003

  • AUSIMM
    A Study of How the Velocity of Detonation Affects Fragmentation and the Quality of Fragments in a Muckpile

    Blasting in Norwegian mines is often carried out by contractors who tend to look for the cheapest solution, without concern about fragment quality. The requirementsfor a contractor are usually only

    Jan 1, 1995

  • AUSIMM
    The Discovery and Early History of the Mt Leyshon Gold Deposit, North Queensland

    By J E. Lynch

    The Mt Leyshon gold deposit produced in excess of three million ounces of gold and considerable silver over a period of approximately 130 years. Most of this production occurred between 1987 and 2001.

    Jan 1, 2004

  • AUSIMM
    Dynamics Decision Sustaining System of Engineering Network Project

    This paper mainly studies the creation and optimisation of a doublesymbol random engineering network, by means of developing a set of engineering network project dynamic decisions and an optimisation

    Jan 1, 2003

  • AUSIMM
    Commissioning the Preparation Plant at the Newlands Coal Mine

    The process and control technologies incorporated into the coal preparation plant at Newlands were to be used for the first time in Australia. The commissioning organisation and procedures were se

    Jan 1, 1986

  • AUSIMM
    Parameters in Rotary Drill Bit Life at Elura Mine, N.S.W.

    A paper presenting the results of studies carried out on rotary drill bit life at EluraMine N.S.W.Contributing parameters, including dataon drill operation and geology are compared to the performance

    Jan 1, 1985

  • AUSIMM
    Experiences with Computer-Based Monitoring Systems in Polish Coal Mines

    A modular computer-based monitoring system for mines is dis-cussed. The system consists of the following modules : production moni-toring system HADES, methane monitoring system CMC, seismoacoustic an

    Jan 1, 1985

  • AUSIMM
    Investigations on Adsorption and Mobilisation of Main Components of Bituminous Coal Flotation Reagents Using the C-Radiotracer Method

    By Hoberg H, Schnieder FU

    The disposal of residues from coal preparation and processing will to an increasing extent require investigation and consideration of the environmental problems resulting as a consequence of this.

    Jan 1, 1993

  • AUSIMM
    SAG Milling in Australia ù Focus on the Future

    By G B. Siddall

    The paper examines the current state of equipment and circuit design, with reference to Australian practice. Following a review of the changes in milling applications over the last 15 years, developme

    Jan 1, 2002