Purity Systems Inc. Metals Capture Technology for Copper, Nickel and Cobalt RecoveryBy K Kellett, A V. Metzner
From its discovery in 1845 ion exchange has continually improved technically to an extent where it is now in wide use commercially in many industries including mining and environmental. Purity Systems
Jan 1, 2002
-
Maximum Panel Width Determination for Sub-level Caving with Bottom Ore DrawingBy Adranyl W. W
Sub-level caving with bottom ore drawing has gained wide acceptance in rich, soft, low magnetic iron ores because it provides moderate ore dilution and ore losses. The main problem here is the high
Jan 1, 1995
-
Development of Trials for Rehabilitation of a Bucket Wheel Excavator Spoil DumpBy Walton S, Wheeler D. J, Sargent D. M, Ting L. Y
Goonyella-Riverside mine is an open cut coal mine in Central Queensland. One component of the mining operations at this site is an uncompacted spoil dump some 50 m above the natural ground surface and
Jan 1, 1992
-
Difficulties Associated with using Indicator Minerals for Diamond Exploration in North QueenslandMinerals similar to the indicator minerals used in kimberlite exploration are widespread in the Cainozoic alkali basalts of north Queensland. Magnesian ilmenite, pyrope garnet, chrome diopside, ch
Jan 1, 1984
-
Settling Pond Design and Construction for the Malvern Hills Coal Project, CanterburyThe Malvern Hills coal project is now in an advanced stage of development with the stripping of overburden from above former underground workings in which a 3 m seam of subbituminous C coal with very
Jan 1, 2003
-
Modern Design Practice in Post-Combustion Off-Gas Systems for Metallurgical FurnacesBy B Wiggins, M Russell
Off-gas handling systems are a critical component of modern metallurgical furnaces and typically represent as much as 50 per cent of the total installed smelter capital cost. Inadequate off-gas system
Jan 1, 2002
-
The Results of a Core Testing Programme for Cobar Mines Pty. Ltd.Uniaxial compressive strength and Young's modulus values measured in the laboratory on NX diamond drill cores were examined statistically to bring out any significant differences between differen
Jan 1, 1969
-
Subsidence for Deep Longwall Mining of Coal Overlain by Massive Sandstone StrataMining is taking place at increasing depths of cover on the Southern Coalfield beneath pre- dominantly massive sandstone strata. Within the next twenty years, there will be longwall mining at depths
Jan 1, 1981
-
Design and Operation of the Dewatering System for the Lochiel Trial PitBy Sullivan TD, Redman PG
AND INTRODUCTION The Lochiel coal deposit, a large Tertiary soft brown coal deposit in the mid north of South Australia, is currently being investigated by the Electricity Trust of South Australia (
Jan 1, 1988
-
Field-Scale Assessment of Bioremediation Strategies for Two Pit Lakes Using LimnocorralsBy R Pie, J Crusius, P Whittle, J J. McNee
The Main Zone and Waterline pit lakes at the Equity Silver Mine near Houston, BC (Canada) are the sites of an ongoing three-year government- and industry-funded research program. In order to assess th
Jan 1, 2003
-
Appraisal of the Jameson Flotation Cell for Recovery of Cyanide Soluble CopperBy Harbort G. J
Jameson cell pilot plant trials were conducted in a number of areas in the Red Dome gold/copper flotation plant during 1991. The aim of testwork was to reduce the amount of cyanide soluble copper re
Jan 1, 1992
-
Future Trends in the Non-Ferrous Metal Industry of the WorldBetween, 1980 and 1984, the demand for non- ferrous metals in the free world grew annually by 1.5 per cent for copper, 0.4 per cent for lead, 1.4 per cent for zinc, and 2.5 per cent for nickel. The
Jan 1, 1986
-
Technology for Mine Water Management General Report (944cdd0a-6520-484e-ae27-57a5f498ce74)PAPERS : 1 COMPUTER AIDED DESIGN OF MINE WATER MANAGEMENT - Z KESSERU 2 THE HYDROGEOLOGICAL PROBLEMS OF GROUNDWATER PROTECTION IN MINING REGIONS - V A MIRONENKO 3 WATER MANAGEMENT OF THE MAE MOH PRO
Jan 1, 1988
-
Sampling and Blending Practice for a 5000 Tonne/Day Iron Blast FurnaceBy Brown D. N, Troth D. A
Large blast furnaces demand high standards of preparation of feed materials which must meet tight specifications of chemical and physical quality. Measurement of these factors must be expeditious b
Jan 1, 1976
-
A Review of General Considerations for Assessing Rock Mass Blastability and FragmentationBy P Lilly
Blasting is the primary comminution process in most mining operations. This process involves the highly complex and dynamic interaction between two main components. The first is the detonating explosi
Jan 1, 2001
-
Measurement and Simulation of Face Ventilation Effectiveness for Large Diesel Powered EquipmentBy Brechtel C. E
Providing adequate airflow to effectively dilute and remove diesel pollutants in large mine working headings is a little researched area. A simulated diesel mucking operation was carried out in th
Jan 1, 1988
-
The Nena high sulphidation copper-gold system, Frieda River Complex, Papua New GuineaBy Corbett GJ, Leach TM
The Nena Cu-Au high sulphidation deposit has formed within the Frieda River Intrusive Complex in association with a major dilatant structure. Multiple intermediate intrusives of Miocene age are locali
Jan 1, 1994
-
Some characteristic features of chromite in the Marum Ophiolite Complex, Papua New GuineaThe Ramu chromite deposit occurs in the Marum Ophiolite complex and is the most economically attractive chrom-ite deposit in Papua New Guinea. Its lateritic nickel, chromite and cobalt potential has a
Jan 1, 1994
-
Fingerprinting and Signatures - Tracing Mine Impacts in Complex Aquatic SystemsBy C Bonini, A Markham, P Whittle, B Pearson
"Mine-derived sedimentation in rivers can have significant impacts on the processes and features of the receiving environment and impact on communities reliant on this environment. However, identifyin
Nov 26, 2013
-
Comparison of Acid Production From Pyrite and JarositeBy M Berndt
Four siltite-argillite rock samples were characterised (particle size, chemistry, mineralogy) and subjected to laboratory dissolution testing for 36 to 298 weeks. In two samples sulfur (0.99, 1.69 wt
Jan 1, 2003