Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Use of a Colour Parameter in a Machine Vision System, SmartFroth, to Evaluate Copper Flotation Performance at Rio TintoÆs Kennecott Utah Copper ConcentratorBy G Forbes, D J. Bradshaw, G S. Heinrich, D
Traditionally, operators on mineral flotation plants have relied on visual inspection of the froth surface when making adjustments to process set-points. Machine vision systems are being developed to
Jan 1, 2005
-
In - Pit Crushing and Conveyor Transportation of Coal at UlanInitial coal production at Ulan was solely from underground mines. A significant increase in demand for steaming coal in the late 1970's emphasised the need to further expand production and led t
Jan 1, 1985
-
Weighing of Open Cut MachineryAn improved technique for the quick and accurate measurement of the weight and centre of mass in the horizontal plane of large machines has been developed. On-site weighing of large plant such as bu
Jan 1, 1989
-
The Lochiel Trial Pit Design and ExcavationBy Sullivan T. D
The Lochiel Deposit is a large occurrence of soft brown coal about 130 km north of Adelaide. The deposit is undergoing continued evalua- tion of which an integral part was the excavation of a Trial P
Jan 1, 1988
-
Data cross validation for a newly commissioned dynamic drop test facilityBy D W. Evans
Research into the dynamic properties of ground support elements continues to grow at a global level, given the increasing importance of this field of application within underground hard rock mining. M
Nov 29, 2022
-
Stability of Hydraulic Backfill Barricades (eefd356e-6d40-4b19-af58-7f0537046a1f)Hydraulic backfill is generally retained in slopes using permeable barricades. Mitchell et a! (1975), Mitchell (1992) and Grice (1989) have shown that under normal drainage conditions, barricades e
Jan 1, 1998
-
After Blast Re-Entry Time for a Room and Pillar OperationBy A Agasty, O Langefeld, MáKellner, E Clausen
The lowering of the pollutant concentration limits at the workplace subjects the mining industry to higher requirements for dilution; this situation is worsened with the current discussions within the
Jul 1, 2013
-
Valid spontaneous combustion hazard assessment for surface mine environmental impact statementsBy J Theiler, B Beamish
Spontaneous combustion hazard assessment from an environmental impact perspective is not well understood and is seldom given due consideration in environmental impact statements. In surface mining ope
Jul 25, 2018
-
The Backfilling Philosophy for Massive Mining at Depth in the South Deep Section, Western Areas Gold Mine (f2bb1cd1-7859-47a6-a8fe-c624335a573a)By MacDonald AJ, Raffield MP
The South Deep massive orebody consists of 20 to 30 in of payable conglomerates ranging in dip from 11¦ to 20¦ and at depths of between 2400 in and 34(10 in. The mine design process selected a minin
Jan 1, 1998
-
An International Assessment of Australia as a Location for Project DevelopmentBy Whiting AN
Major changes in the world in recent years are changing the criteria for selection of future developments. Oil prices soared during the 1970's while commodity prices including metals and mine
Jan 1, 1983
-
A Comparison of Two Methods for Calculating the Constants K and Alpha in a Broken OreBy R Minnitt
Two methods of calibrating the parameters K and Alpha for use in Gy’s formula for the fundamental sampling error were investigated. Approximately 480 kg of broken ore from Harmony’s Target gold mine i
Jul 29, 2014
-
Design and Operation of Backfill Silos for Reliable High Solids Concentration DischargeThis paper will first discuss the fundamental requirements for reliable discharge of backfill by gravity alone at high per cent solids. This discussion will include brief mention of the underlying pri
Jan 1, 1998
-
Advanced Technology for Setting Out of Blastholes and Measurement while DrillingBy D Xiong, G Xu, L Yao, F Wang, Y Duan
The goal of this project has been to digitise and use drill parameter data from rotary drilling (measurement while drilling; MWD) for a more effective planning of the blasting process in surface mines
Aug 24, 2015
-
Design and Construction of Tunnels for Northern Gateway Project, New ZealandBy M Behrens, A McPhee, B D. Hegan
This paper describes the design and construction of twin 400 m long road tunnels as part of the Northern Motorway Extension Project in Auckland, New Zealand. Construction of the tunnel civil works is
Jan 1, 2008
-
Maritime Bulk Cargo Transportable Moisture Limit Requirements for Iron Ore ShipmentsBy K Williams, M Pender, T Honeyands, T Krull, D McCallum, R Holmes, R Orense
Bulk cargoes, including iron ore fines, must be shipped according to the rules agreed by the member states of the International Maritime Organization (IMO). One critical safety measure is the transpor
Jul 13, 2015
-
Non-Parametric Bayesian Learning for Resource Estimation in the Autonomous MineBy F Ramos
Conventional techniques for resource estimation generally involve the laborious analysis of variograms and the specification of parameters for covariance functions. In large deposits, construction of
Sep 26, 2011
-
Preliminary Design for the Rockwater Power Project, South Island, New ZealandBy H Asche
The proposed Rockwater Power Project is a hydropower development on the Waitaki River in the South Island of New Zealand. The proposed development will have an installed capacity of 250 MW with a peak
Mar 8, 2011
-
High-Resolution Pit Water Quality Model for the Highway Reward Mine, Queensland, AustraliaBy B G. Lottermoser
Field and laboratory data combined with computational modelling have been used to predict the pit water quality for the Highway Reward mine. Open pit mining of the Highway Reward copper-gold deposit h
Jan 1, 2003
-
Mining Safety - The Lessons Learned but not AppliedBy J M TORLACH
Learning is an iterative process, and we might reasonably expect that after more than a century of mining during an era of sustained technological development, (following a millenium or two of unrel
Jan 1, 1992
-
Planning Stable Post-Mining Landforms: The Application of Erosion ModellingBy Riley S. J
The basic aim of mine planning is to design mine layouts and schedules that achieve optimisation of operations, minimum cost and maximum resource recovery. Successful accomplishment of this aim is f
Jan 1, 1994