  • AUSIMM
    The Use of a Colour Parameter in a Machine Vision System, SmartFroth, to Evaluate Copper Flotation Performance at Rio TintoÆs Kennecott Utah Copper Concentrator

    By G Forbes, D J. Bradshaw, G S. Heinrich, D

    Traditionally, operators on mineral flotation plants have relied on visual inspection of the froth surface when making adjustments to process set-points. Machine vision systems are being developed to

    Jan 1, 2005

  • AUSIMM
    In - Pit Crushing and Conveyor Transportation of Coal at Ulan

    Initial coal production at Ulan was solely from underground mines. A significant increase in demand for steaming coal in the late 1970's emphasised the need to further expand production and led t

    Jan 1, 1985

  • AUSIMM
    Weighing of Open Cut Machinery

    An improved technique for the quick and accurate measurement of the weight and centre of mass in the horizontal plane of large machines has been developed. On-site weighing of large plant such as bu

    Jan 1, 1989

  • AUSIMM
    The Lochiel Trial Pit Design and Excavation

    By Sullivan T. D

    The Lochiel Deposit is a large occurrence of soft brown coal about 130 km north of Adelaide. The deposit is undergoing continued evalua- tion of which an integral part was the excavation of a Trial P

    Jan 1, 1988

  • AUSIMM
    Data cross validation for a newly commissioned dynamic drop test facility

    By D W. Evans

    Research into the dynamic properties of ground support elements continues to grow at a global level, given the increasing importance of this field of application within underground hard rock mining. M

    Nov 29, 2022

  • AUSIMM
    Stability of Hydraulic Backfill Barricades (eefd356e-6d40-4b19-af58-7f0537046a1f)

    Hydraulic backfill is generally retained in slopes using permeable barricades. Mitchell et a! (1975), Mitchell (1992) and Grice (1989) have shown that under normal drainage conditions, barricades e

    Jan 1, 1998

  • AUSIMM
    After Blast Re-Entry Time for a Room and Pillar Operation

    By A Agasty, O Langefeld, MáKellner, E Clausen

    The lowering of the pollutant concentration limits at the workplace subjects the mining industry to higher requirements for dilution; this situation is worsened with the current discussions within the

    Jul 1, 2013

  • AUSIMM
    Valid spontaneous combustion hazard assessment for surface mine environmental impact statements

    By J Theiler, B Beamish

    Spontaneous combustion hazard assessment from an environmental impact perspective is not well understood and is seldom given due consideration in environmental impact statements. In surface mining ope

    Jul 25, 2018

  • AUSIMM
    The Backfilling Philosophy for Massive Mining at Depth in the South Deep Section, Western Areas Gold Mine (f2bb1cd1-7859-47a6-a8fe-c624335a573a)

    By MacDonald AJ, Raffield MP

    The South Deep massive orebody consists of 20 to 30 in of payable conglomerates ranging in dip from 11¦ to 20¦ and at depths of between 2400 in and 34(10 in. The mine design process selected a minin

    Jan 1, 1998

  • AUSIMM
    An International Assessment of Australia as a Location for Project Development

    By Whiting AN

    Major changes in the world in recent years are changing the criteria for selection of future developments. Oil prices soared during the 1970's while commodity prices including metals and mine

    Jan 1, 1983

  • AUSIMM
    A Comparison of Two Methods for Calculating the Constants K and Alpha in a Broken Ore

    By R Minnitt

    Two methods of calibrating the parameters K and Alpha for use in Gy’s formula for the fundamental sampling error were investigated. Approximately 480 kg of broken ore from Harmony’s Target gold mine i

    Jul 29, 2014

  • AUSIMM
    Design and Operation of Backfill Silos for Reliable High Solids Concentration Discharge

    This paper will first discuss the fundamental requirements for reliable discharge of backfill by gravity alone at high per cent solids. This discussion will include brief mention of the underlying pri

    Jan 1, 1998

  • AUSIMM
    Advanced Technology for Setting Out of Blastholes and Measurement while Drilling

    By D Xiong, G Xu, L Yao, F Wang, Y Duan

    The goal of this project has been to digitise and use drill parameter data from rotary drilling (measurement while drilling; MWD) for a more effective planning of the blasting process in surface mines

    Aug 24, 2015

  • AUSIMM
    Design and Construction of Tunnels for Northern Gateway Project, New Zealand

    By M Behrens, A McPhee, B D. Hegan

    This paper describes the design and construction of twin 400 m long road tunnels as part of the Northern Motorway Extension Project in Auckland, New Zealand. Construction of the tunnel civil works is

    Jan 1, 2008

  • AUSIMM
    Maritime Bulk Cargo Transportable Moisture Limit Requirements for Iron Ore Shipments

    By K Williams, M Pender, T Honeyands, T Krull, D McCallum, R Holmes, R Orense

    Bulk cargoes, including iron ore fines, must be shipped according to the rules agreed by the member states of the International Maritime Organization (IMO). One critical safety measure is the transpor

    Jul 13, 2015

  • AUSIMM
    Non-Parametric Bayesian Learning for Resource Estimation in the Autonomous Mine

    By F Ramos

    Conventional techniques for resource estimation generally involve the laborious analysis of variograms and the specification of parameters for covariance functions. In large deposits, construction of

    Sep 26, 2011

  • AUSIMM
    Preliminary Design for the Rockwater Power Project, South Island, New Zealand

    By H Asche

    The proposed Rockwater Power Project is a hydropower development on the Waitaki River in the South Island of New Zealand. The proposed development will have an installed capacity of 250 MW with a peak

    Mar 8, 2011

  • AUSIMM
    High-Resolution Pit Water Quality Model for the Highway Reward Mine, Queensland, Australia

    By B G. Lottermoser

    Field and laboratory data combined with computational modelling have been used to predict the pit water quality for the Highway Reward mine. Open pit mining of the Highway Reward copper-gold deposit h

    Jan 1, 2003

  • AUSIMM
    Mining Safety - The Lessons Learned but not Applied

    By J M TORLACH

    Learning is an iterative process, and we might reasonably expect that after more than a century of mining during an era of sustained technological development, (following a millenium or two of unrel

    Jan 1, 1992

  • AUSIMM
    Planning Stable Post-Mining Landforms: The Application of Erosion Modelling

    By Riley S. J

    The basic aim of mine planning is to design mine layouts and schedules that achieve optimisation of operations, minimum cost and maximum resource recovery. Successful accomplishment of this aim is f

    Jan 1, 1994