Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Requirements for Manufacture of Nuclear Fuel in AustraliaBy Alder KF
Nuclear power stations to be installed in Australia will be fuelled from Australian resources of raw materials. This will require the establishment of new manufacturing industries and the eventual ex
Jan 1, 1970
-
A New Methodology for Managing Effective External Stakeholder RelationshipsBy S Zaffron, O Loffredi
A critical concern of any mining company today is its relationship with the different stakeholder groups impacted by the operational activity û communities, unions, vendors, local partners and competi
Jan 1, 2006
-
A Method for Determination of Strength of Coal MassBy Qixiang Y
The strength of coal mass saturated with gas is an essential parameter in studying the mechanism of gas and coal outburst,and its prediction method. Up to now, there has not been a method for dete
Jan 1, 1992
-
Big Bell Coming Back for Seconds, Thirds and FourthsIn October 1993 it was decided to undertake the fourth phase of mining at Big Bell. This decision followed the exhaustion of open pit reserves in January 1993. Two stages of mining were proposed for t
Jan 1, 1998
-
Thermosensitive, Hydrophobically Modified Anionic Flocculants for Dewatering Kaolin ClaysBy D R. L Vedoy, L Botha, S P. Gumfekar, J B. P Soares
Most of the known in-place reserves of oil sands are found in Canada. These oil sands ores are mined using various processes to extract bitumen. The by-product slurry resulting from the extraction pro
Jul 27, 2015
-
Environmental Impact Modelling for In Situ Leaching of UraniumBy A Roshal
It is anticipated that many future uranium mines in Australia will be using the in situ leaching mining process. It is fair to say that close to one third of uranium production will be generated by th
Jan 1, 2008
-
Shell-supported Grinding Mill for the Ernest Henry ProjectTumbling mills have been used in the minerals indusu) for occr WO years, with the design changing little, but the size of the individual pieces of equipment increasing significantly with the lowerin
Jan 1, 1997
-
Spaceborne Radar Interferometry for Mine Subsidence Monitoring in AustraliaBy C Rizos, A Ng
Land surface deformation can be caused by underground mining activities. The maximum subsidence normally occurs directly above the location of the excavation of the coal seam. In the case where the lo
Jan 1, 2008
-
Systems Analysis Tools for Promoting Effective Energy/Minerals PartnershipsBy M Stewart, J Petrie, L Basson
This paper explores tools which have the potential to promote and assess the formation of partnerships between the minerals and energy industries to enhance the economic, environmentally responsible a
Jan 1, 2004
-
Heterogeneity assessment for grade engineering in complex ore bodiesBy C Sennersten, A Hellicar, C Lindley
Traditional methods of resource modelling and mine planning rely upon geostatistical methods applied to exploration drill core data to derive a three dimensional model of the distribution of metal gra
Nov 21, 2018
-
Laterite Ores - Nickel and Cobalt Resources for the FutureAlthough laterite ores already provide a significant proportion of the world's nickel and cobalt production it is anticipated that they will surpass sulphide ores as a source of nickel in the n
Jan 1, 1996
-
Flotometric Analysis and Predictive Calculations for Industrial Flotation FlowsheetsBy Kavetsky A
A new model of flotation is presented which allows predictive calculations of total solids flows and metal grades and recoveries to be made for industrial flowsheets. A method of making these calculat
Jan 1, 1992
-
Smoke Duct or No Smoke Duct for Road TunnelsBy R Lau
In recently completed road tunnel projects in Queensland, such as the Airport Link and the Clem7 tunnels, there is a smoke duct running along the roof of the carriageways to extract smoke in case of f
Sep 17, 2014
-
Estimation of Flyrock Travel Distances: A Probabilistic ApproachBy M F. L Gibson
The issue of flyrock is very important in the operation of all mineral extraction sites that use blasting. Unlike the other environmental effects of blasting, ground vibrations and air overpressure, f
Jan 1, 2001
-
Polymer-amended tailings dewatering technology for desired closure outcomesBy T Baumgartl, A Costine, B Boshrouyeh, M Edraki
In mineral processing, the management of tailings may become increasingly more challenging with a change of ore type and the quality of water used in the plant. This, in turn, may affect the overall c
Aug 2, 2023
-
Plant Design for Remote Locations in Papua New GuineaBy Majorkiewicz A
Engineering of gold treatment facilities complete with infrastruc- ture in a remote location such as Papua NewòGuinea present unique problems to the design team. Site location, topography, ground co
Jan 1, 1991
-
Creating a Geotechnical Baseline Report for Project Hobson, AucklandProject Hobson involves the replacement of an existing 90-year-old above-ground sewer that crosses Hobson Bay in Auckland, New Zealand, and which is nearing the end of its economic life, with a 3 km l
Jan 1, 2008
-
Safety and Productivity Solutions for Blasthole Preparation and FinalisationMulti Torque Industries and Jadefoil have developed a safer, more efficient method of explosive protection, retention, placement, and constraint. In particular, this refers to advancements in airbag t
Jan 1, 2004
-
Outside Auger Hollow Claw Tipped Mechanical Sampler for CoalBy Z-Y Pi, B Zhang, S Wen
"The paper introduces the structure and work processes of outside auger hollow claw tipped mechanical sampler for coal. Twenty sets of claw tipped sampler performance tests show that: The design of i
Aug 21, 2012
-
The Compatibility of Major Economic Criteria for Project EvaluationThe most frequently applied project evaluation criteria are the Net Present Value, the Internal Rate of Return, and the Pay Back Period. Unfortunately, the Internal Rate of Return and the Pay Back Per
Jan 1, 1991