Search Documents

  • CIM
    Application Practice of Bottom Blowing Continuous Converting to Replace Copper P-S Converter

    By Hongfei Li, JianLong Wang

    This paper introduces the technical characteristics, transformation scheme and production practice of the project in which Copper P-S Converter was replaced by Bottom Blowing Continuous converting for

    Jan 1, 2019

  • AUSIMM
    Recycling of Sludge from the Production of Manganese

    Recycling of Sludge from the Production of Manganese

    Sep 13, 2010

  • NIOSH
    RI 6174 Pressure Forming Of Aluminum Oxide

    By Sara Jane Boles

    The purpose of this Bureau of Mines investigation was primarily to isolate and examine the effect of liquid content upon the apparent porosity and bulk density of compacts pressed from high-purity, fu

    Jan 1, 1963

  • CIM
    Selection and Training of Mining Operators at Barrick Veladero; Strategic Factor for Mining Sustainability

    By Zetti Gavelán

    Lack of skilled workforce in mining industry during the current decade has been a serious concern for most mining organization globally. At the beginning of this decade the major envisioned difficulty

    May 1, 2010

  • AUSIMM
    Willy Amite Redefined

    Willyamite from the type locality, Consols mine, Broken Hill, N.S.W., has been re-examined, and found to consist of zones with widely different Co:Ni ratios. The name willyamite is redefined to includ

    Jan 1, 1970

  • DFI
    Pile Load Testing At JFK International Airport - Synopsis

    By J. Moskowitz

    Construction of the new JFK International Airport Light Rail System (LRS) began in 1998 with a pre-construction load test program. This $1.2 billion design-build project consists of approximately 13 k

    Jan 1, 2000

  • SME
    Overcoming local conflicts and production needs related to mining. Social impact assessment and local participation

    By G. Balletto, C. Furcas

    "The mineral raw materials industry is a key-component of the Gross Domestic Product of industrialised economies, closely related to both the building and the industrial sectors. Despite this, at loca

    Jan 1, 2011

  • SME
    Electronic Calculators Simplify Slurry Program

    The speed and internal accuracy of today's electronic calculators can be utilized to write an efficient slurry calculation program. The calculator's input/output printing feature offers addi

    Jan 4, 1981

  • ISEE
    Tall Structure Response to Close-in Urban Blasting in New York City

    By Cathy Aimone-Martin, Robert Brentar, Brent Meins, James Lauer

    Vibration measurements of multi-story structures in an urban environment began 3 years ago in New York City during close-in blasting to adopt correct measurement procedures and recommend revised groun

    Jan 1, 2014

  • AUSIMM
    Magnetite Recovery Using a Wet Drum Separator

    By Lyman G. J

    Magnetic separator operation in the recovery of magnetite in heavy medium circuits was studied by conducting a series of tests on a full size wet drum magnetic separator.The significant operational va

    Jan 1, 1983

  • AUSIMM
    Geotechnical Milestones at Mount Lyell Mine

    By D A. Cuello, G B. Sharrock

    The Prince Lyell orebody at Mount Lyell Mine has a rich mining history commencing with the open pit in 1935, which transitioned underground in 1972. Between 1972 and 2014 a total of 64 Mt was mined un

    May 9, 2016

  • TMS
    Preparation of Building Material Using Elemental Sulfur and Heavy-metal Containing Slag

    By Yanjie Liang

    Elemental sulfur and volatilization kiln slag(VKS)containing heavy-metal produced by smelter factories were used to produce sulfured building material. The effects of heating mode, material proportion

    Jan 1, 2010

  • AUSIMM
    Closing the Rehabilitation Gap ù A Queensland Perspective

    Mine rehabilitation is a sustainability issue that has been revisited ad infinitum; however, the persistent lack of demonstrated on-the-ground performance and an increasingly intractable rehabilitatio

    Jan 1, 2002

  • SME
    EPB TBM Technology

    By Werner Burger

    Earth Pressure tunnel boring machines are tackling difficult ground conditions that five years previous were not considered feasible. The technology has evolved that allows EPB TBMs to cross into area

    Jan 1, 2008

  • NIOSH
    IC 8218 Research And Technologic Work On Explosives, Explosions, And Flames: Fiscal Year 1962 (18be8f2b-3658-47c1-8502-b22edae03b6d)

    The principle activities of the Explosives Research Laboratory from July 1, 1961 to June 30, 1962, are described briefly in part 1. Part 2 gives short abstracts of publications that appeared during

    Jan 1, 1964

  • DFI
    List Of Exhibitors

    A technical exhibition was held in conjunction with the 4th DFI International Conference on Piling and Deep Foundations, Stresa. The exhibition was located in the ground floor of the Conference Hall.

    Jan 1, 1994

  • NIOSH
    RI 7919 Electrochemical Kinetics of the Reaction of Titanium Metal With Titanium Subchlorides in Molten Sodium Chloride

    By D. J. MacDonald

    Wettability measurements and laboratory waterflood tests were compared under a wide variety of conditions. Experiments were conducted with synthetic and natural crude oils, treated and untreated outcr

    Jan 1, 1974

  • SME
    Minesite Avalanche – Some Lessons Learned

    By Tim Hurley

    On Friday, May 27, 1983 at about 6 p.m., an avalanche occurred at the Revenue-Virginius Mine. Six mine personnel and two contract diamond drillers were trapped when the avalanche covered and blocked

    Jan 1, 2006

  • CIM
    Paste Backfill Strength Behaviour Using Different Binding Agents and Binder Combinations

    By Philip A. Dirige

    This paper presents the variability of responses of paste backfill specimens that have been prepared with varying binding agent and binder combinations, when subjected to uniaxial compressive strength

    May 1, 2006

  • DFI
    Load Testing Of Steel Sheet Piling Driven With A Vibratory Hammer

    By Drew Floyd

    Five full-scale pile load tests were performed on pairs of PZ-22 sheet piles installed with a vibratory pile driving hammer. The sheet piling was installed in several locations in soil generally consi

    Jan 1, 1989