Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    A Simplified Two-Dimensional Analysis Of The Roof-Pillar-Floor Interaction Problem In Coal Mines

    A two-dimensional time-dependent analysis of a overburden-coal pillar-weak floor strata interaction problem is presented as a beam model consisting of a composite roof beam resting on multiple elastic

    Jan 1, 1988

  • SME-ICGCM
    Subsurface Fracture Development Due To Longwall Mining And Its Interpretation Using Image Processing Techniques (736b40e1-a21a-40c0-a678-75088df69d02)

    By Gexin Sun

    This paper presents the physical modelling results of subsurface fracture development associated with longwall mining operations and an application of image processing techniques to interpretion of th

    Jan 1, 1992

  • SME-ICGCM
    Time-dependent Behavior of Immediate Weak Floor Strata from an Illinois Coal Mines

    By Y. P. Chugh

    The paper discusses laboratory and field studies to analyze time-dependent deformation behavior of immediate weak floor strata in an Illinois coal mine. In the laboratory, core samples of the immediat

    Jan 1, 1987

  • SME-ICGCM
    Mechanisms of Chimney Subsidence Over Abandoned Coal Mines

    By Mario G. Karfakis

    Mining related subsidence is a major concern over abandoned shallow coal mines. Many of the subsidence prone areas are presently used or will be used in the future for residential housing development.

    Jan 1, 1987

  • SME-ICGCM
    High Capacity Tensioned Cable Bolts For Tailgate Support

    By Stephen C. Tadolini

    A joint research program was designed and conducted at Lodestar Energy?s Baker Mine to investigate the performance of a high-capacity tensioned cable supported gateroad. The secondary system consisted

    Jan 1, 2000

  • SME-ICGCM
    Geotechnical Planning Basis for the Optimization of Workings

    By Nikolaos Polysos

    Besides considering the given geomechanical conditions, the geological/geotechnical logging of drill cores and heading faces during the driving of parallel entries and the resulting rock classificatio

    Jan 1, 2003

  • SME-ICGCM
    Modern Geotechnical Exploration And Mine Design

    By Patrick S. Artrip

    A deep mining operation in the Lower Kelly (Imboden) seam in Wise County, Virginia experienced severe ground control conditions in its attempt to develop reserves situated under increasingly higher co

    Jan 1, 1993

  • SME-ICGCM
    Multiple-Seam Mining - A State-Of-The-Art Review

    By Chris Haycocks

    The relevant literature concerning ground control, mine planning and reserve conservation in multi- seam mining is reviewed. Factors affecting interaction, interaction mechanisms, and design guideline

    Jan 1, 1990

  • SME-ICGCM
    An Analytical Approach to Determine Stress Distribution in Longwall Chain Pillars

    By James M. Kramer

    This paper introduces an analytical approach for the determination of the vertical stress in the chain pillar system between two adjacent longwall panels. The development of this approach is based on

    Jan 1, 1998

  • SME-ICGCM
    Analysis And Field Testing Of Presupport Application In Coal Strata

    By J. D. Dizon

    Conventional strata control methods (i.e. roof bolts. cable trusses) are not always effective for ground control of very weak coal strata. An alternative method, termed presupport. is being investigat

    Jan 1, 1990

  • SME-ICGCM
    Practical Detection Of Underground Mine Roof Failure

    By David Bigby

    The paper describes research undertaken on an ECSC/K HSE project which investigated several potential physical principles which might be harnessed to provide a non-intrusive means of determining the e

    Jan 1, 2004

  • SME-ICGCM
    Overview of Safety Considerations with Highwall Mining Operations

    By George Gardner

    The rapid growth of highwall mining in the Appalachian coalfields has resulted in unique safety concerns. Due to the concentration of activity at the base of the highwall and the potentially destabili

    Jan 1, 2002

  • SME-ICGCM
    Impact Of Horizontal Load On Shield Supports

    By Thomas M. Barczak

    A theoretical evaluation of the impact of horizontal load on shield support capacity is made from a static rigid body analysis of the shield structure. Parameters affecting horizontal support resistan

    Jan 1, 1984

  • SME-ICGCM
    Entry Stability Monitoring & Analysis For Longwall & Continuous Mining Systems

    By Wm. Mark Hart

    Under a specific geological condition, roof supporting method, and pillar-entry system, an entry convergence concept may be the most effective means that can be used to effectively indicate the longwa

    Jan 1, 1995

  • SME-ICGCM
    Bolting Practice In Longwall Gateroads At The Miike Colliery

    By Kikuo Matsui

    Standing supports such as steel arches or square work supports along with the necessary struts and lagging have been traditionally employed in the longwall gateroads of the Japanese underground coal m

    Jan 1, 1993

  • SME-ICGCM
    The Application of Pre-tensioned Grouted Tendons at Harworth Colliery, UK

    By Chris Adams

    The application of pre-tensioned tendon roof support assisted Harworth Colliery in their revival, from impending closure to lowest cost deep-mined producer in the UK, over just six months last year. T

    Jan 1, 2003

  • SME-ICGCM
    The Effectiveness Of Interpanel Pillars In The Control Of Surface Subsidence (ef7cc44b-3192-4f5f-a75c-62563d519797)

    By Laxminarayan Holla

    There exist many formulae for designing coal pillars. However, when applied to a given set of mining parameters, they lead to different pillar sizes and factors of safety. From the subsidence point of

    Jan 1, 1992

  • SME-ICGCM
    Geotechnical Mine Design Of The Foidel Creek Mine

    By H. N. Maleki

    The results of five years of geotechnical investigations are presented to develop productive and stable longwall layouts for the Foidel Creek Mine. The program was initiated during the pre-mining stag

    Jan 1, 1988

  • SME-ICGCM
    Simplified Pre-and Post-Processing Technique for Performing Finite-element Analyses of Deep Underground Mines (4c70a887-9438-4254-8d3e-3283730c59e0)

    By Marc T. Filigenzi

    Two of the major ground control safety issues confronting underground mine operations today are shaft pillar stability and the failure of rock around active mine openings. Failure of a mine shaft can

    Jan 1, 1997

  • SME-ICGCM
    Further Improvements In The Roof Beam Tilt Method Of Gateroad Support Design

    By Peter Cain

    Twenty years of research into the design of permanent gateroad support (packs) in coal mines have resulted in two methods of pack design based on engineering principles. The first, the detached block

    Jan 1, 1993