Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    The Development And Use Of Risk Assessment Techniques To Assess Roadway Stability In The Parkgate Seam At Thoresby Colliery

    By Paul Cartwright

    A rockbolted roadway risk assessment procedure has been developed specifically for the Parkgate seam at Thoresby Colliery by Rock Mechanics Technology and colliery engineers. The purpose of this asses

    Jan 1, 1999

  • SME-ICGCM
    Site Characterization For Ultra-Close Multi-Seam Mining

    By Yingxin Zhou

    Data from these field studies and previous case study data have been combined to define ultra-dose seam mining environments and relate them to observed failure conditions. A rating system for ultra-cl

    Jan 1, 1990

  • SME-ICGCM
    The Application Of Underground In-Seam Seismic Methods (UISS) To Map The Coal Seam Structure Across Longwall Panels

    By Rene Rodriguez

    The initial results of our investigations on the applicability of geophysical exploration methods to map coal seam inclusions were summarized in a paper submitted at the Thirteenth Conference on Groun

    Jan 1, 1995

  • SME-ICGCM
    The Influence Of Horizontal Stress On Pillar Design And Mine Layout At Two Underground Limestone Mines

    By Garth Kuhnhein

    The Black River and Maysville underground limestone mines operated by Carmeuse Lime and Stone, Inc. in northeastem Kentucky are two of the largest underground limestone operations in the United States

    Jan 1, 2004

  • SME-ICGCM
    Anchorage Pull Testing for Fully Grouted Roof Bolts

    By Chris Mark

    Fully-grouted roof bolts comprise more than 80% of the primary roof supports used in U.S. coal mines. However, nearly 1,500 MSHA reportable, non-injury roof falls occur each year, and most of these ar

    Jan 1, 2002

  • SME-ICGCM
    Safe Pillar Extraction Practice - Some Geotechnical Principles Based on Australian Experience

    By Bruce K. Hebblewhite

    Underground pillar extraction continues to be practiced in Australia in various forms, in spite of the dominance of the longwall method, which accounts for over 90% of underground production. Australi

    Jan 1, 2011

  • SME-ICGCM
    New Design Criteria for Roof Bolt Systems

    By John C. Stankus

    From research started six years ago, a new design criteria has been developed for mine roof bolt systems This design criteria precisely and quantitatively determines parameters such as bolt length, in

    Jan 1, 1997

  • SME-ICGCM
    Premature Rock Bolt Failure Through Stress Corrosion Cracking (SCC)

    By Bruce Hebblewhite

    An ACARP-funded industry research project in Australia recently investigated the problem of premature rock bolt failures in underground coal mines. The project carried out limited sampling from 9 diff

    Jan 1, 2003

  • SME-ICGCM
    Evaluation Of Existing Predictive Methods For Mine Subsidence In The U. S. (1ec2d374-5864-4775-9b19-24759c4f95be)

    By Vladimir Adamek

    Two existing predictive methods were chosen for evaluation; an influence function (Gals Theory) and a profile function (hyperbolic). These were applied to several field measured subsidence pro¬files o

    Jan 1, 1981

  • SME-ICGCM
    Coal Mine Seismicity And Bumps: Historical Case Studies And Current Field Activity

    By John L. Ellenberger

    The National Institute for Occupational Safety and Health (NIOSH) has continued the research role of the former U.S. Bureau of Mines to develop techniques that will reduce the hazards in the mining wo

    Jan 1, 2000

  • SME-ICGCM
    Stability And Control Of Immediate Roof Of Fully Mechanized Coal Face

    By S. Y. Liu

    Based on the underground measurements, physical model test of simulated materials in the laboratory and finite element analysis, this paper demonstrates the pattern and process of roof fall over the t

    Jan 1, 1990

  • SME-ICGCM
    Floor Heave in Shallow Room-and-Pillar Mining

    By André Zingano

    This paper analyses possible causes for floor heaving in room-and-pillar coal mining. The coal mines are in the southern part of Brazil, where the Barro Branco Coal Seam varies in depth from 20m to 40

    Jan 1, 2002

  • SME-ICGCM
    An Approach To Identifying Geological Properties From Roof Bolter Drilling Parameters

    By Gerald I. Finfinger

    Identifying the properties of overlying rocks in underground mining operations is important to ensure the appropriate roof support design is used to maintain stability of the mine entries. Recently J.

    Jan 1, 2000

  • SME-ICGCM
    Study Of The Impact Of Mining Under Massive Roof At Datong Coal Mines, China (7e96e5f6-0b09-4bad-866d-2ffcd02d33be)

    By Song Yong Jin

    The Jurassic coals at Datong are characterised by their strong, massive sandstone and conglomerate roofs which fail suddenly over large areas, crushing pillars and creating destructive windblasts, col

    Jan 1, 1992

  • SME-ICGCM
    Flexible Support Design For Gateroads Of Retreating Longwall Panels

    By Erdal Unal

    In gate roads where supports are subjected to dynamic loading four times due to retreating longwall panels, it is a real challenge to replace the rigid arches with flexible reinforcement systems and y

    Jan 1, 1993

  • SME-ICGCM
    Developments in Improving the Standard of Installation and Bond Strength of Full Column Resin Roofbolts

    By Peter Altounyan

    Goedehoop Colliery in the Witbank Coalfield of South Africa produces some 8 million tonnes of coal from fully mechanised room and pillar mining methods, using resin anchored bolts as roof support. Inv

    Jan 1, 2003

  • SME-ICGCM
    Measurement of Effects of Interaction and Influence on Mine Layout Design at Maltby Colliery

    By J. S. Oram

    Maltby Colliery, operated by RJB Mining (UK) Ltd is successfully mining the Parkgate seam in Yorkshire at a depth of 1000m using longwall retreat. Extraction in the Parkgate seam is influenced by inte

    Jan 1, 1997

  • SME-ICGCM
    How to Design an Efficient Roof Bolting Plan Based on Simple In-Mine Measurements

    By C. J. H. Brest van Kempen

    The techniques developed should provide a useful tool, not only during the initial formulation of a suitable bolting plan for a new section, but also for periodic check¬ing on the utilization factor

    Jan 1, 1986

  • SME-ICGCM
    Development of Geotechnical Procedures for the Analysis of Mine Seismicity and Pillar Designs

    By Hamid Maleki

    Mining in the Book Cliffs Coal Field of Utah has historically been associated with seismicity because of high-stress environments and the presence of stiff, competent rocks. Recognizing the geotechnic

    Jan 1, 2003

  • SME-ICGCM
    Mapping and Application of Roof Joint Patterns for Ground Control inAn Illinois Mine

    By Kenny D. Basnett

    An analysis of the Roof Falls Data Base (RFDB) for underground coal mines in Illinois for the period 2004?2008 indicated that about 80% of the roof falls occur at intersections and are associated with

    Jan 1, 2011