Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Industrial Relations - A Service For The Line OrganizationsBy Edmund J. Flynn
My subject Is Industrial Relations. Thus, I may appear as an intruder at this annual meeting of the Society of Mining Engineers. But I am no more an intruder here than is Industrial Relations in the d
Jan 1, 1959
-
Vernal Phosphate Operations And Expansion ? IntroductionBy A. C. Alexander
Chevron Resources Company owns and operates an open pit phosphate mine and mill 11 miles north of Vernal, Utah. The plant currently produces 500,000 tons per year of concentrate and has the capacity t
Jan 1, 1985
-
The Apex Project: Development Of A Primary Gallium And Germanium ProducerBy G. M. (Frits) Swinkels
The Apex property, mined in the early Twentieth Century for direct shipping copper, also contains gallium and germanium in iron oxide minerals. In 1982, Musto Explorations Limited began an exploration
Jan 1, 1986
-
Design Of Embankments For Tailings Ponds And Waste Dumps ? IntroductionBy William E. Mead
Although this paper has been entitled "Design of Embankments for Tailings Ponds and Waste Dumps," a better title might have been "Site Selection and Design Planning for Tailings Ponds and Waste Dumps,
Jan 1, 1967
-
Handling Of Smelter Feed - A Purpose-Oriented Approach (333f0a94-d158-49ce-9a29-b14f5346116f)By A. Tobey Yu
The smelter is the heart of a copper producing operation. Its principal function is to reduce and convert raw copper concentrates and/or leach plant precipitates into blister copper before it is refin
Jan 1, 1976
-
Historic Storm Drain Tunneling Revealed by Los Angeles Metro Subway Construction - NAT2024By Christophe Bragard, Jason Choi, William H. Hansmire
This case history provides a physical benchmark of tunneling technology progress comparing an old hand-mined tunnel to a modern 20-ft-diameter EPB TBM that mined in the same ground. This rare opportun
Jun 23, 2024
-
Development Of A Roadheader Mining System At American Borate CompanyBy Charles R. Garrett
The American Borate Company, a wholly owned subsidiary of the Owens Corning Fiberglas Company under a management contract to the Hanna Mining Company, owns and operates an underground borate mine in D
Jan 1, 1985
-
Solution To Problems With Roadheader Installation In Tunnelling ProjectsBy Karl H. Gehring
According to the increasing importance of boom type roadheaders in tunnelling essential problems occuring in the application of these machines are dealt with. Based on a chart including the various s
Jan 1, 1981
-
Geologic Investigation, Prediction And Construction Evaluation For The Cooling Water Tunnels - Seabrook, N.H., Nuclear Power StationBy M. Saidman, R. Pizzuti, R. Hirschfeld, A. J. Desai, J. Rand
Two bedrock tunnels, 170 to 250 feet deep and with a length of about 17,000 feet each, will be used to convey cooling water from the Atlantic Ocean to the Seabrook, N.H., Nuclear Power Plant. Seismic
Jan 1, 1976
-
Interaction Of Bubble Size, Aeration Rate And Slurry Feed Rate In Column FlotationBy Felicia F. Peng
In operation of column flotation of fine coal, the smaller bubbles are required to effectively recovery of fine hydrophobic particles. However, smaller size bubbles alone does not ensure an efficient
Jan 1, 1994
-
Industrial Minerals 1993Production In 1993, it was estimated that United States mine production of barite increased 24%. Barite consumption, either sold or used by grinding plants, increased by 39% and imports increased 4%,
Jan 1, 1994
-
Hydrological Characterization of a Sulphide Waste Rock DumpBy Greg T. Saretzky, Wilson G. Ward
A comprehensive hydrologic study was completed far the waste rock dump at Equity Silver Mine, BC. Characterization of the hydrologic system included geologic structure. topography, surface hydrology a
Jan 1, 2000
-
European Stabilization Practice Using Chemical Systems In Urban TunnelingBy G. Wayne Clough
During shallow tunneling in an urban environment, deposits or pockets of saturated soil or fractured, weathered rock are often encountered. Under such conditions, special problems with tunnel support,
Jan 1, 1976
-
Production Experience And Computerized Evaluations Of The Seabrook Tunnel ExcavationBy Frank X. Bellini, Marc Saidman, Allen J. Hulshizer, Anthony J. Stewart
The cooling water system for the Seabrook Nuclear Station involves 10.25 Km (33,623 ft.) of 6.7 m (22 ft.) OD hard rock tunnels, over one third of which is under and terminating over 1.6 Km (a mile) o
Jan 1, 1981
-
Filtration Of Mineral Concentrates With Outokumpu Ceramec Pc FiltersThe CERAMEC pressure filter is used for the filtration of fine materials whose cake moisture cannot be achieved with vacuum. Development work has been carried out to achieve a well-controlled cake for
Jan 1, 1999
-
Annual Review 1989 – Exploration – Mining – Minerals Processing - CoalBy E. D. Attanasi
The US mining industry finished the traumatic 1980s with a strong economic performance. Worldwide economic growth and capital spending led to tight metal markets. So, 1989 metals prices were generally
Jan 1, 1990
-
Environmental Impact Assessment Of The Kirki (Thrace, NE Greece) Flotation Tailings Disposal SiteBy S. Triantafyllidis
The tailings produced from the Kirki (Agios Filippos) high sulfidation epithermal deposit processing plant are laminated, weakly cemented and their particle size ranges from fine sand to fine silt. Th
Jan 1, 2006
-
A Review of the Various Applications of Gypsum FillersBy S. Veeramasuneni, Qingxia Liu, Susan Dichter
Gypsum (CaSO4-2H2O) is an abundant and naturally occurring mineral. Under elevated temperatures (250 to 300°F) gypsum loses its crystalline water and is converted to hemihydrate (CaSO4 -0.5H2O). The h
Jan 1, 2003
-
Geotechnical Aspects of Paste Fill Introduction at Neves Corvo MineBy Neil Hepworth
Neves Corvo Mine employs four mining and four backfill methods, including paste fill. The paper shows how the strength requirement for backfill in primary stopes was calculated and the relationship be
Jan 1, 2001
-
Site planning process : Application to land use potential evaluation for mined land (Technical Paper)By R. J. Sweigard, R. V. Ramani
Productive and beneficial use of reclaimed surface-mined land is a concern of industry, government, and the general public. A process has been developed that will aid mine planners and public planners
Jan 1, 1987