Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
No. 5 Seam Mining At Kriel Colliery Opencast - SynopsisBy M. D. Raganya
The Kriel Colliery is an Anglo Coal mine which is contracted with Eskom to produce No. 4 seam for Kriel power station. The mine previously found it uneconomical to mine No. 5 seam due to the low quali
Jan 1, 2011
-
Spotlight On Control And SimulationBy B. K. Loveday
A Colloquium on 'Control and Simulation in the Minerals Industry' was held at the Holiday Inn, Milner Park, on 20th September, 1984, in conjunction with the Electra Mining Exhibition. A tota
Jan 1, 1985
-
Technical note: Mud rushes and water inflows in underground mines. A call to arms to save livesBy K. L. Morton
This technical note reviews the status quo of mud rushes and flooding, which have claimed them lives of many people in underground mines in South Africa and globally. Given that the causes are well kn
Mar 30, 2026
-
Planning for post-mining economies: Misconceptions and opportunitiesBy L. Marais
The development of a post-mining economy is generally framed as accessible and desirable and something that mining companies, consultants, and the government can, and should, plan for. It is indeed po
Apr 25, 2025
-
Stakeholder inclusion in the design and development of equipment for the modernizing mining sector in South AfricaBy S. Schutte, J. Pelders, F. Magweregwede, S. Ngobese, W. Botha
A people-centric, systematic approach that involves different stakeholders is considered necessary to successfully address changes associated with modernizing the South African mining industry. In thi
Apr 5, 2023
-
Fan Efficiencies on Mines of the Union Corporation Limited (1f935c8f-ebba-4348-bfc1-61b6b15273dd)By J. A. Drummond
The duties and efficiencies of a number of main and auxiliary fans were determined by standard and thermal methods. Some observations on the effect of water and dirt accumulation on fan performance we
-
Application Of The Reflux Classifier Correlation To The Hydraulic Conveying Of Particles Up Steep InclinesBy P. Stevenson
Correlations for the critical velocity needed to hydraulically convey particles in horizontal, or near-horizontal, pipes are either explicitly dependent upon the shear stress imparted by the fluid upo
Jan 1, 2007
-
Application And Development Of A Water Separation Pump In ChinaBy C. Yu, N. Topliffe, H. Song, W. Yu
The water separation pump is a highly effective alternative for medium pressure (1.6?6.4 MPa) slurry pumping requirements and has been widely used in industry since it was invented in the 1980s. The w
Jan 1, 2007
-
Life Of Business Optimisation - The Mathematical Programming Approach (620ff75a-0d1e-495b-b9ab-af47d4cc7176)By M. L. Smith
A new approach to strategic planning, the Life of Business Optimisation System (LOBOS) optimises production systems from the scale of stopes in a single mine to an entire business strategy consisting
Jan 1, 2007
-
A Computerised Approach to Determining the Self-heating Propensity of CoalBy L. Wade
Laboratory testing of the self-heating propensity of coal, using crossing-point temperature and differential thermal analysis techniques, involves the frequent recording of several temperatures. The v
Jan 1, 1987
-
Trackless Mining at LKAB, SwedenBy L. Hermansson
Trackless mining at LKAB, Sweden by L HERMANSSON (Visitor) Because the usual means of transporting men and material to the working sites was time-wasting and uneconomical, inclined subways were instal
-
Stress-displacement behaviour of the fractured rock around a deep tabular stope of limited spanBy H. A. D. Kirsten
The effects of the mining of deep-level tabular reefs are usually evaluated by use of continuum, elastic mining simulation analyses. This paper gives the results obtained from a series of analyses in
Jan 1, 1989
-
Reticulation Systems For Deslimed TailingsBy P. G. Van Der Walt
This paper deals with the reticulation of deslimed tailings from surface to the stope face underground. Reference is made to the experience gained at the pilot plants operating on four of the gold min
Jan 1, 1988
-
Geostatistical Simulation of a Commercial Polymetallic Nodule Mining SiteBy J. -M. Chautru
A geostatistical simulation of a typical mining site for polymetallic nodules in the North Pacific Ocean is presented. This is the first stage in the design of an industrial mining system. Two varia
Jan 1, 1987
-
An Optimizing Regulator for the Control of Autogenous Milling CircuitsBy I. M. Macleod
An adaptive steady-state on-line optimizing regulator is proposed as an integrated approach to the control of autogenous run-of-mine milling circuits. This optimizing regulator continuously estimates
Jan 1, 1987
-
Ausmelt Technology For Lead And Zinc ProcessingBy Stephen Hughes
Ausmelt Top Submerged Lancing (TSL) Technology has gained widespread commercial acceptance in the lead and zinc industries, as an efficient and highly flexible pyrometallurgical reactor with accompany
Jan 1, 2008
-
Catalyst ManagementBy Lene Hansen
Sulphuric acid plants now and then see unexpected increases in SO2 emissions. Our experience is that it is not always easy for the acid plants to pin point the exact reason for the SO2 increase.
Jan 1, 2009
-
The Application Of Ausmelt?s AM28 Alkyl Hydroxamate Flotation Reagent To Fox Resources? West Whundo Copper Ore At Radio Hill, Western AustraliaAusmelt is supplying commercial quantities of an alkyl hydroxamate flotation collector AM28 for flotation of oxide and supergene base metal ores and tailings. AM28 is a non-hazardous product used as a
Jan 1, 2007
-
A Review of Computer Simulation and Other Programs Developed and Used by the Coal Mining Laboratory, Chamber of Mines Research OrganizationBy J. W. Oberholzer
The use of computers in the South African coal mining industry has increased during the 1980s. Applications at mine level commenced in the financial and personnel areas of payroll systems, mine accoun
Jan 1, 1987
-
Performance Evaluation Of A New Stochastic Network Flow Approach To Optimal Open Pit Mine Design?Application At A Gold Mine ? Synopsis (67824a6c-621d-4d66-8f1a-3155e9a184f1)The optimal design of production phases and ultimate pit limit for an open pit mining operation may be generated using conventional or stochastic approaches. Unlike the conventional approach, the stoc
Jan 1, 2012