    Firing Reliability of Electronic Detonators

    Electronic detonators are receiving increasing acceptance in the blasting industry. Electronic detonators offer several distinctive features over electric and non-el (shock tube) detonators including

    Jan 1, 2010

  • ISEE
    Traffic Tunnels in Rock - Guide Levels for Blast-Induced Vibrations

    By Sven-Erik Johansson, Gosta Rundqvist, Donald Jonson

    In Stockholm a new road traffic system called Södra Länken (Southern Link) will be in operation in late 2004. The total length of the road system is 6 kilometres of which 4,5 kilometres run through tu

    Jan 1, 2004

  • ISEE
    Effect of Impact on Pre-Squibbed Fireworks

    By Paul Worsey, Yasutaka Dote

    The choreography of large fireworks displays dictates electric initiation for precise timing. It has been common practice to pre-squib products before transportation for reducing set up time. A number

    Jan 1, 2009

  • ISEE
    Using Artificial Intelligence and 3D Imaging to Provide Real-time Particle Size Analysis on Haul Trucks

    By Saeed Karimifard, Saman Nouranian, Shahram Tafazoli, Bahram Sameti, Frank Chu, Caitlin McKinnon, Tetiana Konstantynivska, Glen Turner

    Continuing blast optimization is the cornerstone of any mine-to-mill approach, and particle size analysis is a key metric for meeting blast targets to reduce overall energy consumption and operating c

  • ISEE
    Numerical Investigation of Blasting Fume Characteristics in a Block Caving Mine

    By Yong Pan, Purushotham Tukkaraja

    Block caving is a preferred underground mining technique due to its high production rate and low operation cost. Before its final step into a mature caving system using gravity to break rock, drilling

  • ISEE
    Numerical Investigation of Blasting Fume Characteristics in a Block Caving Mine

    By Yong Pan, Purushotham Tukkaraja

    In this paper, CFD was used to investigate the blasting toxic fume characteristics under different entrapping percentages and under changing muck pile properties like broken rock size and porosity. It

    Feb 1, 2020

  • ISEE
    Cross-hole Seismic Measurement of Blast Induced Rock Mass Quality Change: A Review

    By William R. Adamson

    This paper describes some of the results of previously unpublished research studies conducted in underground operations in Chile and Australia, where cross-hole seismic measurement profiles were inter

    Feb 1, 2020

  • ISEE
    Cross-hole Seismic Measurement of Blast Induced Rock Mass Quality Change: A Review

    By William Adamson

    Precise and data driven methods of predicting and modelling blast induced vibration intensity are created and applied under field conditions on a routine basis today. These models are fed with control

  • ISEE
    Close Proximity Trench Blasting Case History

    By Andrew F. McKown, Robert A. McClure

    This paper will describe a trench blasting case history in close proximity to several adjacent structures, including a bridge abutment, railroad tracks, and utility pipes. Some design considerations i

    Jan 1, 1988

  • ISEE
    Full Wall Control Blasting Optimization

    By John Floyd, Maria Rocha, Benjamin Cebrian

    Wall control blasting is needed in most metal mining operations in terms of increasing mineral reserves and assuring the safety of the operation. This type of blasting has the goal to achieve a clean,

    Jan 1, 2018

  • ISEE
    The Recovery of a Dozer from a Highwall Using Blasting

    By Tyler Acorn, Tristan Worsey

    A dozer operator at a surface gold mine accidentally drove a D10 off the side of a highwall. The blade of the dozer caught on the lip of a catch bench 60 ft. (18.3 m), down stopping its descent. The o

    Jan 1, 2014

  • ISEE
    The European Integration through a Major Drill & Blast Tunneling Project

    By Demosthenes (Dennis) Efstratiadis

    After European Council’s Directive 93/15/EEC of 5 April 1993 on the harmonization of the provisions relating to the placing on the market and supervision of explosives for civil uses, the so called ”I

    Jan 1, 2018

  • ISEE
    Journal: Safety Talk / Crisis Management

    By William Reisz

    The explosives and blasting industry has a commendable safety and security record, especially over the last several decades. This is due in large part to our newer technologies, better training and ed

    Jan 1, 2012

  • ISEE
    Success in Advanced Blasting on the Basis of Sonicity -or- What a Blaster Should Know about Wave Dynamics in Rock!

    By H P. Rossmanith

    This contribution addresses the advanced blasting technology which is based on wave propagation theory and fracture mechanics. The new concept of sonicity and the principle of maximizing sonicity in b

    Jan 1, 2010

  • ISEE
    Journal:Security Matters / Procedures to Follow When Explosives Are Missing From Inventory (e.g., Disposition Unrecorded/Unknown)

    Prepare ATF Report of Theft or Loss (ATF Form 5400.5). A Report of Theft or Loss - Explosives Materials must be prepared when it is discovered that explosive materials are missing from inventory. Subm

    Jan 1, 2008

  • ISEE
    Fines Reduction and Its Impact on the Economics of Aggregate Operations

    By J. Eloranta

    "Previous work indicated that the annual per-capita consumption of raw aggregate material averages about 10 tons; half of which is produced by blasting. Given a population of approximately 320 million

    Jan 1, 2017

  • ISEE
    Reactive Ground Learnings and Prevention

    By R. Jacob

    Mining has been around for a long time, and new deposits are being discovered continually but are becoming more complex for processing and typically sulfide in nature. Most of the large easy deposits

    Feb 6, 2023

  • ISEE
    Management's Effect on Drilling and Blasting

    By Alan R. Gadberry

    To resolve drilling and blasting problems, rather than treating symptoms and allowing problems to grow, the mine operator needs to change the way he operates. When a mine operator discovers a drilling

    Jan 1, 1985

  • ISEE
    Summer Internship Project at an Underground Gold Mine

    By Tristan Worsey

    This work was performed during the summer of 2008 during the junior year of a BS in Mining Engineering. It was observed that the mine was having a problem with back break during the blasting of develo

    Jan 1, 2010

  • ISEE
    Blasting 1.5 T of Dynamite, Hang up on a Cliff, 125 m Above a Hydroelectric Power Plant

    By Thierry Bernard, Philippe Dozohne

    May 13th, in the back country of Nice @arice) collapsed a complete piece of mountain, cutting the RN 2085 and destroying a part of Valabfre’s viaduct. The fist inspections of the site showed that mate