Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Energy Partion in Blastiong

    This paper is concerned with the blasting of rock in mining. The most common purpose of blasting rock is to cast it or to disrupt its structure sufficiently for effective digging and subsequent remova

    Jan 1, 1991

  • ISEE
    Fragmentation Interaction with Underground Mining Systems and Productivity

    By B Mohanty, Y C. Lizotte

    Optimization of blast fragmentation in underground hardrock mining requires analysis of its effects on loading and haulage equipment, together with the downstream materials handling system, with the o

    Jan 1, 1991

  • ISEE
    The Journal of Explosives Engineering Vol 21 No 3 - Dynamite Daze

    I was lucky to land a job in the powder business. I was looking for some way to support my wife and first child to be when I saw an ad in the Hercules magazine, “Explosives Engineer” for technical rep

    Jan 1, 2004

  • ISEE
    The 8 Millisecond, "Criterion": Have We Delayed Too Long in Questioning It?

    By Douglas A. Anderson

    The simplest method used to predict ground vibration from blasting is scaled distance -the distance from a blast divided by the square root of the Pounds per delay. Pounds per delay is defined as the

    Jan 1, 1989

  • ISEE
    Optimization of Blasting Pattern in an Underground Coal Mine for Maximum Production with Minimum Roof Disturbance

    By R. Singh, M. Roy, D. Singh

    Success of a blasting pattern in Blasting-off-the-solid (BOS) in Bord (Room) & Pillar method of coal mining is judged by the percentage of pull achieved vis-à-vis the yield of coal produced in a blast

    Jan 1, 2003

  • ISEE
    Coal Loss Due to Cast Blasting--Implication on Mine Economics

    By Sarma S. Kanchibotla

    In overburden cast blasting the explosive energy is used to move a significant percentage of overburden from the high wall to the spoil pile thus reducing the amount of material to be handled by machi

    Jan 1, 1999

  • ISEE
    2004G Volume 2 - Hotshot Auto-Programmable Electronic Detonator System

    By Detnet Solutions

    1. “Daisy-Chain” concept The term “daisy-chain” stems from the fact that when the HotShot? detonators are connected there is a chain or electrical path for electrical current to flow from detonator A

    Jan 1, 2004

  • ISEE
    The Effect of Fragmentation on Loader Productivity (95e8fe1a-7252-44f9-b557-30f0369d4449)

    By Michael D. McGill, Jeff Freadrich

    There are many factors which affect the productivity of a front end loader. One of the most obvious is the characteristics of the material being mined. Characteristics such as size distribution, swell

    Jan 1, 1994

  • ISEE
    The Seismic Visibility of Mining and Its Implications with Regard to the Comprehensive Test Ban Treaty

    By Frank Chiappetta, Karl Zipf, Robert Hopler, Brian Stump, Francois Heuze, Bob Martin, Vindell Hsu, William Walter, Craig Pearson

    The Comprehensive Test Ban Treaty (CTBT) was accepted for signature at the United ,Nations in September of 1996. It ‘now awaits ratification by its signatories, ~including the United States. After the

    Jan 1, 1998

  • ISEE
    The Mechanics and Physics of Electronic Blasting

    By H. Rossmanith

    This contribution introduces the fundamental concepts of wave propagation and fracture mechanics which form the basis of electronic blasting, i.e. precise initiation timing using electronic detonators

    Jan 1, 2003

  • ISEE
    More Efficient Use of Your GPS

    By Wes Bender

    Considering the current interest in Global Positioning System (GPS) usage, it might be timely to look at a more efficient means of utilizing these instruments. The GPS system currently utilizes 28 sat

    Jan 1, 2002

  • ISEE
    Radio Controlled Detonators and Sequential Real Time Blast Applications

    By J M. Laboz Bernard

    Among the numerous technical evolutions in the blasting environment we are going to describe below the concep

    Jan 1, 1995

  • ISEE
    Preparing a Written Blast Plan (1b8a88a8-1e7f-429f-bd71-b32f7b3dbf86)

    By David Ziegler

    A formal blast plan is sometimes required for projects involving rock excavation. A written blast plan submitted with a bid proposal can also be an important sales tool. A blast plan will cover the ba

    Jan 1, 2003

  • ISEE
    The Journal of Explosives Engineering Vol 21 No 3 - Dynamite Daze (5324bd6e-ab26-4a55-9824-a273bcd40423)

    In the office, on the wall to the right of my desk is a large map of the world. Some people stick pins in maps like this to show where they’ve been. If I did that my map would be a mess and look like

    Jan 1, 2004

  • ISEE
    Why Electronic Detonators Practical Demonstration with DSL2 & DSL3 Systems

    By Thierry Bernard, Phillipe Cappello, Jean Marc Laboz

    "The main reasons of the emergence of electronic detonators are linked to:-Local urban development close to mining operation sites-Environment regulations"

    Jan 1, 1995

  • ISEE
    Drill Accuracy

    By Jerald E. Harris

    "Often taken for granted, drill accuracy plays a major role in the relative success or failure of a blast.Expensive technological advances in equipment capabilities, drilling tools, communications, ex

    Jan 1, 1999

  • ISEE
    An Improved Technique for Predicting Vibration Levels from Tunnel Blasting

    By W. J. Birch, M. Kirke

    Despite increasing competition from mechanical methods of tunnelling, the drill and blast method is often still the most viable method of excavating tunnels in strong and abrasive rock. To advance a t

    Jan 1, 2005

  • ISEE
    Vibrating Wire Gages Watch Dynamical Structural Integrity During Blasting

    By A. Feldman

    Measuring dynamic effects on existing structures such as dams and bridges during earthquakes or blasting is frequently done using strong motion detectors. However, a more comprehensive dynamic structu

    Jan 1, 2006

  • ISEE
    Techno-Economics of Blasting in Tunnels Using High Energy Slurries

    By Kate Satish

    M/s Konkan Railways Corporation are constructing 760 kms long rail road in the Western Coastal Region of India. The rail road encounters 75 tunnels through the Western Ghats of India with a total leng

    Jan 1, 1996

  • ISEE
    Improvement on the Fragmentation Results for Effect of the Reflective Planning Generated by the Pre-Split.

    By Jorge Cárdenas Miranda, Hector Espinoza

    Currently in open pit mining in Peru with double bench, it is a challenge to optimize fragmentation in the drill rows near to the slopes to ensure the performance in the loading and haulage operation

    Feb 6, 2023