    Performance Monitoring of Mixed Ground Working Platform for a CCR Surface Impoundment

    By Ali Ebrahimi, Jeremy M. Gasser, Cuneyt Gokmen, Paul J. Sabatini, Roneet Das, William Tanner, Amir Ahmadipur

    There are safety concerns related to operation of heavy equipment over coal combustion residual (CCR) impoundments during construction of the impoundment closure programs. As part of a pilot study pri

    Jan 1, 2019

  • DFI
    Pile Foundations General - .1 Equipment information

    By Bengt H. Fellenius

    .1.1 Prior to commencement of pile installation operation, submit to [Engineer] for [approval] [review], details of equipment for installation of piles. SPEC NOTE: The information requested in 3.1

    Jan 1, 1991

  • DFI
    Field Test Verification Of Ground Bearing Pressure Under Rig Tracks And Implications For Working Platform Design

    By Steffen Schweizer, Tadeusz Brzozowski, Alfred Koller, Michał Topolnicki, Jürgen Wäger, Grzegorz Sołtys

    A full scale test has been conducted to determine ground bearing pressure under rig tracks. The track loads were recorded in real time using Liebherr's Ground Pressure Visualisation system, and the ve

    May 1, 2022

  • DFI
    Statnamic Load Testing Of High Capacity Marine Foundations (62a0500e-14c7-4ace-9608-4578694a5392)

    By Mike Muchard

    STATNAMIC load testing augmented with embedded instrumentation has been successfully used to obtain structural and geotechnical design information on large diameter spun cast concrete cylinder piles o

    Jan 1, 2013

  • DFI
    Cockatoo Island Seawall Seepage Barrier

    By Chris L. Powell, Russell J. Denny

    "The remotely located Cockatoo Island iron ore mine off the Kimberley coast in the northwest of Western Australia has been in operation since 1951. The mine was recently expanded up to about 50 m (165

    Jan 1, 2017

  • DFI
    Cockatoo Island Seawall Seepage Barrier (b791f2b4-d692-4b8a-afba-0ecd9b385be1)

    By Chris L. Powell, Russell J. Denny

    "The remotely located Cockatoo Island iron ore mine off the Kimberley coast in the northwest of Western Australia has been in operation since 1951. The mine was recently expanded up to about 50 m (165

    Jan 1, 2017

  • DFI
    3D FEM Modelling of a Ground Improvement Solution

    By Yazen Khasawneh, Osvaldo P. M. Vitali, John E. Agee, Mohammad Nassim

    A 3D FEM modeling of a ground improvement solution for an ice rink slab with stringent differential settlement limits is presented. Due to the complexity of the geotechnical conditions and strict defo

    Sep 8, 2021

  • DFI
    Jet Grouting For Deep Excavation Support For Re-Entrant Corners

    By Chu E. Ho

    This paper reviews the design of jet grouting at re-entrant corners of excavations where the diaphragm wall and secant pile wall installation were interrupted by existing utilities in the streel sidew

    May 1, 2022

  • DFI
    CPT Methods for Helical Pile Design

    By Howard A. Perko, Margaret Dring, Gerald Verbeek, Scott Slaughter

    Helical piles have become a widely used deep foundation system in recent years due to their many inherent advantages. The cone penetration test (CPT) is commonly used in geotechnical practice to evalu

    Sep 8, 2021

  • DFI
    Recent Developments in Wind Turbine Foundation Design: Post Tensioned Single Pier

    By Mohsen Elsayed, Amr Sallam, Ahmad Mohamed, Xuebing Zheng, Mohamed Alrowaimi

    The foundation is an essential component of the wind turbine that ensures continued operation under stable and safe conditions. Both shallow and deep foundations are utilized to support wind turbines

    Jan 1, 2019

  • DFI
    Artificial Ground Freezing: A Smart Application Below The Airport Of Perth

    By Luca Pingue, Regine Jagow-Klaff, Franco Muratore, Carlandrea Albonico, Damiano Frontini, Rudolf Wernecké

    This paper describes an artificial ground freezing (AGF) application carried out to ensure both watertightness and structural support for the safe excavation of four cross passages of the Forrestfield

    May 1, 2022

  • DFI
    Use of Enhanced Pre-Mixed Self-Hardening Grout for an Emergency Cut-Off Wall Intervention in West Africa

    By Maurizio Siepi, Bruno Vingiani, Claudio Asioli

    "The article describes an emergency rehabilitation intervention executed at Buyo Dam, in Ivory Coast, to intercept a significant water seepage occurring through the foundation of this zoned earthfill

    Jan 1, 2016

  • DFI
    Transformation From Classical 2D To Digital 3D Thinking Process In The Design Of Geotechnical Structures: Perspective Of A Geotechnical Consultant

    By Harald Vogel, Johannes Lachenski, Friedemann Koetzel, Sebastian Schnell

    In this paper, a digital subsoil approach, a work-in-progress, will be presented describing the transformation from a classical 2D to digital 3D thinking process in the design of geotechnical structur

    May 1, 2022

  • DFI
    Steel H-Piles For A 11.7-Mile Long Rail Rapid Transit Project

    By Jeongbok Seo

    The Dulles Corridor Metrorail Project (DCMP) involves the design and construction of a 23.1-mile extension of the Washington Metropolitan Area Transit Authority (WMATA) rail system. The initial 11.7-m

    Jan 1, 2010

  • DFI
    Ground Freezing for Groundwater Cutoff at the Seattle Seawall Replacement Project

    By Brenton Cook, Daniel Mageau, Larry Applegate, Aaron McCain

    "Ground freezing was successfully used to create an impermeable barrier wall along 3,000 feet of the downtown Seattle waterfront as part of the Seattle Seawall Replacement Project. This $360 million r

    Jan 1, 2016

  • DFI
    Secant Pile Barrier Wall Overlap, Thickness, and Position at the U.S. Army Corps of Engineers Wolf Creek Dam, Jamestown, KY

    By Bernard B. Vannoy, Howard W. Gault, Ramesh Bobba

    "Treviicos-Soletanche Joint Venture (JV) and the US Army Corps of Engineers (USACE) have installed a 3800-foot long, 275-foot deep and minimum 2-foot wide secant pile barrier wall at Wolf Creek Dam in

    Jan 1, 2015

  • DFI
    Augered Cast-In-Place Piles Quality Control

    By Rudolph P. Frizzi

    The current trend of increasing augered cast-in-place (ACIP) pile diameter, length, and load carrying capacities demonstrates improvements in installation equipment, increased acceptance, and that qua

    Jan 1, 2001

  • DFI
    Subsurface Component Design and Construction for a High-Rise in a Dense Urban Environment: A Case History of the 181 Fremont Tower

    By Kirk Ellison, Eric S. Lindquist, Peter Faust, Stephen M. McLandrich

    "The 181 Fremont Tower will be an 800-foot high-rise with a 60-foot deep basement located in a dense urban part of downtown San Francisco. The design and construction methods of the subsurface element

    Jan 1, 2017

  • DFI
    Contactless Anchor Measurement with Elastomagnetic Sensors

    By Damir Dedic, Wörle. Patrick

    "Soil properties within a construction project area are analyzed during the planning phase. However, it is only possible to achieve selective soil exploration, even in the case of very extensive inves

    Jan 1, 2017

  • DFI
    Utilizing Real-Time Data and Statistical Analysis for Wet Soil Mixing: A Case History

    By Sunil Arora, Lisheng Shao, Chris Conkle

    "The East Garden Grove - Wintersburg Channel located in Orange County, California, required upgrades along the levees to mitigate potential liquefaction and lateral spreading hazards. The Orange Count

    Jan 1, 2015