Reliability Of Pile Prediction Methods - SummaryBy M. T. Davisson
Pile compression load capacity prediction methods are divided into four categories for purposes of discussing their reliability compared to static load test results. The categories considered are: 1)
Jan 1, 1991
-
United States Capitol Visitor Center - Drilled Shafts, Utility Conflicts, And CommunicationBy Giovanni A. Bonita
The United States Capitol Visitor Center (USCVC) is one of the largest underground structures ever constructed in the Washington, DC, metropolitan area. The 600,000 ft2 (55,750 m2) structure is entir
Jan 1, 2006
-
Drivability Of Piles By VibrationBy Don C. Warrington
This paper is a survey of the various methods and research efforts by which the drivability of piles is determined. First, a brief outline of the basic theory and the important parameters for driving
Jan 1, 1989
-
[Halliburton / Brown & Root Report] - Brown & Root Civil - GeoJet Foundation System - I. IntroductionBy Gordon] [Reavis
Halliburton Services and Brown & Root have developed a unique foundation system that blends oilfield and construction technologies to construct deep foundations which offer significant advantages acro
Jan 1, 1993
-
Interlocking Caisson WallsBy William E. Lardner
Interlocking caisson walls developed from conventional "soldier pile and lagging" shoring. In the latter, the soldier piles receive directly most of the soil load. Natural arches form in the soil behi
Jan 1, 1987
-
Ensuring Performance of Tip Post-Grouted Bored Piles (Drilled Shafts) Through a Comprehensive Quality Assurance ProgramBy Mary Ellen Bruce Large, Antonio Marinucci, Silas C. Nichols
Tip post-grouting of bored pile (drilled shaft) foundations refers to a method where cementitious grout is injected beneath the tip of a shaft to improve the overall performance of the constructed fou
Jan 1, 2018
-
-
The Spadina Pier Cofferdam - Design, Installation & PerformanceBy Jan A. Nilsen
This paper describes a key element in the construction of a major project undertaken by Harbourfront Corporation in its efforts to rejuvenate the central Toronto waterfront. The Spadina Pier forms one
Jan 1, 1987
-
Single-Head Large Diameter Hammer Drill For Bored Piling Actualizes Large Diameter Rock Drilling And Deep Underwater Drilling Operation - SynopsisBy J. Nakayama
Down-the-hole hammer is commonly recognized as the most powerful drilling equipment for weathered to fresh rock formation including boulders. However, its drilling diameter is restricted by reasons of
Jan 1, 1996
-
Cyclic Degradation Of Pile Foundations For Offshore Wind TurbinesBy Fabian Kirsch
Cyclic behaviour of axially loaded piles has been an issue since studies revealed that the capability to transfer skin friction into the ground is highly depending on the level and the number of load
Jan 1, 2011
-
Slurry Walls Executed with the Cutting Soil Mixing Technique: A Case HistoryBy Carnevale Francesco, Bracci Laudiero Alberto, Pampanin Piero
"SummaryIn the Port of Naples a slurry wall has been realized through a sandy layer up to a deep tuff layer using the Cutting Soil Mixing technique.The executed panels have dimensions of 2.8 m x0.65 m
Jan 1, 2014
-
Current Pile Foundation Practice In Taiwan ? SynopsisBy Za-Chieh Moh
This paper presents a summary of the current pile foundation practice in Taiwan. Constructions of driven piles, drilled shafts, and barrette foundations are reviewed. This paper also briefly summarize
Jan 1, 1996
-
The Theory And Practice Of Deep FoundationsBy Xu Ronglie
This paper looks back on the developments and achievements of deep foundations, on the basis of the complex geological conditions and environments in China. It sums up advances in theoretical and appl
Jan 1, 1991
-
The Use Of Micropiles In EstoniaBy T. Ruben
Micropiles have been used for the last forty years to strengthen building foundations. This article gives information about the technology and capacity of micropiles.
Jan 1, 2000
-
Challenges Associated with the Construction of a Cofferdam – A Case StudyBy Eric S. White, Thomas J. Sabourin, Khuram R. Mohib
"This paper presents the challenges associated with the design and construction of a steel sheet pile cofferdam supported with one level of grouted anchors in clean to silty sand with gravel. The init
Jan 1, 2017
-
Establishement Of Bearing Capacity And Integrity Of Cast-In-Place Piles By Means Of Dynamic Pile Tests ? SynopsisBy H. Meseck
Dynamic pile test methods to establish the bearing capacity of driven piles were developed in the USA more than 20 years ago. In the Federal Republic of Germany, the first dynamic pile tests were carr
Jan 1, 2010
-
-
Analysis Of A Deep Excavation In Calgary, AlbertaBy Thomas Lardner
Excavation for The Bow, EnCana, in downtown Calgary, occurred between May 2007 and September 2008. A monitoring programme was used to determine the behaviour of the shoring wall, soil and bedrock dur
Jan 1, 2010
-
The Bawang Pile ? A New Type Of Pile ? SynopsisBy B. Broms
The "Bawang Pile" (in english "onion" pile) described in the article consists of a cased concrete shaft and an expanded base. The steel casing is first driven by an internal drop hammer and then the b
Jan 1, 2010
-
Drilled Pier Foundations In Downtown Seattle - IntroductionBy Thomas M. Gurtowski
This paper presents a summary of allowable bearing pressures and skin friction values that have been used to design drilled pier foundations for support of high-rise structures in downtown Seattle, Wa
Jan 1, 1990