“Value Engineering” — Four Case HistoriesBy Maral Papazian Bedian
"Case 2. 100th Street Bus Depot: Elimination of Deep Caissons in Favor of Spread FootingsThe PROJECTThe 100th Street Bus Depot is a new five-story bus terminal for the New York City Metropolitan Trans
Jan 1, 2003
-
TBM Recovery Shaft Construction - SR-99 TunnelBy Lance Rasband, Richard Hanke, John Starcevich
"The 17.4 meter (57 ft) diameter tunnel boring machine (TBM), the world’s largest at the time of her launch in 2012, locally referred to as “Bertha,” is stuck. Incapacitated due to mechanical failure
Jan 1, 2016
-
Transverse Isotropy Effects On P-Y Curves For RockBy Ehab S. Shatnawi
It is common in practice to design laterally loaded rock-socketed drilled shafts using the p-y curve methods. However, the existing p-y curve criteria for rock were derived either semi-empirically or
Jan 1, 2007
-
Pile-Supported Raft Foundation SystemBy Emre Biringen
Over the past decades, there has been an increasing recognition of the strategic use of pile-supported rafts in design of heavily-loaded structures to reduce total and differential settlements. Howeve
-
Helical Piles Performance In Golestan Loess Deposits Via Fullscale And Physical Modeling TestingsBy Abolfazl Eslami, Fatemeh Rostami, Sara Heidarie Golafzani, Mohammad Arabameri
Collapsible loess is classified as problematic soil found in most continents. The loess immediately collapses under stresses induced by axial compressive loading or the soil weight when exposed to moi
Oct 1, 2022
-
Installing And Testing Multi-bar High Capacity Rock TiedownsBy Andrew Pontecorvo, Steven Lowe, David Sposito
Buildings with large height-to-width ratios require foundations with significant uplift resistance. This paper presents a case study of the permanent rock tiedowns installed for One Manhattan West, a
-
Long, High-Capacity Ground Anchors for Soldier Pile WallsBy Bryan Bet
Retaining wall systems of soldier pile ground anchors (SPGAs) have been used for many decades to stabilize landslide activity. Due to successful use of these walls to address slope instability on the
Jul 1, 2022
-
Deep Mixing Field Trials for Land Remediation: Some 3-Year Results from the SMiRT ProjectBy Ziyad Abunada, David O’Connor, Fei Jin, Abir Al-Tabbaa
"In-situ remediation of contaminated land with deep mixing can enable a multi-technique remedial strategy on the same site combining low permeability barriers, permeable reactive barriers, stabilisati
Jan 1, 2015
-
Anaysis of Landslides and Slopes Stabilized Using One Row of PilesBy Hamed Ardalan, Mohamed Ashour
"CHAPTER 1INTRODUCTIONThe use of piles to stabilize active landslides or to prevent instability in currently stable slopes has become one of the most important innovative slope reinforcement technique
Jan 1, 2013
-
Tension Tests On Driven Pipe Piles In Sand - SynopsisBy Alan J. Lutenegger
A series of tension tests were performed on prototype scale steel pipe piles at two sites to evaluate the influence of scale and pile plugging on the unit skin friction developed in axial tension. The
Jan 1, 2000
-
Full Scale Uplift Load Testing of Micropiles in Cohessionless SoilBy M. Hesham El Naggar, Maged A. Abdlrahem
"Hollow bar micropiles have constructional advantages such as: fast and low-noise and low vibration installation process and small installation equipment, which allow access to tight places. In additi
Jan 1, 2016
-
Piled Raft Floats On MoraineBy Terence P. Holman
Instrumented load testing of high capacity micropiles, followed by detailed analysis and numerical modeling, provided an opportunity for real foundation performance to be incorporated into the design
Jan 1, 2007
-
Silver Star Motors “Tackles” Brownfield Site and Adjacent NYCT SubwayBy Dharmil Patel, Michael J. Chow
"Construction progress is nearing completion at a Brownfield Site for a 100,000sf mixed-use 10 story building plus cellar for Silver Star Motors including a two-floor pre-owned Mercedes Benz showroom;
Jan 1, 2016
-
Costa Rica Circunvalacion Norte Project: Lessons Learned From Foundation DrillingBy Bernardo J. Jiménez, Harlem Lora, Roberto Acosta Mora
Circunvalacion Norte project is currently the most important infrastructure project in Costa Rica. It is the last segment of the urban perimeter highway. Site investigation of local geotechnical condi
-
Torque Correlation Factors For Round Shaft Helical PilesBy Donald A. Deardorff
The capacity of a helical pile can be determined analytically using the individual bearing or cylindrical shear methods which are dependent on soil strength parameters and helical bearing area. The t
Jan 1, 2007
-
Ground Improvement By Jet Grouting For A Natural Gas Combined Cycle Power Plant In TurkeyBy Alp Gokalp
The aim of this article is to present an application of jet grouting technique in stiff clays for foundations of the natural gas combined cycle power plant, under construction in Aliaga, Turkey. The p
Jan 1, 2002
-
The Geo-Impuls Programme: Towards Reducing Geotechnical Failure in the NetherlandsBy Paul M. C. B. M. Cools, Martin Th. van Staveren
In 2010, the 5-years joint industry programme Geo-Impuls started in the Netherlands. The ambitious goal of this programme is to reduce geotechnical failures in our civil engineering projects by half i
Jan 1, 2017
-
A Numerical Study On The Lateral Resistance Of Steel-Concrete Composite Drilled Shafts For Long-Span BridgesBy Juhyung Lee
Recently, large diameter drilled shafts are often used for foundations of large-scale marine bridges with high capacity and required to resist lateral loads. Steel casings are essential in supporting
Jan 1, 2008
-
Extensive Pile Testing of Auger Pressure Grouted Displacement (APGD) Piles, Los Angeles, CaliforniaBy Todd W. Armstrong, Michael D. Reader
"INTRODUCTIONThe Playa Vista Development is the largest urban infill development in the history of the United States. Overall, it encompasses about 1100 acres in the City of Los Angeles and is situate
Jan 1, 2005
-
PSC Piles Overcome Challenges for $650m Power PlantBy Tim Siegel, III Fondren, Billy Camp
"INTRODUCTIONThe new $650 million power block at Santee Cooper’s Cross Generating Station in Cross, South Carolina is being constructed on driven pre-stressed concrete (PSC) piles. S&ME, as geotechnic
Jan 1, 2004