Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Designed, Load Tested, Installed, And Integrity Tested ACIP Piles At Lovers' Key Site In Southwest FloridaBy Gregory A. Stephan
A case history of design, prediction, instrumented static load tests on probe piles, installation monitoring, and integrity testing of production piles is presented. Based upon project-specific subsoi
Jan 1, 1999
-
2013 OPA Winner: Wolf Creek Dam RehabilitationBy Fabio Santillan, Michael F. Zoccola
"Wolf Creek Dam and Lake Cum berland in Russell County Kentucky is operated by the United States Army Corps of Engineers (USAGE) Nashville District It is a combination 3,940 ft long (1,200 m) non-zone
Jan 1, 2013
-
The Practical Application Of Pile Reuse At Bow Bells House, City Of LondonBy Justin Phillips
The redevelopment of Bow Bells House in London has thrown up a number of challenges that will increasingly be faced by developers of congested sites. In the context of pile reuse this paper examin
Jan 1, 2008
-
Assessment of Analysis Techniques for Multi-Plate Anchors in SandBy James P. Hambleton, Anastasia Nally
This work focuses on the numerical simulation of multi-plate anchor systems (e.g., helical anchors) in sand subjected to vertical loading. In assessing the stiffness and capacity of these multi-plate
Jan 1, 2019
-
Case History: Comparison of CSL Results to Physical ObservationsBy David S. Graham, Paul J. Axtell
Crosshole Sonic Logging (CSL) non-destructive integrity testing identified anomalous readings near the base of a 6.5-foot diameter drilled shaft rock socket. The anomaly was confirmed to be a defect b
Jan 1, 2019
-
Design, Prediction And Performance Of Tied Back Shotcrete Walls Supporting Masonry Hospital StructuresBy Frank Borda
Two recent projects were completed in Ontario, Canada for major hospital additions that involved excavation support of heritage masonry structures. Conventional continuous caisson wall schemes were re
Jan 1, 2004
-
Practice Of Large Diameter Stepped Section Bored Pile Foundation Of A Deep Water BridgeBy Cen Guoji
The foundation of bored pouring concrete pile have been adopted in the bridge engineering of China since early in the sixties. They demonstrated tremendous technical advantage and achieved notable eco
Jan 1, 1991
-
Caveat Emptor Or A Buyer's Guide To Pile Integrity Testing - IntroductionBy Joram M. Amir
During recent years, the integrity testing of piles has made considerable progress. With the availability of portable and powerful computers, practically all integrity testing equipment is now digital
Jan 1, 1999
-
Session 7: Grouting Compaction Grouting For Sinkhole Repair at WAC Bennett DamBy James Warner
Investigations of the sinkhole indicated that the loose, disturbed ground was completely encircled by dense competent core. This confinement substantially increased the effectiveness of the compaction
Feb 10, 2003
-
Construction Of Foundations For Zuari, Mandovi Railway Bridges In Goa ? SynopsisBy N. V. Nayak
Konkan Railway Project is one of the most ambitious railway construction projects in India, involving construction of a 760.km long, Broad Gauge (1676 mm), single track railway line, connecting Roha i
Jan 1, 1996
-
Drilled Displacement Rigid Inclusions Support Port-Based Cement FacilityBy Morgan NeSmith
The Port of Palm Beach is a full-service landlord port in Riviera Beach, Florida. The port and its tenants process more than $14 billion in commodities. About 80% of these are exports, which makes the
Apr 1, 2023
-
New Pile for Reduced Underwater NoiseBy Dardis J. T. II, P. G. Reinhall
"Impact pile driving of steel piles in marine environments produces extremely high sound levels in the water. It has been shown that current pile driving noise attenuation techniques provide limited n
Jan 1, 2017
-
Mixing Proportion Design and Construction Management for Application of Cement Deep Mixing Method to Construction Project on Controlled Final Landfill Site in JapanBy Yoshinori Kurumada, Masaya Watanabe, Kenji Sasa
"The Port of Yokohama is strengthening its international competitiveness as a strategic container port in order to respond appropriately to global exchange and shipping demands. Thus, the Minami Honmo
Jan 1, 2015
-
Real-Time Monitoring During Shaft Contruction For The Sound Transit Ulink I-5 UndercrossingBy Pierre Gouvin
This paper describes the design, installation and monitoring of a state of the art real time geotechnical/structural instrumentation monitoring system to facilitate tunnel construction under Interstat
Jan 1, 2010
-
Construction-Induced Vibrations And Green Concrete: Literature Review And Case HistoryBy William M. Camp
Construction-induced earthborn vibrations have long been recognized as a potential problem with respect to the constructed environment and various vibration criteria are in use to prevent damage. A s
Jan 1, 2010
-
Blast Densification Of Fine TailingsBy Brian W. Wilson
A case study is presented that describes the design and implementation of a combined blast densification and deep dynamic compaction program which was undertaken to improve the foundation soils for a
Jan 1, 2010
-
Wick Drain Guide Specification (Method)"1.0 DESCRIPTIONThis work consists of furnishing all necessary labor, equipment, and materials to install prefabricated vertical (wick) drains in the ground in accordance with the Plans and as specifi
Jan 1, 2014
-
Evaluation Of Ultimate Resistance Of Steel-Concrete Composite Drilled Shafts Through Static Loading TestsBy Moonkyung Chung
Static pile load tests were performed in order to evaluate bearing capacities and mechanical behaviors of three different pile types: (1) steel-concrete composite drilled shaft with rebar reinforcemen
Jan 1, 2010
-
A New Type Of Wave Equation Analysis ProgramBy Don C. Warrington
This paper describes a new wave equation analysis program called ZWAVE, which is a program specifically for external combustion hammers. The program is de-scribed in detail, the discussion dealing wit
Jan 1, 1988
-
Design Of Well Cap, Pier And Well Steiming At The Junction Using Strut-And-Tie Model - SynopsisPier, well cap and steining junction is a complicated 3-d re-ion. The prevalent design procedure for the pier, well cap and steining in isolated manner is not rational. In absence of an integrated app
Jan 1, 1996