Post-Katrina Emergency Interim Flood ProtectionBy Fred Fuchs
"Most deep foundation work is either unseen by the general public or viewed as an inconvenience in their daily lives. Hurricane Katrina changed that perspective for everyone in New Orleans — and many
Jan 1, 2008
-
Alternative Deep Foundation Solutions – DMM at LPV-111 in New OrleansBy Peter Cali, Wesley Schmutzler
"The Deep Mixing Method (DMM) was employed to raise and support the LPV (Lake Pontchartrain and Vicinity) -111 Levee in New Orleans. Even using innovative technologies, the tight schedule to achieve t
Jan 1, 2017
-
Piled-Raft Foundations in BelarusBy V. A. Sernov
"One of the ways to increase the bearing capacity of a piled foundation is to take into account soil resistance in the base of the raft. Piled raft is similar to shallow foundation and can transfer si
Jan 1, 2016
-
Analysis of Pile Interaction under Lateral Cyclic Load in Cohesiooless SoilBy Sudip Basack
"The topic of pile foundation subjected to lateral cyclic load is an age-old problem confronted by Geotechnical Engineers. The environment prevalent in ocean and shorelines necessitates the piles supp
Jan 1, 2005
-
Improvements in Deep Compaction Using Vibratory Pile Hammers (a877ad8a-6d27-4e33-a419-f0edb9bac870)By Dennis Nottingham
"Increased interest in seismic soil liquefaction and preventative soil stabilization sets the stage for improved deep compaction methods using pile driving techniques. In 1971, L.B. Foster Company per
Jan 1, 2005
-
Stone Column Treatment and Elaborate Load Tests Verification for Improving Subsoil Conditions on a Large-Scale Residential Development ProjectBy Vijaya Bhushan Rao, Jason Redgers
A substantial lifestyle destination in the United Arab Emirates, in the Emirate of Abu Dhabi comprising of 1315 villas, town houses and non-residential leisure facilities is built over an area of 280
Sep 8, 2021
-
Application of Non-Destructive Testing to Drilled ShaftsTechnically speaking, the concept of NDT sounds like the "magic bullet" when faced with a questionable drilled shaft. All the Contractor or Engineer needs to do is select an NDT method, apply it, unde
Jan 1, 2004
-
Vibrations Caused by Pile Driving (bb4f9935-841f-4be3-bb1b-f95875d26e25)By K. Rainer Massarsch
"Part 1 of 2 By K. Rainer Massarsch, Geo Engineering AB, Stockholm, SwedenINTRODUCTIONConstruction activities, such as driving of piles and sheet piles, soil compaction or excavation generate noise an
Jan 1, 2004
-
Long Term Performance of Grouts and the Effects of Grout By-ProductsBy Stephan A. Jefferis
I presume that the questioner is not asking about the reduction of sulfate in groundwater to hydrogen sulfide as a result of biological activity promoted by organics in the grout hardener and that the
Feb 10, 2003
-
Innovative Soe Solutions For Shaft Construction: Getting To Depth With Diaphragm Walls At Westerly Storage TunnelBy Ryan Sullivan, Lisa Smiley, Jewels Stover
The Westerly Storage Tunnel (WST) Project is part of Project Clean lake, the North East Ohio Regional Sewer Dist years. When completed in 2020, WST will be nearly 2 miles of 25-ft diameter tunnel 200-
-
Design And Field Comparison Of Ground Improvement And Bored Piles For Large Diameter Steel Water TanksBy Vijaya Bhushan Rao, Ali Semercioglu, Jason Redgers
Large diameter steel water tanks with high storage capacities impart heavy loads deep into the ground, generally requiring deep foundations to adequately support them. The use of ground improvement as
Oct 1, 2022
-
30 Hudson Street Foundation Design and Construction in Variable RockBy Joel Moskowitz, George J. Tamaro
"A new office complex is being constructed within 25m of the Hudson River in New Jersey. The project, about 140m by 100m, will include 4 basements under the entire footprint. The perimeter was to be s
Jan 1, 2004
-
Interpretation of Seismic Response Data from Full Scale Helical Pile TestsBy A. B. Cerato, M. K. ElSawy, A. Elgamal
"Helical piles are gaining popularity as foundations for new construction as well as retrofitting option for deficient foundations. More recently, large diameter helical piles are used to support stru
Jan 1, 2017
-
Slope Repairs in a Tight Footprint: Slope Stabilization Using Multiple TechnologiesBy Dan Mahrt
"In June of 2009, a slope failure occurred along River Road in Bismarck, North Dakota. The slope failure affected approximately 300 feet of River Road with vertical displacements up to 3 feet, resulti
Jan 1, 2016
-
Building a High-Rise Adjacent to Transit Tunnels in San Francisco (6bdbc52a-94a2-4c48-ba21-cc4450dc649d)By Lori A. Simpson, Linda H. Liang
A high-rise building, consisting of two tower structures occupying the entire site, is in construction in San Francisco. The North Tower will consist of 12 and 35 stories above a one-level basement. T
Jan 1, 2017
-
Building A High-Rise Adjacent To Transit Tunnels In San FranciscoBy Lori A. Simpson
A high-rise building, consisting of two tower structures occupying the entire site, is in construction in San Francisco. The North Tower will consist of 12 and 35 stories above a one-level basement.
-
Cast Insitu Piling For The King's Wharf Project, Sydney, AustraliaBy Slav Tchepak
The King's Wharf development is located in Sydney's Darling Harbour area. The site was originally used for industrial maritime purposes, which over the years has been reduced to accommodatin
Jan 1, 2000
-
Characteristic Features of Deep Excavations in the Metropolis and the Probable Hazards.By Sudhir Kumar Das
"The exorbitant price of the land in the metropolis has restricted the horizontal expansion and compelled the owners, the developers and the engineers to opt for vertical expansion. This has resulted
Jan 1, 2015
-
Modelling The Behaviour Of Pile Groups With Favourable Group EfficienciesBy A. V. Rose
A redevelopment in the City of London has been constructed with a piled foundation system that is believed to be the first of its kind. The purpose of the research is to explore this novel foundation
Jan 1, 2011
-
A Fully Connected Jobsite is a Must for the FutureBy Christian Hoyme, Jochen Maurer
Most of the current foundation projects are suffering from disconnected information silos. In the first silo there is the planning of the project with corresponding data, presented by paper or digital
Jan 1, 2019